OPERATIONAL CONCEPT FOR JOINT CHALICE(Classified) PROGRAM
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP33-02415A000300080038-8
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
3
Document Creation Date:
November 17, 2016
Document Release Date:
November 23, 1998
Sequence Number:
38
Case Number:
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP33-02415A000300080038-8.pdf | 264.06 KB |
Body:
Approved For Release 2000/08/25 : CIA-RDP33-02415A000300080038-8
Plan A
25X1A2g C C P 01142.ILL/ ROGRAM
A. A
25X1C8a
. That the
25X1A2g
c ?nt
25X1A2g Z. bat the
25X1A2g 3. Th*
Unit will be integrated within
Unit wilt be imp reed by U.S
ai.sionawill be ?sraUonaUy controlled iron,
CHALICE Headqu.ters in the same manner as normal CHALICE irhissions.
TARGET SE TION:
25X1X7 1. Following discussions b*tw* - ..n4 U.S. eI1Ljeics Require
id targets an ares, together with an indication o lady* prioriti si.
25X1C8a ts Officers, the will sbtain authorit e coverage
ansm.it such authority and priority indications in approprinte form
ICE Headquarters as guidance firs mission planning.
25X1A2g
TRIM:
1. leather for nigh binning for missions 11 be furniehed
r Central at Offutt tir Force Base, Omaha. Nebraska using
now established to support CHALICE operations. The
ion planning will he sent to the unit 12 hours prior to take-off.
nfornuation for flight briefing will be sent to the unit
1r fr and one.half hours prior to take-off. Weather infornia-
be furnished only to those echelons which are directly concerned
he planning.
ING:
25X1A2g Dpsi*tioaI LssiDns will be planned in the Control Center
at CliALICX Hea quarters. Direction and control of these missions will ?
25X1A2g effected and maintained through the normal message system
ready established.
Approved For Release 2000707: tilitt33-02415A000300080038-8
25X1A2g
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1C8a
25X1A2g
25X1X7
25X1C8a
25X1A2g
25X1A2g
25X1C8a
Approved For Release 2000/08/2 ,5 ? CIA7RDP33-02415A000300080038-8
.-???????!????????????:
2. All
1.1.11.11 Watson *fit
being dispatched. He wIll
keep them advised of planni
3. The
uisi
operatio
be Aisrr mes
r geograp
The
will be planned and/or approved by the
igaed to Headquarters CHALICE prior to
o maintain liaison 'with the and
g and status of proposed operations,
? will obtain political approval for specific
or coverage well in advance of contemplated
will be made an informational addressee on
to the unit 24 hours prior to take-off and
message erwill be dispatched to the only describing in
operation. Approximately two hours later
another esigaating the gene
as much detail as weather information at the time permit*, the flight path
and the targets to be covered. On the basis of this message the
may direct modifications of the flight plan. Although the schedule will not
permit changes of the flight plan at a later point in the cycle, the
may at any time exercise its prerogative a disapproving the
because of political considerations or late developments which might
he prejudicial to the proposed overalls*. Notification% of approval or di.-
approval should be dispatched at least five hours prior to take-off. The
11 also be an informational addressee of the detailed Mission
Finn 12 hours prior to take-off). the **Go-No-Go-I message
(three hours prior to take-off), and will also be advised by CHALICE Head-
quarters when a lending report on the aircraft has been received. Emergency
procedure, relating to last minute cancellation or recall of airborne missions
will be in accordance with existing CHALICE arrangements.
k.
4. Although the Ad Hoc Requirements Committee,in conjunction with
counterpart, has reapcmiibility for establishing target priority,
ocedence for ceverage of Individual targets will be determined by the
lions Sten', including the based on
atonal considerations.
NI
1. Asia
Co
use of
inal w
ty of C
tied there
0
of CHALICE Detachment Corremenders the
vs authority to cancel or delay sions
o
a-availability or malfunction, or because of Inadequate
decisions =immersing route weather will be the re pen-
CE Headquarters and the
Approved For Release 2000/08/25 : CI A -RDP33-02415A000300080038-8
25X1A2g
25X1A5a1
25X1A6a
25X1A6a
25X1A6a
25X1X7
Approved For Release 2000/08/2_5.: CIA-RDP33-02415A000300080038-8
TAKE:
I. Exposed primary
be sent to
essing?
The
weather and
a ffln frorrl
for
*r film will be proceised at the D.tactun.nt. Route
k wit be determined and reported to Headquarters
CHALICE in accar with established procedures. Ti. tracker film will
titers be duplicated and one copy sent to and on* copy to Washington.
Coistribution of primary configuration pb.etography will be in accordance with
current agreements.
Ir.:LINT tapes will be ebAplicated at the Unit *ni the Griginal sent t*
in ton for read-out. One copy 1,111 be sent to and an additional
" copy will be retained by the Unit ending safe rrival of the
'0%! a and copies.
4. ort f Ml n%s.Lon take,
tbc Detachment. the U.S. and the will b under CHALICE security
cognisance.
c or electronic. between
TOP 31-ClET
Approved For Release 2000/08/25 : CIA-RDP33-02415A000300080038-8