LIFE SUPPORT REQUIREMENTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP68B00724R000200230039-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 12, 2016
Document Release Date: 
February 8, 2002
Sequence Number: 
39
Case Number: 
Publication Date: 
November 21, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP68B00724R000200230039-3.pdf182 KB
Body: 
Approved For Release 2002/06/13 : CIA-RDP68600724R000200230039-3 RA IDEA 3 3-66 Copy 2 of 7 21 Nevember 1966 for wt.riei, 06A pport Requirements 1. The requirements for funds to previd Protective Assemblies (PM's) for the =ALM program can only be estimated at this time. Exact cos figures for FY-67, FY-66, FY-69 will be available only when technical proposals and cost summaries are obtained from the coatractors concerned and only when exact delivery schedules are estabtished. However, the following categories of re- quirements and estimated cost figures represent a starting point. 2. tontract for Initial Issue Ll %ill require two complete as TThs grviag a tete sent of 44 PPA's. This includes PPA's for two LAC and a test subject for possible chamber, flotation Using au estimated cost of par 11VA program, the total cost figure would be delivery of these items will involve both funding. 3. Contract tar Tech Rps. One additional trewil tech rep will be required 0 during the period when both the old and the new systems are being utilized. viten Station 0 reaches the point where only the new system is being used, this requirement can be dropped. A David Clark tech rep will be required at Station 0 on permanent basis. The requirement for tech reps at 3tation R are less clear at this time. If there is a period of time that both old and POW equipment are in use at II, then one additional Firewel tech rep will be required for this period only. A David Clark tech rep will be required at R on a permsnent basis beginning 25X1A vheuever they receive the new eystem. The cost e tech reps would le for 1Y-67 and possibly for bcth FY-66 and 7Y 5 . jump testing in addition to ProJect sal 25X1A 25X1A sutject require- est pilots nd/or pilots. OXCART Revever FY-66 25X1A 25X1A 25X1A Approved For Release 2002/06/1 B00724R000200230039-3 25X1A 25X1A 25X1A 25X1A 25X1A Approved For Release 2002/06/13 : CIA-RDP68600724R000200230039-3 4 Theiu it stiested cos per year. Et' 117o tractor FdroAshed Tra kzictory trift1izg of preaeutly assignee u paeat techtcats, end flight surgeons, estimated I Iiz FT-67 and an aiditional 6. Contracts for AGZ eSn other Qugport A isately or Stet I be requ pport ea 7. &iisry of Reps (d) Training (e) AGS ( ) Totals: trill be required or to 1 July 1967. FY-66 to supply S ty. 25X1A t. iptit C jestr. obtain lona/ 'fat Approved For Release 2002/06/13 : CIA-RDP68600724R000200230039-3 25X1A 25X1A 25X1A 25X1A! Approved For Release 2002/06/13 : CIA-RDP68600724R000200230039-3 butiol: b/OSA WM/06 2 WRILL/00A 3 - AM/RI1j/04A 4 - RAS/0/06A 5 - COMPT/MA 6 - chroaa 7 - R6/06A IDEA., -34 2366 gp (21 Itvember 1966) Approved For Release 2002/06) 13 : CIA-RDP6 8600724R000200230039-3 25X1A 25X1A