CONTRACT PR-8200

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP67B00820R000400020038-9
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
16
Document Creation Date: 
November 17, 2016
Document Release Date: 
April 18, 2000
Sequence Number: 
38
Case Number: 
Publication Date: 
March 3, 1960
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP67B00820R000400020038-9.pdf355.9 KB
Body: 
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 March 3, 1960 Subject: Contract PR-8200 Attached is our definitive proposal for the work contemplated on the above contract. This proposal is based on the 18" f/3.8 system which is described in Document No. 119, attached. This proposal is based on the contract extending through June 1962 so that it will be completed with final acceptance of the last of the six (6) systems. Our proposal consists of the following documents: A. Statement of Work, Attachment I B. Cost Data, Attachment II (Exhibits "A" through "F") C. Terms and Conditions, Attachment III D. Contractor's Document No. 119, Attachment IV The estimated costs presented in this proposal are based on the following: 1. This proposal covers only the services, materials, etc., to carry the program through the time that all units have been accepted. It does not include any "operational" field service, M & 0, or spare parts. A budget estimate for these items will be submitted separately in the near future. 2. A single quartz window glazing has been included. If it proves necessary to provide a more complex window, we propose that this be con- sidered a change in scope. You will note that the Statement of Work under paragraph 1.2 indicates that we have completed Item 1 and are submitting our recommendation in Document No. 119, which is Attachment IV. We are proceeding with the final design of the system under Item 2 of the Statement of Work and would, there- fore, appreciate your approval of Item 1 as indicated in the Statement of Work. Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 Page 2 March 3, 1960 In regard to the no-charge usage of facilities requested under para- graph II.A. of Attachment III, it will be necessary that New York Air Procurement District be furnished with a letter which states that this contract (AF 33(600)-37827) was negotiated on the basis of such no-charge usage. For your information we have attached a draft of such a letter. When we receive a copy of this letter, we can then take appropriate administra- tive action with the Administrative Contracting Officer on Contract AF 33(600)-28501. Please do not hesitate to contact me if you require any additional information. CMH: pma Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 March 2, 1960 Attachment II COST DATA The cost data is presented as follows: 1. Individual cost sheets for each major task, Exhibits "A" through "IF'. 2. Summary of prime costs by cost elements based on Exhibits "A" through "P", Schedule "A". 3. Cost breakdown by items, Schedule "B". 4. Summary of estimate, Schedule "C". 5. Estimated fiscal funding by quarters, Schedule "D". 6. Capital equipment requirements, Attachment "A". Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 Approved for Release 2000/08/28 : CIA-RDP67B00820R00040002003Bibit A, Page 1 1. Estimated Costs for Prototype (Reference Document # 84 for Descriptions of Activities A. B. C. Project Direction (21 months) Project Control (21 months) Creative Engineering (Excluding Windows) 1. Engineering 2. Purchases STATINTL 3. Fabrication 4. Sub Contract 5. Travel 6. Reports and Printing D. Reliability Engineering Fabrication STATINTL STATINTL Sub Contracts Vibration V/H Sensor E. Hardware (Excluding Win&,ws) 1. Glass a. Material b. Fabrication c. Tooling Approved For Release 2000/08/28 : Approved For Release 2000/08/28: CIA-RDP67B00820R0004000200a8X--abit A, page 2 2. Metal a. Material b. Fabrication c. Sub Contract d. Tooling 3. Purchases 4. Quality Control 5. Travel F. Windows 1. Development a. Engineering b. Fabrication c. Purchases d. Sub Contract e. Travel 2. Manufacturing a. Material b. Fabrication c. Quality Control d. Tooling STATINTL Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 See Attachment "A" for Capital Equipment Req'd in a Mon to this tooling Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Exhibit B 2. Estimated Costs for Field Support Equipment (Reference Document #84 for Description of Equipment) A. Engineering B. Glass C. Purchases D. Fabrication E. Sub Contract F. Quality Control G. Travel H. Reports and Printing Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08128 : CIA-RDP67B00820R00040002003?5&ibit C 3. Cost