DEPLOYMENT TO (Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP63-00313A000600100031-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 14, 2016
Document Release Date: 
November 27, 2002
Sequence Number: 
31
Case Number: 
Publication Date: 
February 6, 1963
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP63-00313A000600100031-1.pdf116.33 KB
Body: 
Approved For Release 2003/01/24: CIA-RDP63DA313A000600100031-1. IDEA 09 79 Copy .z of g MEMORANDUM FOR: Assista nt Director, OSA SUBJECT: Deploy ment to 25X1 C T 1. The sequence of events which will occur in the accomplish- ment of reconnaissance of Indonesia will obviously be dictated by rc uLts of meetings in progress as well as the completion of existing 25X1A equirements. In general terms deployment to forward operating bases in support of target requirements in Indonesia can be accomplished as indicated below: 25X1A from Edwards AFB.. b.. Personnel deploy direct from Edwards AFB and equipment deploy direct fro 25X1A 2. Time permitting the entire detachment should be redeployed frorrE~ to Edwards AFB. This will allow the detachment to accomplish required maintenance on support equipment which is not normally accomplished in the field. In addition, the detachment will be able to replenish spare. parts kits. The sequence of events subsequent to return of the detachment to Edwards AFB would be generally as listed below: a. Preparation phase for Edwards detachment including repairs to equip and replace spares will require approximately two weeks. 25X1 C Dnrincs this period coordination can be accomplished 25X1A Approved For Release 2003/01/24: CIA-RDP63-00313A000600100031-1 Approved For Release 2003/Q ?. 313A000600100031-1 c. A survey team consisting of representatives from Communications, Materiel, Security, and Operations plus representation from Edwards AFB will visit bases in question. 25X1 C Over-all time from first notice to complete communications coordination is three weeks. Preferably this team will be accompanied by d. After completion of necessary coordination and survey trips and upon receipt of approval to conduct photographic reconnaissance of selected targets in Indonesia, the actual deployment will be accomplished generally as follows: (1) Advance echelon from Edwards will depart for This team will include representatives 25X1 C from Operations, Communications, and Security. Secure CW contact will be established with Headquarters. (2) KC-135 will depart with detachment personnel and material for the first point of landing on the ferry route. (3) U-2 aircraft will follow KC-135. E (4) Ferry operations will be conducted by leap- frogging the U-2 and KC-135 to successive intermediate bases. 25X1 C (5) OR status and secure communications should be established roughly five hours after arrival of U-2. 25X1 C 3. In the event that time does not permit redeployment of the 25X1 C detachment fro to. Edwards AFB it is anticipated that the deployment t ill be. accomplished, as'follows: b. Same survey team for bases to be utilized will be required. Approved For Release 2003/01/24':'CIA-RDP63-00313A000600100031-1 Approved For Release 2003/01/24: CIA-RDP630313A000600100031-1 c. An advance echelon from Edwards. AFB will be required. d. The same general plan for ferrying the aircraft from Edwards AFB will apply. e. Coordination will be accomplished so that the arrival of equipment from ill be subsequent 25X1 C to the arrival of detachment personnel from Edwards AFB. f. Estimated time for establishment of communications and operational readiness will be approximately five hours subsequent to the arrival of material F7 -1 25X1 C g. Personnel presently deployed direct to Edwards AFB. will return 25X1 C 4. The above plans are based on the assumption that require- ments for North Viet Nam and Sino-Indian border have been completed or at least satisfied to the extent that day-to-day liability for such coverage will not exist. 25X1A Chief, Operations Division, OSA cc: OSA/C/PS OSA/ C/ COMMO OSA/C/MD OSA/C/SEC OSA/ C /ADMIN Approved For Release 2003/01/24: CIA-RDP63-00313A000600100031-1 Approved For Release 2003/01/24: CIA-RDP63-00313A000600100031-1 25X1A OSA/O Distribution: #1 - Addee #2 - OSA/C/PS (6 Feb 63) #3 - OSA/C/COMMO #4 - OSA/C/MD #5 - OSA/C/SEC #6 - OSA/ C /ADMIN #7 - OSA/C/OD #8 - OSA/OD/C/IDEA #9 - OSA / RB Approved For Release 2003/01/24: CIA-RDP63-00313A000600100031-1