HEADQUARTERS CONFIGURATION MANAGEMENT REQUEST FOR CHANGE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP12-00036R000100240005-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
58
Document Creation Date:
December 23, 2016
Document Release Date:
July 30, 2013
Sequence Number:
5
Case Number:
Publication Date:
March 20, 1986
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP12-00036R000100240005-0.pdf | 1.98 MB |
Body:
Declassified in Part- Sanitized Copy Approved forRelease2013/07/30 : CIA-RDP12-00036R000100240005-0
UK t
classification
HEADQUARTERS CONFIGURATION
REFERENCE DATA:
RFC NO R0011-05
MANAGEMENT
DR NO. NOCNO
DATE LOGGED
REQUEST FOR CHANGE
OTHER
REV DATA
-nue, Printing & Photography Division Building Facility Baseline Priority: E U R (circle one)
Docum=nt
Prepared By:
Date: 20 Mar 86 office: OL/IND/CMS Phone:
2!
Date Approval Rqrd By: Change Type:
X
25.
PERM 7 TEMP I
Office Chief Sig:
--/,/CV--.
(removal date) 25;
Date: (Jr ' , c. r--
Need for Change:
When the Headquarters Management Board (HMB) approved the Headquarters CM Plan, it
also approved a list of documents that after approval were to be controlled by the
Facilities Management Board (FMB). One of those documents is the Printing and Photography
Building Facility Baseline Document. The document has been prepared and this RFC
proposes its inclusion in Table 2 of the FMB Configuration Control Baseline as originally
approved by the HMB. This document will provide a documented description of the
important physical characteristics of the P&PD Building on 1 June 1986 and will be used
for configuration management of the P&PD Building.
Description of Change:
Approval of this RFC will place Document H50002, Printing and Photography Buikding
Facility Baseline Document under the control. of the FMB. Further, it updates Table 2
to reflect documentation planned for FMB control as some of the originally planned
documentation has been consolidated in the Facility Baseline Document.
Consequences if Not Implemented:
Direction from the Headquarters Management Board will not be followed.
Document Numbers of
Titles:
Specifications/Drawings Affected:
H50002
Printing & Photography Building Facility Baseline Document
H90001
Headquarters Configuration Management Plan
H/W - Fac Affected?
Tasks Start/End Dates Actionee Staff Costs $ Cost
Update and publish change to the Hdqtrs CM Plan
__Apprgy41._
Al,pl + 30 days
OL/FMD/CMS
Routrle
Maintenance
Publish and Distribute H50002 .
W4Spf.181dajs
OL/FMD/CMS
Routine.
Maintenance
?
4-8.5
SECRET
classification
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
R0011-05
H90001
TABLE 2
FMB CONFIGURATION CONTROL BASELINE
Title Doc. No. Custodian
REQUIREMENTS (TBD) CMS
BASELINE DOCUMENTS
Original Headquarters Building Facility H50001 CMS
Headquarters Site Powerhouse Facility (TBD) CMS
Printing and Photography Building Facility 1450002-0(4064 CMS
New Headquarters Building Facility (TBD) CMS
External Buildings Facilities (TBD) CMS
TECHNICAL EQUIPMENT (TBD) CMS
TEST DOCUMENTS (TBD) CMS
INTERFACE DOCUMENTS (TBD) CMS
FACILITY MODIFICATION PLANS (TBD) CMS
15
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
H50002
PRINTING & PHOTOGRAPHY DIVISION BUILDING
FACILITY BASELINE DOCUMENT
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
*tt:FIET
H50002
DOCUMENT NO: H50002
TITLE:
PRINTING AND PHOTOGRAPHY DIVISION BUILDING FACILITY BASELINE DOCUMENT
REV
' DATE
REVBY
PAGESAFFECTED*
REMARKS
FMB
INITIAL ISSUE
_
per RFC R0011-05
? Deleted page(s) (d): added page(s) (a): no marking for superseded page(s).