Estimate for Spare Parts (including,Windows) A. Engineering B. Glass C. Purchases D. Fabrication E. Quality Control F. Travel Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28: CIA-RDP67B00820R0004000200 x-Ribit D 4. Estimated Costs for Acceptance Test Program Prototype and five additional systems Duration of Acceptance Tests (at site) Project Direction Project Control In-plant Support Acceptance Test Group at Site Travel and Field Adjustment Instrumentation Total Estimated Costs Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B00820R00040002003 Z ibit E , 5. Estimated Costs for Five Additional Systems STATINTL Systems Hardware d. Quality Control A. Project Direction B. Project Control C. Engineering D. Reliability 9. Glass a. Material b. Fabrication c. Tooling Material Fabrication ? Purchases ? Metal A. Material b. Fabrication c. Tooling d. Quality Control STATINTL * See Attachment "A" for Capital Equipment Re 'd in addition to this tooling. Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 Approved For Release 2000/08/28 CIA-RDP67B0082OR000400020038-9 Exhibit F 6, Estimated Costs for Instruction Manuals Engineering Purchase Items Sub Contract Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 STATINTL Project Direction Project Control Creative Eng'r& Dev Reliability Systen t tardware Windows Project Direction Project Control Engr'go & Dev. Reliability System Hardware Windows Engineer'g Plant Service Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Qua)' Cr STATINTL Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 SCHEDULE "C" SUHKARY OF ESTIMATE in this sun-wry. STATINTL Prototype Field Support Equipment Spare Parts. Acceptance Test Program Five. Additional Systems Instruction Manuals Prime Costs. General and Administrative Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 Total Estimated Cost Fixed Fee Prototype and Five Additional Systems aad. Fixed Fee Appro\ed For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 ESTIMATED FUNDING REQUIREMENTS November 30 - December 31, 1959 January 1 - March 31, 1960 April 1 - June,.30, 1960 July 1 - September 30, 1960 October 1 - December 31, 1960 January 1 - March 31, 1961 March 31 - June 30, 1961 July 1 .- September 30, 1961 October 1 - December 31, 1961 January 1 - March 31, 1962 April 1 - June 30, 1962 `which should, be funded during this period. Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Page 74 STATINTL Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9 Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 TERMS AND CONDITIONS 2. Expenditures by the Contractor for transportation of the personnel directly engaged in the performance of the work hereunder, plus reasonable actual subsistence expenses. performance of this contract. 1. General research as a component part of the Contractor's G & A expense in accordance with the cost principles de- lineated in Revision 50 to Section 15 of the ASPR. 1. Our proposal is based on the award of a Cost-Plus-Fixed-Fee Contract with the understanding that the cost principles set forth in Revision 50 of the Armed Services Procurement Regulations will apply. In addi- tion, the following terms and conditions apply. A. The following shall be considered allowable items of cost on the 3. Overtime wages, including premium, and shift premium. 4. Progress payments to subcontractors performing work under this contract on a fixed-price basis. 5. Special Costs - The cost of guard services, rental of a station wagon, private telephone lines, receptionist- switchboard operator and a maintenance man in connection with the operation of the secure area of the Contractor's Post Road Plant shall be direct costs under this contract. Rental on the leased Post Road Plant shall be treated as an indirect cost. 6. Extended travel compensation in accordance with Section 805-8 of our Policy and Procedure Manual. Copies of this policy are attached for your information. This is the same policy presently recognized in Part III (11) of Con- tract LW-473, Amendment No. 5. B. The fixed fee shall be paid in monthly installments based on allowable costs incurred by the Contractor and approved by the Contracting Officer computed at the same ratio that the total fixed fee stated herein is to the total estimated cost stated herein, subject, however, to the normal W ithholding pro- vision on the payment of fee. II. Our proposal is further based on the following: A. No-charge usage of facilities under Contract AF 33(600)-28501 and Contract RE-518. III. All prices for hardware are quoted F.O.B. Norwalk, Connecticut. V Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9