IDEALIST OPERATIONAL SUMMARY AND STATUS (NOVEMBER 1966)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP68B00724R000200170009-3
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
3
Document Creation Date:
December 15, 2016
Document Release Date:
November 6, 2002
Sequence Number:
9
Case Number:
Publication Date:
December 6, 1966
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP68B00724R000200170009-3.pdf | 101.19 KB |
Body:
Approved For Release 2002/11/13 : CIA-RDP68BQ724R000200170009-3
,vw
0
IDEA 3403-66
Copy 5of 6,
- =C 1966
MEMORANDUM FOR: Comptroller, OSA
SUBJECT: IDEALIST Operational Summary
and Status (November 1966)
25X1
REFERENCE: Memorandum from D/SA to D/O/OSA
and D/R&D; dated 26 May 1965;
Subject: OSA Monthly Report to
DD/S&T and Program B Q
Review Report to D/NRO 25X1A
Attached is the IDEALIST Operational Summary and
Status report for the month of November 1966.
WILLIAM E. SHELTON
Colonel USAF
Deputy for Operations, OSA
Attachment - 1
As stated above
IDEA/OSA aea (2 Dec 66)
Distribution:
#1 - Compt/OSA
#2 - D/O/OSA
#3 - SAS/OSA
#4 - IDEA/OSA
#5 - RB/OSA
#6 - Holdback
1 :1
Approved For Release 2002/11/13 : CIA-RDP68B00724R0002001700
25X1A
25X1
GROUP I
Excluded from ?ulomatir.
9-36owngrading and
,declassification
Approved,Epr Release 2002/11/13: CIA-RDP68BQU24R000200170009-3
TOP SECRET
25X1A
IDEA 3403-66
Attachment 1
OPERATIONAL SUMMARY AND STATUS
I. General Summary
A. One Agency U-2 overflight (Mission C216C) was made
on 26 November 1966. In addition C196C was alerted for
3 November and C206C for 23 November. C196C was cancelled
25X1( due to C206C was cancelled due to a
25X1A
cumuiaation oz two iactors. 1 ireit a postponement
to a later date was desired. Ultimately cancellation was
dictated due to weather.
B. I reverted to CAT III status on 25 November..
No new ETOR predicted for him since present plans call for
him to receive additional ground and flight training in the
U-2.
25X1A C. have completed T-33 training and
are 80% U- .trained. U-2 flight training is scheduled to
begin in early December.
25X1
25X1 C
D. Three flight tests forl were flown . 25X1A
during the month. Fuel data was obtained on the first flight.
It compared very favorably to the October results. -Ballistic
data was collected on the first and-third sorties and it is
anticipated that quite valid drop information can now be
computed. The second sortie air aborted due to ground radar
inoperative.
for shipment of this unit to
E. Two flight tests were flown during the month for
check out of the modified,"H" Configuration in preparation
F. One flight test was flown for the purpose of
obtaining fuel data with a 1720 gallon load. This test was
successful. Drop tanks were released and excellent fuel
consumption information obtained. Two other sorties were
flown to obtain fuel data during the month.
25X1A
25X1
TOP SECRET
Approved For Release 2602/11/13': CIA-RDP68B00724R000200170009-3
Approved,.gr Release 2002/11/13: CIA-RDP68BQ24R000200170009-3
O
IDEA 3403-66
Attachment 1
Page 2
II. Product Improvement
A. Four APN-153/ASN-66 Doppler Navigation Systems have
been contracted for, for use on operational missions. First
deliveries are anticipated to be in January.
B. No tests were flown on.the Air Data Computer/Tape
Altimeter due to higher priority requirements. Tests should
be completed during the month of December.
C. Test flights were successfully completed on the "H"
Camera and the system was deployed.
I
25X1
Approved for Release 2002/11/13 : CIA-RDP68B00724R000200170009-3