(UNTITLED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00820R000300130033-3
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 12, 2016
Document Release Date:
May 1, 2002
Sequence Number:
33
Case Number:
Publication Date:
September 3, 1963
Content Type:
CABLE
File:
Attachment | Size |
---|---|
CIA-RDP67B00820R000300130033-3.pdf | 47.92 KB |
Body:
CLASSIFIED MES. AGE ROUTING
Approved For Release iCTSN'4 : F( b8
DATE 2018 Z 03 SEP 63
25X1A To
'DIRECTOR
ACTIONS
UFO I 05i9 1 I ti
FROM
TOR: 2117Z 03 SEP 63
S E C R E T
25X1A
0
IDEALIST
25X-1A ATTN:
START DATE OF 9/5/63.
THE FOLLOWING IS AN OUTLINE OF THE TEST PROGRAM, ANTICIPATED
25X1A
25X1A
1. 9/5
UP TEST FACILITY.
2. 9/6
PERSONNEL
PERSONNEL
ROUTINE
ARRIVE TO SET 25X1A
WILL ARRIVE
893
25X1A
TO BRIEF PILOT AND COMMUNITY SPECIFICS OF TESTS AND OPERATIONAL
REQUIREMENTS.
3. 9/9 AND 9/10 INSTRUMENT WILL BE INSTALLED IN AIRCRAFT.
4. 9/11.- START FLIGHT TEST. PLAN IS TO MAKE ONE (1) RUN TO
EVALUATE SET-UP; MAKE ANY CORRECTIONS ON SETTINGS, IF NECESSARY; THEN
RUN THREE (3) FLIGHTS TO CONFIRM RESULTS. NO EXPERIMENTATION IS PLANNED
GRO P 1
bnftded Rons Won*
down 3?sdmq am
dedessificattan
REPRODUCTION BY OTHER THAN. THE ISSUING OFFICE IS PROHIBITED., Copy Na
WITH DIFFERENT FILMS, ETC. IT IS ANTICIPATED THAT FOUR FLIGHT
DAYS WILL BE REQUIRED FOR TESTING.
END OF MESSAGE.
IN 89705
25X1A
Approved For Release 2002/09/04: CIA-RDP67B0082OR000300130033-3