CONTRACT PR-8200
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00820R000400020038-9
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
16
Document Creation Date:
November 17, 2016
Document Release Date:
April 18, 2000
Sequence Number:
38
Case Number:
Publication Date:
March 3, 1960
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP67B00820R000400020038-9.pdf | 355.9 KB |
Body:
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
March 3, 1960
Subject: Contract PR-8200
Attached is our definitive proposal for the work contemplated on the
above contract. This proposal is based on the 18" f/3.8 system which is
described in Document No. 119, attached. This proposal is based on the
contract extending through June 1962 so that it will be completed with
final acceptance of the last of the six (6) systems.
Our proposal consists of the following documents:
A. Statement of Work, Attachment I
B. Cost Data, Attachment II (Exhibits "A" through "F")
C. Terms and Conditions, Attachment III
D. Contractor's Document No. 119, Attachment IV
The estimated costs presented in this proposal are based on the
following:
1. This proposal covers only the services, materials, etc., to carry
the program through the time that all units have been accepted. It does
not include any "operational" field service, M & 0, or spare parts. A
budget estimate for these items will be submitted separately in the near
future.
2. A single quartz window glazing has been included. If it proves
necessary to provide a more complex window, we propose that this be con-
sidered a change in scope.
You will note that the Statement of Work under paragraph 1.2 indicates
that we have completed Item 1 and are submitting our recommendation in
Document No. 119, which is Attachment IV. We are proceeding with the final
design of the system under Item 2 of the Statement of Work and would, there-
fore, appreciate your approval of Item 1 as indicated in the Statement of
Work.
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
Page 2
March 3, 1960
In regard to the no-charge usage of facilities requested under para-
graph II.A. of Attachment III, it will be necessary that New York Air
Procurement District be furnished with a letter which states that this
contract (AF 33(600)-37827) was negotiated on the basis of such no-charge
usage.
For your information we have attached a draft of such a letter. When
we receive a copy of this letter, we can then take appropriate administra-
tive action with the Administrative Contracting Officer on Contract AF
33(600)-28501.
Please do not hesitate to contact me if you require any additional
information.
CMH: pma
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
March 2, 1960
Attachment II
COST DATA
The cost data is presented as follows:
1. Individual cost sheets for each major task, Exhibits
"A" through "IF'.
2. Summary of prime costs by cost elements based on
Exhibits "A" through "P", Schedule "A".
3. Cost breakdown by items, Schedule "B".
4. Summary of estimate, Schedule "C".
5. Estimated fiscal funding by quarters, Schedule "D".
6. Capital equipment requirements, Attachment "A".
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
Approved for Release 2000/08/28 : CIA-RDP67B00820R00040002003Bibit A, Page 1
1. Estimated Costs for Prototype
(Reference Document # 84 for Descriptions of Activities
A.
B.
C.
Project Direction (21 months)
Project Control (21 months)
Creative Engineering (Excluding Windows)
1.
Engineering
2.
Purchases
STATINTL
3.
Fabrication
4.
Sub Contract
5.
Travel
6.
Reports and Printing
D. Reliability
Engineering
Fabrication
STATINTL
STATINTL
Sub Contracts
Vibration
V/H Sensor
E. Hardware (Excluding Win&,ws)
1. Glass
a. Material
b. Fabrication
c. Tooling
Approved For Release 2000/08/28 :
Approved For Release 2000/08/28: CIA-RDP67B00820R0004000200a8X--abit A, page 2
2. Metal
a. Material
b. Fabrication
c. Sub Contract
d. Tooling
3. Purchases
4. Quality Control
5. Travel
F. Windows
1. Development
a. Engineering
b. Fabrication
c. Purchases
d. Sub Contract
e. Travel
2. Manufacturing
a. Material
b. Fabrication
c. Quality
Control
d. Tooling
STATINTL
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
See Attachment "A" for Capital Equipment Req'd in a Mon to this tooling
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Exhibit B
2. Estimated Costs for Field Support Equipment
(Reference Document #84 for Description of Equipment)
A. Engineering
B. Glass
C. Purchases
D. Fabrication
E. Sub Contract
F. Quality Control
G. Travel
H. Reports and Printing
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08128 : CIA-RDP67B00820R00040002003?5&ibit C
3. Cost Estimate for Spare Parts
(including,Windows)
A. Engineering
B. Glass
C. Purchases
D. Fabrication
E. Quality Control
F. Travel
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28: CIA-RDP67B00820R0004000200 x-Ribit D
4. Estimated Costs for Acceptance Test Program
Prototype and five additional systems
Duration of Acceptance Tests (at site)
Project Direction
Project Control
In-plant Support
Acceptance Test Group at Site
Travel and Field Adjustment
Instrumentation
Total Estimated Costs
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B00820R00040002003 Z ibit E ,
5. Estimated Costs for Five Additional Systems
STATINTL
Systems Hardware
d. Quality Control
A. Project Direction
B. Project Control
C. Engineering
D. Reliability
9. Glass
a. Material
b. Fabrication
c. Tooling
Material
Fabrication
? Purchases
? Metal
A. Material
b. Fabrication
c. Tooling
d. Quality Control
STATINTL
* See Attachment "A" for Capital Equipment Re 'd in addition to this tooling.
