OPERATIONAL ASPECTS OF (CLASSIFIED)- AQUATONE MERGER

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP62B00844R000200220004-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
2
Document Creation Date: 
December 20, 2016
Document Release Date: 
April 15, 1999
Sequence Number: 
4
Case Number: 
Publication Date: 
September 29, 1998
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP62B00844R000200220004-4.pdf166.99 KB
Body: 
Approved For Release 2007/07/25: CIA-RDP62B00844R000200220004-4 y at 6 25X1 25X1 17 April Project erector 3nai Aspects aspects of merging = with AQUATQPF. A brief Burg meeting with recommendations and observations} folio . ! was held 9 April to di, usa this 2. The discussion with was dealonnd n"- i +r merger w-erei,n; a" 0 #'.c100 responsibilities are assumed by AQUA )M. ,end vice versa and to determine the effects amalgamation 'will have on organizationa3, structure. I feel it recesses at this t to point out the wide range in concept to the extent of an _ 25X1 = UATON merger. Opinions range from a minor consolidation of the physical facilities of the RD-69 program with certain AQ `ATONE 25X1 field un ts to an c ai3. - 3. Our discussion brought forth the followin as a, With the exception o physical assets. b. L however t >7 AQUAT 9 program bas approximately U persons assigned to head is little or no field organization. ilon is H is poorly defined an d and responsibilities are nebulous. d. By no means are the air activities of the Agency 25X1 centered in or around the i.e., (1) project under sponsoxed by MI and introly the use of high perfraxn ee 4 t7 aircraft and trimetrogon photog hy, I Approved For Release 2007/07/25: CIA-RDP62B00844R000200220004-4 Approved For Release 2007/07/25: CIA-RDP62B00844R000200220004-4 for o'verf'3ights presently done in the such as undor ouable that responsibilities for such air of n should enjoys neither the priority or the autonc presently available to AQUATONE. extent in i) 9 overflight program 25X1 (2) Ulloon projects (leaflet and agent 25X1 (3) Its at .. It is my opinion that regardless of the extent of a merger the present AQUATON o ierational structure could assume all 0 25X1 functions with the addition of only few personnel. It is visualized that the ultimate structure of AQ'JATON will present an operational staff of considerably fewer persons; thus alto g the addition of 25X1 any specialist (required to a port =requirements) within our present strength. I can foresee no advantages acccru n to AQUATONE a result of a merger? particularly ale we remain autonomous and outside a devision such as Of/P. The advantages to ight be quite 25X1 A4 different t o h"am' r 5. I have but one reendationt that we restate our problem with the goals and extent of merger more clearly defined in order that the advantages and disadvantages may be more cif .y weighed. .fir ector of - i" Approved For Release 2007/07/25: CIA-RDP62B00844R000200220004-4