11
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
C'.11=1-
H50002
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Purpose
1.2 Scope and Organization
1.3 Configuration Management Responsibilities
2.0 APPLICABLE DOCUMENTS
2.1 Scope
2.2 Headquarters CM Documents
2.3 Federal Standards
2.4 General Codes and Standards
3.0 PRINTING AND PHOTOGRAPHY BUILDING DESCRIPTION
3.1 Scope
3.2 Location
3.3 General Construction
3.3.1 Size, Form, and Organization
3.3.2 Construction Characteristics
3.3.3 Ceiling Height
3.3.4 Ceiling Materials
3.3.5 Walls
3.3.6 Doors
3.3.7 Floors
3.4 Vault-Type Room Construction
3.4.1 Requirements
3.4.2 Walls
3.4.3 Doors
3.4.4 Other Openings
3.4.5 Alarms
3.5 Stairs and Corridors
3.6 Elevators
3.7 Loading Docks
3-1
3-1
3-1
3-1
3-1
3-1
3-5
3-5
3-5
3-5
3-6
3-6
3-6
3-6
3-6
3-11
3-11
3-11
3-11
iii
SECRET
npriacsified in Part -Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0 ?
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
H50002
PAGE
4.0 MECHANICAL SYSTEMS
4.1 Scope 4-1
4.2 Heating, Ventilating, and Air Conditioning 4-1
4.3 Chilled Water 4-1
4.4 Steam 4-1
4.5 Plumbing Systems 4-2
4.5.1 Domestic Water System 4-2
4.5.2 Storm Drainage System 4-2
4.5.3 Sanitary Drainage System 4-2
4.6 Chemical Waste Handling System 4-2
4.6.1 Silver Recovery 4-2
4.6.2 Chemical Solids Removal 4-2
4.6.3 Noxious Fumes Removal 4-3
4.7 Pneumatic System 4-3
4.7.1 Compressed Air and Vacuum System 4-3
4.7.2 Negative Pressure System 4-3
5.0 FIRE PROTECTION SYSTEM
5.1 Scope
5.2 Fire Detection
5.4 Fire Extinction
6.0 ELECTRICAL SYSTEMS
6.1 Scope
6.2 Normal Service
6.3 Emergency Service
6.4 Motorised Equipment Service
6,5 Utility Grounding System
6.6 Lightning Ground System
6.7 Lighting
6-1
6-1
6-1
6-2
6-2
6-2
6-2
iv
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
7.0 DATA NETWORKS
7.1 Scope
7.2 Data Grid
7.3 Data Grid Description and Configuration
7.4 Communication Room
8.0 PHYSICAL SECURITY SYSTEMS
8,1 Scope
8.2 Physical Protection
8.3 Alarms
8.3.1 Intrusion Alarms
8.342 Volumetric Alarms
8.3.3 Secure Access Control System (SACS)
8.3.4 Alarm Consoles
9.0 OPERATIONALLY CRITICAL AREAS AND SYSTEMS
9.1 Scope
H50002
PAGE
7-1
7-1
7-1
7-1
8-1
8-1
8-1
8-1
8-1
8-1
8-1
9-1
9.2 Photographic Operations 9-1
9.2.1 Tank Farm 9-1
9.2.2 Film and Paper Processing Facilities 9-1
9.;2.3 Film and Paper Printing Facilities 9-1
9.2.4 Photo Copy and Inspection Facility 9-1
9.3 Printing Operations
9.3.1 Electronic Prepress
9.3.2 Camera/ Layout/ Plate Areas
9.3.3 Press and Bindery Areas
9.4 Storage Facilities
SECRET
9-10
9-10
9-10
9-10
9-17
neclassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
H50002
LIST OF FIGURES
NUMBER
TITLE
PAGE
3.2-1
Headquarters Site Overview
3-2
3.3-1
Ground Floor P&PD Building Floor Plan
3-3
3.3-2
First Floor P&PD Building Floor Plan
3-4
3.4-1
CMU Vault Wall Crossection
3-7
3.4-2
'Gypsum Board and Metal Vault Wall Crossection
3-8
3.4-3
Two Hour Fire Rated Wall Crossection
3-9
3.4-4
Standard Interior Wall Crossection
3-10
4.0-1
Mechanical Equipment Room G5 Layout
4-4
6.1-1
Switchgear Room G4 Layout
6-3
6.1-2
MotOrs Control Centers in Room G5
6-4
6.1-3
Power Riser Diagram
6-5
7.3-1
Data Grid Schematic
7-2
7.4-1
Room G16 Floor Plan
7-3
9.2-1
Ground Floor Architectural Layout
9-2
9.2-2
Photographics Operations Equipment Footprint
9-3
9.2.1-1
Tank Farm Architectural Layout
9-4
9.3-1
First Floor Architectural Layout
9-11
9.3-2
Printing Operations Equipment Footprint
9-12
9.3.3-1
Press & Bindery Equipment Footprint (Room 113)
9-17
vi
SECRET
nprdaccifien in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
NUMBER
7.4-1
9.2.1-1
9.2.2-1
9.2.2-2
9.2.3-1
9.2.3-2
9:3.1-1
9.3.2-1
9.3.3-1
LIST OF TABLES
TITLE
Room G16 Equipment List and Requirements
Tank Farm Equipment List and Requirements
Film & Paper Processing Equipment List and
Requirements
Film & Paper Processing Equipment List and
Requirements
H50002
PAGE
7-4
9-5
9-6
9-7
Video Replication Equipment List and Requirements 9-8
Film & Paper Printing Equipment List
Requirements
and
Electronic Composition Equipment List and
Requirements (Room 128 & 129)
9-9
9-13
Camera/Layout/Plate Equipment List and Requirements 9-14
Press & Bindery Equipment List and Requirements 9-15
vii
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
att;IlitT
H50002
ABBREVIATIONS & ACRONYMS GLOSSARY
ACRONYM/
ABBREVIATION DESCRIPTION.
