IDEALIST OPERATIONAL SUMMARY AND STATUS (NOVEMBER 1966)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP68B00724R000200170009-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
3
Document Creation Date: 
December 15, 2016
Document Release Date: 
November 6, 2002
Sequence Number: 
9
Case Number: 
Publication Date: 
December 6, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP68B00724R000200170009-3.pdf101.19 KB
Body: 
Approved For Release 2002/11/13 : CIA-RDP68BQ724R000200170009-3 ,vw 0 IDEA 3403-66 Copy 5of 6, - =C 1966 MEMORANDUM FOR: Comptroller, OSA SUBJECT: IDEALIST Operational Summary and Status (November 1966) 25X1 REFERENCE: Memorandum from D/SA to D/O/OSA and D/R&D; dated 26 May 1965; Subject: OSA Monthly Report to DD/S&T and Program B Q Review Report to D/NRO 25X1A Attached is the IDEALIST Operational Summary and Status report for the month of November 1966. WILLIAM E. SHELTON Colonel USAF Deputy for Operations, OSA Attachment - 1 As stated above IDEA/OSA aea (2 Dec 66) Distribution: #1 - Compt/OSA #2 - D/O/OSA #3 - SAS/OSA #4 - IDEA/OSA #5 - RB/OSA #6 - Holdback 1 :1 Approved For Release 2002/11/13 : CIA-RDP68B00724R0002001700 25X1A 25X1 GROUP I Excluded from ?ulomatir. 9-36owngrading and ,declassification Approved,Epr Release 2002/11/13: CIA-RDP68BQU24R000200170009-3 TOP SECRET 25X1A IDEA 3403-66 Attachment 1 OPERATIONAL SUMMARY AND STATUS I. General Summary A. One Agency U-2 overflight (Mission C216C) was made on 26 November 1966. In addition C196C was alerted for 3 November and C206C for 23 November. C196C was cancelled 25X1( due to C206C was cancelled due to a 25X1A cumuiaation oz two iactors. 1 ireit a postponement to a later date was desired. Ultimately cancellation was dictated due to weather. B. I reverted to CAT III status on 25 November.. No new ETOR predicted for him since present plans call for him to receive additional ground and flight training in the U-2. 25X1A C. have completed T-33 training and are 80% U- .trained. U-2 flight training is scheduled to begin in early December. 25X1 25X1 C D. Three flight tests forl were flown . 25X1A during the month. Fuel data was obtained on the first flight. It compared very favorably to the October results. -Ballistic data was collected on the first and-third sorties and it is anticipated that quite valid drop information can now be computed. The second sortie air aborted due to ground radar inoperative. for shipment of this unit to E. Two flight tests were flown during the month for check out of the modified,"H" Configuration in preparation F. One flight test was flown for the purpose of obtaining fuel data with a 1720 gallon load. This test was successful. Drop tanks were released and excellent fuel consumption information obtained. Two other sorties were flown to obtain fuel data during the month. 25X1A 25X1 TOP SECRET Approved For Release 2602/11/13': CIA-RDP68B00724R000200170009-3 Approved,.gr Release 2002/11/13: CIA-RDP68BQ24R000200170009-3 O IDEA 3403-66 Attachment 1 Page 2 II. Product Improvement A. Four APN-153/ASN-66 Doppler Navigation Systems have been contracted for, for use on operational missions. First deliveries are anticipated to be in January. B. No tests were flown on.the Air Data Computer/Tape Altimeter due to higher priority requirements. Tests should be completed during the month of December. C. Test flights were successfully completed on the "H" Camera and the system was deployed. I 25X1 Approved for Release 2002/11/13 : CIA-RDP68B00724R000200170009-3