ACTIVITIES REPORT FOR OPERATIONS BRANCH 18 JANUARY THRU 24 JANUARY 1960

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP63-00313A000600040088-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 12, 2016
Document Release Date: 
June 19, 2002
Sequence Number: 
88
Case Number: 
Publication Date: 
January 26, 1960
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP63-00313A000600040088-6.pdf231.65 KB
Body: 
25X1A 25X1A 25X1A 25X1 D GGUs0 25X1A 25X1A :25)(1A Apprared For Release 200241,P3)P63-0034.3A00 800040088-8 SUBJBC T 4otirig Chi D.DWP Activities Report for Operations Branch 18 January Thru 24 January 1960 IMLELaliatism CNA L-0867-60 01.2br 5 26 January 1960 a. Continued Middle East weather alert,. Unfavorable situation existed during entire period. b. Due to increased sun angles in at of 6peration1 take-off time changed from I This ble the mission to depart 0. Resmiquarters pieced on standby alert for d. Did not receive control time in sufficient time to I ? l. mission. d. given flight profile for slipperedl step-climb operation. mission. to 25X1A 25X1 D int; 2 5X1 A 25X1A 1._ i requested to prepare for high prioritql 1 25X1A 104) car possibility of obtaining early notificatior f. Factual inferraatiozi relative to staff study c location of Detachment C is being evaluated at this time. tions Order 2-60, codeword =ARS DIAL* given to land USAF. The initial weather outlook for this operation will be at 11004 2$ January 1960. h Proposed activity for 24 Ural January (1) Two Middle ftst missions. (2) (3) Completed staff stu17 on t C Upon. (4) weather alert briefing for SQUAB% MAL. 1. Pending actions: None Approved For Release 20077/KneDP63-00313A000600040088-6 25X1A 25X1C 25X1D sem, Approvtd Far Release 2CiN/Q77/0111LCIA-RDP63-0034.3A000600040088-6 2 detsiled intelligence report 25X1C e. Intelligence assigned respon acmitoring all available sources of information on =cam Air Defense capabilities in 25X1A Mice I Ito provide warning of air increased hasard to such operations. Intelligence subsequently :mat with representatives of Fit Division and Staff and worked out details for support required. d* lavie j;;;;;) rszdlt to develop a sanitised mosaic of 25X1A proposed for oper e. Pending actions: None 21111ZdatalliliStiiikilligatk24212 a4 Completed and antadttal the ovvrall P2T7 projected retrofit to to accomplished. 25X1A 25X1A 25X1D b. Completed 'time table for MAN to Finance the budget estimate* for the ? Approved For Release 200i Opt METIP63-00313A000600040088-6 25X1A 25X1A AppwavedfuprRelease2002/0713419#-,REV-00.7.13A000600040088-6 Wil - 3 - departed 22 January 1960 to participate in e above. j.Beoeived Development Branch .stitss on modifications for C.1309. These incorporated into sty to DD/P on 15 1960, Subject: FS Requirements and Nethods to ACcomplish Oeve instructions to proceed with oxygen lines quiek-dieconnect providing it was no leak source than preeent coupling and also that it did not deolNy deli of operation dual regulator :met pack, 25X1A Pending (1) Sobject: Dote: Actions*: Hiner Beacons 15 Dec 59 WD/Development Branch (2) Subject: Datet 6 Jen 60 Action's DM/Bateriel and Office Logistic* (3) Subject: Xr.15 Suit Helmet Bate: 15 10, 59 Aetionee DM/OM/Operations Requirements Section (4) Subject: Plane for 045 Camera Mount Wanufacture Dote: Jen 60 Actions* DM/Development Branch 25X1A (5) Subject: Date: 27 Oct 59 Actions" DM/Development Branch Subject: 25X1D Installation of Das: 4 Jar 60 Actions,: ?SS (7) Subject: Disposition of ASN-rs Bates 15 Jan 60 Action's: DPD/bPS/Sequirements Section 25X1C ismakititatitefign b Pending actions: None Approved For Release 2002/07/11):,CiA.:RW63-00313A000600040088-6 25X1A 25X1A 25X1A 25X1C 25X1C 25X1A 25X1A 25X1A 25X1 D 25X1C 25X1C 25X1A 25X1A ApprovedZorRelease2002/W4A1k9,14ARP63-001343A000600040088-6 T'Stn'7-g ? 4 ? LialinSECLAtatan a? Attargiel r, meeting with ON aids 4 dicuea.d project Prepared memo for the DD/P giving h4 Reviewed prseent Agency aircraft arrival and departure arrangements at Andrews Air Force Base with cleared base personnel. It was agreed ty all concerned that current arrengements are satisfactory. Wee. three dye aspects of spent a profitable Riadausrters and was briefed on all support and operational Neat China operations. 44 GemaraIrekine Cannel Lansdale and Lt COI. Prouty were briefed on requirements fe-7-------Nest China operations' Mitts capability and extent of c1 earance to support this greatly increased oerfligbt activity was discussed. The use of C450Ble was recommended as a means of improving the capability and reducing overall support. Reerulted two new PDOss to augment February operations and replace one PDO sick with infections hepatitis. Renewed contract for one PO ittornati from Fall 1959 ?Aerations* Pt embilled that weed be canceled if long range25X1A 'not feaelble- even though a capability new through May 1960. ^apport bi7E1 eclat* for Recruiting Letter 29 Oct 59 DAD/Admin/Personnel Subjectt Request for Deteri 9 toy 59 Aartionee Replacement Approved For Release 2002/07/31 : CIA-RDP63-0031 J 040 ILLEGIB Approved For Release 2002/07/31 : CIA-RDP63-00313A000600040088-6 Approved For Release 2002/07/31 : CIA-RDP63-00313A000600040088-6