a.c.
AEU
Amp
BTU
c.i.p
CM
CMS
CMU
COMMO
COMSEC
CPS
CR
d.c.
DSH
FBIS
FMB
FMD
gpm
HS
NTS
HVAC
Hz
ID
IDF
KV
KVA
KW
lbs.
MCC
MDF
MDP
MHS
NEC
NHB
NSF
No
O.C.
OHB
OL
PB
PBS
P&PD
PSF
RFC
Alternating current
Air Handling Unit
Amperes
British Thermal Units
Cast In Place
Configuration Management
Configuration Management Staff
Concrete Masonry Unit
Communication(s)
(5100 Title)
Cycles Per Second
Condensate return
Direct current
Department of Safety and Health
Farhenheit
Foreign Broadcast Information Service
Facilities Management Board
Facilities Management Division
gallons per minute
Headquarters Site
Headquarters Telephone System
Heating, Ventilating, and Air Conditioning
Hertz,
Identification
Intermediate Distribution Frame
Kilovolt
Kilovolt Amperes
Kilowatt
Pounds
Motor Control Center(s)
Main Distribution Frame
Main Distribution Panel
Message Handling System
National Electric Code
New Headquarters Building
National Sanitation Foundation
Number
On Centers
Original Headquarters Building
Office of Logistics
Powerhouse Building
Public Building Standards
Printing and Photography Division
Pounds per Square Foot
Request for Change
viii
SECRET
npriaccifipri in Part - Sanitized COPY Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for ReleasIg.147/30 : CIA-RDP12-00036R000100240005-0
ACRONYM/
ABBREVIATION DESCRIPTION
RFI
Rev.
RTE
SACS
Sq.
ST
Sys
TBD
TBR
UPS
VAC
VEPCO
VSBC
VTR
WYE
Radio Frequency Interference
Revision
Route (ie. Highway)
Secure Access Control System
Square
Steam
System
To Be Done/Determined
To Be Resolved
Uninterrupted Power System
Volts, Alternating Current
Virginia Electric Power Company
Virginia Statewide Building Code
Vault Type Rooms
Y (Shaped Connection)
H50002
ix
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
*tcHET
PARA. NO.
9.2.2
9.2.2
9.2.3
H50002
TBD LISTING
DESCRIPTION ORGANIZATION TASKED
Table 9.2.2-1, Deep Tank & 20" Paper P&PD
.Processor Requirements
Table 9.2.2-2, 50" Paper Processor P&PD
Requirements
Table 9.2.3-2, Documate II, P&PD
Special Effects Printer and
30" Paper Cutter Requirements
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
5ECRET
H50002
1.0 INTRODUCTION
1.1 Purpose
This publication documents the Printing and Photography Division
Building (P&PDB) as it existed on 1 June 1986. This document is under the
control of the Facilities Management Board (FMB) and will be maintained by the
Configuration Management Staff (CMS)/FMD/OL in accordance with the
Headquarters Configuration Management Plan, H90001 and the applicable
documents in paragraph 2.0. Changes affecting the characteristics described
in this document will require the prior preparation and submission of a
Request for Change (RFC) form for approval by the FMB.
