PROJECT AIRCRAFT ASSIGNMENT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP62B00844R000200070053-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
December 14, 2016
Document Release Date:
October 16, 2002
Sequence Number:
53
Case Number:
Publication Date:
October 24, 1957
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP62B00844R000200070053-8.pdf | 135.05 KB |
Body:
Approved Fob lease 2002/10/29 : CIA-RDP62B00844R 000200070053-8
SECRET
SAPC - 20543
Copy_L_of 4
24 October 1957
MEMORANDUM FOR: Project Director
SUBJECT : Project Aircraft Assignment
1. This memorandum outlines the overall Project aircraft situation
and contains Operations recommendations for their assignment and utiliza-
tion. The following figures are based on the assumption that all ten
Project retained U-2 aircraft will be equipped with slipper tanks instal-
led either at Edwards AFB or at the detachment. (This subject will be
discussed in a later memorandum). It is further assumed that RAINBOW
will be installed on a minimum of six of the retained U-21s.
A. Present Aircraft Assignment:
Detachment "A"
Detachment "B" De
tachment "C"
1 CIA - owned C-54
1 AF
- owned C-54 1
AF - owned C-47
2 AF - owned T-33
2 AF
- owned T-33 2
AF - owned T-33
1 AF - owned L-20
5 CIA
- owned U-2 2
CIA - owned U-2
3 CIA - owned U-2
344
- RAINBOW
342 - Clean
347 - Clean
349
-,RAINBOW with
358 - Clean
351 - Clean with
--
slipper tanks
slipper tanks
352
- Clean
359 - Clean
353
- Clean
-356
- Clean System
Edwards AFB
2 AF - owned T-33
7 CIA - owned U-2
343 - Clean
3.48 - Clean to FOG
(350 - Clean to FOG
355 - RAINBOW with
slipper tanks
360 - Clean
367 - RAINBOW
378 - RAINBOW
5 Hatch
To Be Ferried to Edwards AFB
U-2 - 347
349-
052)
356-
359
Prior 1 November 1937
B. Recommended Winter Aircraft Assignment (to 1 April 1958)
Detachment "B"
2 C-54
Detachment "C"
1 C-47
Edwards AFB
2 T-33
ILLEGIB
Approved For Release 28I : CIA-RDP62B00844R000200070053-8
Approved For Rol,ease 2002/10
eRET CIA-RDP62B00844RO 000200070053-8
- 2 -
Winter Aircraft Assignment: (Cont'd)
Detachment "B"
Detachment "C"
Edwards AFB
2 T-33
2 T-33
U
5 U-2
-2
3
2 U-2
44
343 - Clean (B a
d C
3
- RAINBOW
351
342 - Clean
n
camera tests)
- Clean with
slipper tanks
358 - Clean
349 - RAINBOW and slipper
353 - Clean
tanks (used as
needed)
355 - RAINBOW and slipper
tanks (used as
needed)
367 - RAINBOW test and
fit with slipper
tanks
378 - RAINBOW test and
fit with slipper
tanks
Aircraft to be Transferred to FOG:
U-2 No. 348 - Clean - Approval granted
347 - Clean - To be approved
350 - Clean - Approval granted L-
(352 - Clean - To be approved)
X56 - Clean - To be approve.
(359 - Clean - To be approved
``
;`
360 - Clean - To be approve
If it is determined that the slipper tank installation can only be per-
formed at Edwards AFB I would expect that sometime during the winter months
that U-2 Nos. 342, 358 (Det. C) and 353, 341. (Det. B) will be returned to
Edwards AFB to be either RAINBOWED, fitted with slipper tanks or both. These
aircraft would be exchanged with those at Edwards AFB that have completed
retrofit.
Aircraft to be Transferred to USAFE:
2 T-33
1 L-20
C. Recommended Spring and Summer Aircraft Assignment:
Detachment "B"
2 C-51j.
2 T-33
4 U-2
344 - RAINBOW and
slipper tanks
(must be fitted)
Detachment I
1 C-47
2 T-33
4 U-2
342 - slipper tanks only
(must be fitted)
Edwards AFB
2 T-33
2 U-2
343 - slipper tanks
only (must be
fitted)
Approved For Release 29 : CIA-RDP62B00844R000200070053-8
Approved For ,lease 2002 E EIIA-RDP62B00844R OO200070053-8
-3 -
Recommended Spring and Summer Aircraft Assignment: (Cont'd)
Detachment "B"
U-2 - 349 - RAINBOW and
slipper tanks
Detachment "C"
U-2 - 355 - RAINBOW and
351 - Clean and slipper
tanks
353 - slipper tanks only
(must be fitted)
slipper tanks
367 - RAINBOW and
slipper tanks
(must be fitted)
Edwards AFB
U-2 - 358 - slipper
tanks only
(must be
fitted)
378 - RAINBOW and slipper
tanks (must be fitted)
2. During the winter retrofit program I would expect that it is entirely
possible that the actual assignment by number, of U-2 aircraft to a, specific
detachment may not be rigidly adhered to, however, the principal of three
RAINBOW and slipper tank U-2's and one slipper tank U-2 to each detachment
is desirable. This combination lends a great amount of flexibility to the
operational capability of the unit and will fulfil all operational require-
ments in the foreseeable future.
25X1A
APPROVED:
RICHARD M. BISSELL, JR.
PS/O/DCI/RHC :pb
Distribution:
A - Addressee
2 - Admin chrono
3 - Ops chrono
4 - Ops subject
Acting Director of Operations
SECRET