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
Approved For Release 2000/08/28 CIA-RDP67B0082OR000400020038-9
Exhibit F
6, Estimated Costs for Instruction Manuals
Engineering
Purchase Items
Sub Contract
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
STATINTL
Project Direction
Project Control
Creative Eng'r& Dev
Reliability
Systen t tardware
Windows
Project Direction
Project Control
Engr'go & Dev.
Reliability
System Hardware
Windows
Engineer'g
Plant
Service
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Qua)'
Cr
STATINTL
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9 SCHEDULE "C"
SUHKARY OF ESTIMATE
in this sun-wry. STATINTL
Prototype
Field Support Equipment
Spare Parts.
Acceptance Test Program
Five. Additional Systems
Instruction Manuals
Prime Costs.
General and Administrative
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
Total Estimated Cost
Fixed Fee
Prototype and
Five Additional
Systems
aad. Fixed Fee
Appro\ed For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
ESTIMATED FUNDING REQUIREMENTS
November 30 - December 31, 1959
January 1 - March 31, 1960
April 1 - June,.30, 1960
July 1 - September 30,
1960
October
1 - December 31, 1960
January
1 - March 31, 1961
March 31
- June 30, 1961
July 1
.- September 30, 1961
October
1 - December 31, 1961
January
1 - March 31, 1962
April 1 - June 30, 1962
`which should, be funded during this period.
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Page 74
STATINTL
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B0082OR000400020038-9
Approved For Release 2000/08/28 : CIA-RDP67B00820R000400020038-9
TERMS AND CONDITIONS
2. Expenditures by the Contractor for transportation of the
personnel directly engaged in the performance of the work
hereunder, plus reasonable actual subsistence expenses.
performance of this contract.
1. General research as a component part of the Contractor's
G & A expense in accordance with the cost principles de-
lineated in Revision 50 to Section 15 of the ASPR.
1. Our proposal is based on the award of a Cost-Plus-Fixed-Fee Contract
with the understanding that the cost principles set forth in Revision
50 of the Armed Services Procurement Regulations will apply. In addi-
tion, the following terms and conditions apply.
A. The following shall be considered allowable items of cost on the
3. Overtime wages, including premium, and shift premium.
4. Progress payments to subcontractors performing work under
this contract on a fixed-price basis.
5. Special Costs - The cost of guard services, rental of a
station wagon, private telephone lines, receptionist-
switchboard operator and a maintenance man in connection
with the operation of the secure area of the Contractor's
Post Road Plant shall be direct costs under this contract.
Rental on the leased Post Road Plant shall be treated as
an indirect cost.
6. Extended travel compensation in accordance with Section
805-8 of our Policy and Procedure Manual. Copies of this
policy are attached for your information. This is the
same policy presently recognized in Part III (11) of Con-
tract LW-473, Amendment No. 5.
B. The fixed fee shall be paid in monthly installments based on
allowable costs incurred by the Contractor and approved by the
Contracting Officer computed at the same ratio that the total
fixed fee stated herein is to the total estimated cost stated
herein, subject, however, to the normal W ithholding pro-
vision on the payment of fee.
II. Our proposal is further based on the following:
A. No-charge usage of facilities under Contract AF 33(600)-28501
and Contract RE-518.
III. All prices for hardware are quoted F.O.B. Norwalk, Connecticut.