ACTIVITIES REPORT FOR OPERATIONS BRANCH 18 JANUARY THRU 24 JANUARY 1960
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP63-00313A000600040088-6
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
5
Document Creation Date:
December 12, 2016
Document Release Date:
June 19, 2002
Sequence Number:
88
Case Number:
Publication Date:
January 26, 1960
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP63-00313A000600040088-6.pdf | 231.65 KB |
Body:
25X1A
25X1A
25X1A
25X1 D
GGUs0
25X1A
25X1A
:25)(1A
Apprared For Release 200241,P3)P63-0034.3A00 800040088-8
SUBJBC T
4otirig Chi D.DWP
Activities Report for Operations Branch
18 January Thru 24 January 1960
IMLELaliatism
CNA L-0867-60
01.2br 5
26 January 1960
a. Continued Middle East weather alert,. Unfavorable situation
existed during entire period.
b. Due to increased sun angles in at of
6peration1 take-off time changed from I This
ble the mission to depart
0. Resmiquarters pieced on standby alert for
d. Did not receive control time in sufficient time to I
? l. mission.
d. given flight profile for slipperedl
step-climb operation.
mission.
to
25X1A
25X1 D
int; 2 5X1 A
25X1A
1._ i requested to prepare for high prioritql 1 25X1A
104) car
possibility of obtaining early notificatior
f. Factual inferraatiozi relative to staff study c
location of Detachment C is being evaluated at this time.
tions Order 2-60, codeword =ARS DIAL* given to
land USAF. The initial weather outlook for this operation
will be at 11004 2$ January 1960.
h Proposed activity for 24 Ural January
(1) Two Middle ftst missions.
(2)
(3) Completed staff stu17 on
t C Upon.
(4) weather alert briefing for SQUAB% MAL.
1. Pending actions: None
Approved For Release 20077/KneDP63-00313A000600040088-6
25X1A
25X1C
25X1D
sem,
Approvtd Far Release 2CiN/Q77/0111LCIA-RDP63-0034.3A000600040088-6
2
detsiled intelligence report
25X1C
e. Intelligence assigned respon acmitoring all
available sources of information on =cam Air Defense capabilities in
25X1A Mice I Ito provide warning of air increased hasard
to such operations. Intelligence subsequently :mat with representatives
of Fit Division and Staff and worked out details for support required.
d* lavie j;;;;;)
rszdlt to develop a sanitised mosaic of 25X1A
proposed for oper
e. Pending actions: None
21111ZdatalliliStiiikilligatk24212
a4 Completed and antadttal the ovvrall P2T7 projected retrofit
to to accomplished.
25X1A
25X1A
25X1D
b. Completed
'time table for MAN
to Finance the budget estimate* for the
?
Approved For Release 200i Opt METIP63-00313A000600040088-6
25X1A
25X1A
AppwavedfuprRelease2002/0713419#-,REV-00.7.13A000600040088-6
Wil
- 3 -
departed 22 January 1960 to participate in
e above.
j.Beoeived Development Branch .stitss on modifications
for C.1309. These incorporated into sty to DD/P on 15
1960, Subject: FS Requirements and Nethods to ACcomplish
Oeve instructions to proceed with oxygen lines
quiek-dieconnect providing it was no leak source than preeent coupling
and also that it did not deolNy deli of operation dual regulator
:met pack,
25X1A
Pending
(1) Sobject:
Dote:
Actions*:
Hiner Beacons
15 Dec 59
WD/Development Branch
(2)
Subject:
Datet
6 Jen 60
Action's DM/Bateriel and Office Logistic*
(3)
Subject: Xr.15 Suit Helmet
Bate: 15 10, 59
Aetionee DM/OM/Operations Requirements Section
(4)
Subject: Plane for 045 Camera Mount Wanufacture
Dote: Jen 60
Actions* DM/Development Branch
25X1A
(5)
Subject:
Date: 27 Oct 59
Actions" DM/Development Branch
Subject:
25X1D
Installation of
Das:
4 Jar 60
Actions,: ?SS
(7)
Subject: Disposition of ASN-rs
Bates 15 Jan 60
Action's: DPD/bPS/Sequirements Section
25X1C
ismakititatitefign
b Pending actions: None
Approved For Release 2002/07/11):,CiA.:RW63-00313A000600040088-6
25X1A
25X1A
25X1A
25X1C
25X1C
25X1A
25X1A
25X1A
25X1 D
25X1C
25X1C
25X1A
25X1A
ApprovedZorRelease2002/W4A1k9,14ARP63-001343A000600040088-6
T'Stn'7-g
? 4 ?
LialinSECLAtatan
a? Attargiel r, meeting with ON aids 4
dicuea.d project Prepared memo for the DD/P giving
h4 Reviewed prseent Agency aircraft arrival and departure
arrangements at Andrews Air Force Base with cleared base personnel. It
was agreed ty all concerned that current arrengements are satisfactory.
Wee.
three dye
aspects of
spent a profitable
Riadausrters and was briefed on all support and operational
Neat China operations.
44 GemaraIrekine Cannel Lansdale and Lt COI. Prouty were
briefed on requirements fe-7-------Nest China operations' Mitts
capability and extent of c1 earance to support this greatly increased
oerfligbt activity was discussed. The use of C450Ble was recommended
as a means of improving the capability and reducing overall support.
Reerulted two new PDOss to augment February operations and
replace one PDO sick with infections hepatitis. Renewed contract for one
PO ittornati from Fall 1959 ?Aerations*
Pt embilled that weed be canceled if long range25X1A
'not feaelble- even though a capability new
through May 1960.
^apport bi7E1
eclat* for
Recruiting Letter
29 Oct 59
DAD/Admin/Personnel
Subjectt Request for
Deteri 9 toy 59
Aartionee
Replacement
Approved For Release 2002/07/31 : CIA-RDP63-0031 J 040
ILLEGIB
Approved For Release 2002/07/31 : CIA-RDP63-00313A000600040088-6
Approved For Release 2002/07/31 : CIA-RDP63-00313A000600040088-6