USSR TO BUILD STEEL PLANT IN INDONESIA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP62S00545A000100100012-2
Release Decision: 
RIFPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 12, 2016
Document Release Date: 
September 16, 1998
Sequence Number: 
12
Case Number: 
Publication Date: 
June 15, 1960
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP62S00545A000100100012-2.pdf97.51 KB
Body: 
Approved For Release 2001/08/30 : CIA-RDP62S00545A000100100012-2 I0.2711 15 June 1960 5. US to Build Steel Plant in Indonesia On 7-June the USM and Indonesia signed a contract for the con- struction of a steel plant in West Java with a production capacity of 100,000 tons of steel a year. The installation will cost an estimated $60 million dollars of which $35 million will be allocated from the $100 million Soviet credit of 1956 for equipment and construction materials. The remaining $25 million represents local financing and gust be generated internally. (PBIS, n f1U, 8 Jun 60, OUO) The new mill will represent the first step in realizing Indonesia's grandiose plans for developing a heavy industrial base. Internal economic disorder has compounded the problem of locating satisfactory raw arterials at sites accessible. for ,larger merchant vessels capable of servicing. the. archipelago. In 1958 Indonesia hoped to build a. smelter in Borneo and a rolling mill in East Java, as its initial step toward an intergrated iron-steel-coke-fertilizer cogplex. (State, D jaIa rta, Dsp 219, 7 Oct 58, (PTO) Although the $100 million Soviet credit had been avilable since September, 1956, serious exploration began only toward the end of 1959 and then only in East Java. (State, Djakarta, Dsp 539, 22 Dec 59, uyJ.,* FBIS, FE #9, 14 Jan 60, duo) A second Soviet-assisted plant was also projected for West Java. By the time of the xhrushchev trip in February-March 1960, however, the surveys in East Java were apparently discontinued in favor of focusing the initial effort in West Java where a suitable harbor exists. Approved For Release 2001/08/30 : CIA-RDP62S00545A000100100012-2 Approved For Release 2001/08/30 : CIA-RDP62S00545A000100100012-2 With further assistance now expected under the $250 million Soviet credit Indoneeia'a iron and steel industry is currently envisaged as berg spread throughout the archipelaso. Coal from the Celebes will be used to fire blast furnaces in Borneo and. Sumatra which will process iron ore located on these latter islands. The ingots will than be shipped to the rolling mill in West.Java. Until the blast furnaces in Borneo and Sumatra are constructed the West Java plant is expected to operate on local iron ore, in large part derived from serap at present un- recovered and rusting in the jungle. (State, Djakarta, Dsp 838, 18 Mar 60, Confid.). The West Java steel mill project epitomizes the illusory pretensioneandl lack of econoetc reality characteristic of Indonesia's planners,, abetted by the Soviet fetish for heavy industrialization under practically all circumstances. Furthermore, as Indonesia lacks the necessary skilled technicians,, rupiah reserves, marine transport and internal stability to complete even the West Java mill in the torasse~' able future, the larger integrated couplex will remain a distant dream for same. time to came. A"?`'prav~e~f For, Release 2001/08/30 : CIA-RDP62S00545A000100100012-2 p