REVISED IRAN SCHEDULE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP67B00820R000300120082-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
November 17, 2016
Document Release Date:
February 29, 2000
Sequence Number:
82
Case Number:
Publication Date:
April 6, 1965
Content Type:
CABLE
File:
Attachment | Size |
---|---|
CIA-RDP67B00820R000300120082-0.pdf | 91.31 KB |
Body:
FORM 1-2111 61%kF
Approve For Release 2000/08~ ;~ #~4r t !D0820 OOa30~#4=20( ~- n
193 OZ 06 APR 65 S E C R E I
DJRECTOR
25X1A
ROUTINE
I
'ORb 222OZ 06 02 G5
25X1A
SUBJ: REVISED IRAN SCHEDULE
DUE TO VARIOUS CHANGES AND REQUIREMENTS IN THE PAST WEEK,,
REQUESTED BY Q)1SHES T0 RECAP DELIVERY SCHEDULES
FOR PROJECT ARTICLESQ
ARTICLE 349 WAS DELIVERED MO NDAY9 5 APRIL FOR FFD-3
MISSIONS.. THIS ARTICLE SHOULD BE RETURNED
25X1A
IN
APPROX 2 WEEKS FOR ENGINE TEST PROGRAMS DETAILS AND SCHEDULE
FOR THIS TEST PROGRAM WILL BE PUBLISHED AT A LATER TIME.
ARTICLE 382 - INSPECTION ON THIS. ARTICLE IS COMPLETE AND
SHOULD BE PREPARED FOR DELIVERY ON 12 APRIL (THIS DATE IS
PREDICATED ON ENGINE AVAILABILITY BY 6. APRIL).
ARTICLE 384 m FLIGHT TESTING OF SYSTEM 13A, SUGAR SCOOP
AND EXTENDED ELEVATOR TAB IS IN PROCESS. IT IS ANTICIPATED THESE
TESTS WILL BE COMPLETE BY 16 APRIL. WWE WILL THEN INCORPORATE
THE LATEST SYSTEM 95/128 MODIFICATIONS, THE ARTICLE WILL BE
PREPARED FOR DELIVERY ON 26 APRIL TO (THIS SCHEDULE 25X1A
~xczur*.or::ais~ro
cc?e.aaerlVG
.4MD -;IIIC'Tc;i'I
Approved fror Re` easeOy~8/3"'.`PA[~Pfi
Approved For Release 2000/08/23 : CIA-RDP67B00820R000300120082-0
25X1A
0209 (IN 80597) S E C R E T
PAGE TWO
IS CONTINGENT ON GOOD FLYING WEATHER FOR THE NEXT 2 WEEKS.)
ARTICLE 372 e WILL BE DELAYED I MEEK TO ALLOW FOP INSTALL-
ATION OF SYSTEM 13A PROVISIONS. THIS WILL INCLUDE.ALL WIRING AND
BRACKETRY BUT NOT CONTROL UNIT, HEAT EXCHANGER OR PRESSURE
BOX. ARTICLE WILL BE DELIVERED ON 19 APRIL TO 25X1A
ARTICLE 359 - WILL BE DFLAYED 2 WEEKS TO ALLOW FOR INSTALL-
ATION OF COMPLETE SYSTEM 13A. THE ARTICLE WILL BE DELIVERED TO
ON 26 APRIL.
REVISION "L" OF THE IRAN SCHEDULE WILL BE PUBLISHED BY 7 APRIL
TO REFLECT THESE CHANGES.
END OF MESSAGE
S E C R E T