RESUME OF MISSION C216C

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP68B00320R000100020005-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
November 16, 2016
Document Release Date: 
January 24, 2000
Sequence Number: 
5
Case Number: 
Publication Date: 
December 12, 1966
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP68B00320R000100020005-5.pdf151.71 KB
Body: 
25X1A IDEA 3404-66 Copy ,5 of 7 12 DEC 1966 Approved For Release 2000/05/04T1C1f8B00320R000100020005-5 IDEALIST MEMORANDUM FOR THE RECORD SUBJECT: Resume of Mission C216C 1. General: Mission C216C (Canned Route 1045) was originwlly a e ted for 25 November 1966, Zulu date. Due to marginal weather at the pre Go-No-Go briefing, a twenty- four hour delay was passed to all concerned. Briefed take off time of 0230Z, 26 November was made good from - 25X1C General area covered was that area on mainland from south of 25X1C Shanghai to abeam f r._l o periodic coverage Preplanned Mission Data: Distance Time to Hi Cone Penetration Altitude Mission Profile Take-off Fuel Planned Fuel Reserve at Hi Cone 25X1 C 1752 NM 4+37 Hours 69,000 Feet Maximum Altitude 1020 Gallons 160 Gallons Targets. This mission was planned to cover twenty three COMOR targets of which seven of these were high priority 2. Mission Data as Flown: Penetration of denied area was made goo southeast o Luchiao Airfield at 69,000 feet. Flight proceeded as briefed to a point approximately thirty miles west of Chu Hsien Airfield. Mission was aborted at this Approved For Release 2000/05/dPPC RCl 68B00320R00 IDEALIST 25X1 C Approved For Release 2000/05/04TOO168B00320R000100020005-5 IDEALIST IDEA 3404-66 Page 2 point due to System 13C overheat light. Exit from denied 25X1C :territory was approximately fifty miles northeast of Fuchou. Landing was at for a mission duration of 4+03 hours. An estimated two-thirds of the preplanned route was flown. Although a portion of the route was not flown, twenty COMOR targets were covered plus an additional forty of varying interest to the Intelligence Community. Thirteen of the originally scheduled twenty three COMOR targets were photographed. First time base line coverage was obtained on Chungan Airfield. A number of KOMAR missile patrol boats were detected at Santu Naval Base which should be of interest 25X10 to Weather was generally as briefed. The majority o the rou e, as flown, was predominately Category I weather with the exception of the most northern turn point near Chang Chiao Airfield which was Category III and IV. 3. Air Defense Reactions (ChiCom): Radar Tracking: 25X1 D 4. Fighter Reaction: Fighter reaction was observed on three occasions during this mission. The first occurred near Chang Chiao Airfield. No hostile action was apparent. The second incident happened about fifty miles south of Chiang Chiao Airfield. Enemy aircraft was sighted climbing rapidly from the 6 o'clock position about 5 to 6,000 feet below. Bogie passed the U-2 an estimated four?or five miles to the right. The last reaction was near Chin Hua Airfield. Enemy aircraft was sighted 4 to 5,000 feet below the mission air- craft at the 10 o'clock position climbing rapidly. Bogie passed two to three miles in front. of the U-2. This last intercept attempt appeared to be a frontal attack which is not the normal ChiCom tactic. Identification of the type of Approved For Release 2000/05/04 :'WA-fR 0032OR000100020005-5 IDEALIST Approved For Release 2000/05/0 QQg7 68B0032OR000100020005-5 IDEALI IDEA 3404-66 Page 3 25X1 D 25X1A MIG fighters was not ascertained and their launch base(s) can not be determined. 6. Materiel: a. Article 348 was originally scheduled for Mission C216C. When the pre-flight inspection was conducted, it was found that the System 13C destruct relay had failed. The decision. was made to substitute Article 385 which had been readied as a back up. Both aircraft were configured identically except for the tracker. The T-35, lightweight tracker, was desired trackermade. with the Tw70chheavycouldn't but due to aascflowntime, was Article 385 b. The abort made after 2+45 hours of the mission was caused by the System 13C overheat light. The over- heat light came on after 2+30 hours of the mission. pilot Inflight switching procedures were followed by to no avail. Post-flight inspection revealed an in- dentation in the cover seal which caused a pressurization leak. The seal was replaced and the pressure box pressure checked all right. Pressure check on pre-flight inspection was acceptable. The only other write up was the cabin temperature control which gave a slow response in automatic and manual. 7. Communications: All communication equipment including wor ed satisfactorily. Lt. Co one C/IDEA/OSA Approved For Release 2000/05/04: CTQ'F 610320R0001 00020005-5 25X1A Approved For Release 2000/ DP681300320R000100020005-5 IDEALIST IDEA 3404-66 Page 4 25X1A IDEA/OSA aea (9 Dec 66) Distribution: #1 - D/SA #2 - D/O/OSA #3 - Intel/OSA #4 - M/OSA #5 - IDEA/OSA #6 - RB/OSA #7 - Holdback Attachments - 2 1. Route Overlay. 2. Targets Covered. Approved For Release 2000/05/0 Ot:1k68B00320R000100020005-5 IDEALIST