1.2 Scope
.This document describes the building structure, facilities,
essential networks, systems/networks and operationally critical areas of the
P&PB. This document serves as the "as built" baseline to be used in the
configuration control of the P&PB:
The scope of this document includes the contiguous five (5) feet
extending beyond the outer walls of the building. Other facilities on the
Headquarters campus are described in separate baseline documents.
1.3 Configuration Management Responsibilities
The Technical Monitor (TM) for this document is the Chief, FMD/OL.
The Configuration Management Staff (CMS)/FMD/OL will provide camera-ready
pages that document all changes that are submitted and subsequently approved
by the FMB. CMS will publish and distribute the change packages.
1-1
SECRET
npriaccifipri in Part - Sanitized COPY Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
*tt;FILT
2.0 APPLICABLE DOCUMENTS
2.1
Scope
1150002
This section lists those documents that govern the design,
construction, And characteristics of the P&PB.
2.2
Headquarters
CM Documents
H90001 Headquarters Configuration Management Plan
1180001 Agency Space Allocation Document
CM-01 Request for Change (RFC) Instruction
CM-02 Configuration Management Staff Instruction
CM-03 Controlled Document Preparation Instruction
2.3 Federal Standards
2.4
PBS-P3425.85
PBS-P3430.1
PBS-P7000. 2A
GSA
PBS-P5900.2
DSH1910
MIL-STD-461B
NACSIM 5100A
CFR FF 1-70
Part 1630
FTMS 372
No number
General Codes
Criteria for Federal Office Buildings, Jan. 1977
Quality Standards Design and Construction
Assignment and Utilization of Space, Rev. Oct. 1977
Federal Management Property Regulations
Accident and Fire Prevention, July 1960
Occupational Health and Safety Standards
Electromagnetic Emission and Susceptibility
National COMSEC Information Memoranda, Compromising
Emanations Laboratory Test Requirements
Standard for the Surface Flammability of Carpets
and Rugs
Critical Radiant Flux for Carpet Systems
Fire Protection Manual- CIA/DA/OL/SD
and Standards
NFPCA RP-1
NEC
NSF
VSBC
Standard Practice for the Fire Protection of
Essential Electronic Equipment Operations
National Electric Code
National Sanitation Foundation, Codes and Standards
Virginia Uniform Statewide Building Code
2-1
:SECRET
nni-laccifiinri in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
H50002
3.0 PRINTING AND PHOTOGRAPHY BUILDING DESCRIPTION
3.1 Scope
The following paragraphs describe size, form, construction, and .
operational facilities of the P&PDB.
3.2 Location
The P&PDB is located adjacent to the northwest corner of the New
Headquarters Building (NHB) in the Headquarters site in Langley, Virginia.
Figure 3.2-1 provides an overview of the site.
3.3 General Construction
3.3.1 Size, Form, and Organization
The P&PDB is classified by the BOCA Code as a use Group B,
business with a Group 2 ordinary hazard type occupancy. It is a two-story
rectangular structure measuring 325 feet by 120 feet for a total of 64,500
net square feet incorporated in two floors.
The P&PDB accommodates the production requirements of an
Agency-wide printing and photographic service. The first floor has most of
the printing operations facilities and the ground floor houses the
photographic operations. There are some administrative/office areas in the
building and a variety of equipment rooms supporting the physical plant. See
Figures 3.3-1 and 3.3-2 for the ground floor and first floor plans
respectively.
3.3.2 Construction Characteristics
The P&PDB is constructed of finished reinforced concrete. It has
a columnar grid spacing of 25'-0" (north-south) by 30'-'.0" (east-west). The
columns are designed to support two additional general office use floors
above the first floor.
3.3.3 Ceiling Height
The nominal unraised floor to unfinished ceiling height is 12
feet. Nominal dropped ceiling height above unraised floors is 10 feet.
3-1
SECRET
nprdaccified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
V
GW PARKWAY
?,4
ENTRANCE
14 'or
9 . 2a ANT ENNA
PUMPING STATION
ali
RTE. 123
ENTRANCE
WEST
%PARKING
STRUCTURE
MOTOR POOL
GARAGE
HAMM ERM I LL
FIGURE 3.2-1 HEADQUARTERS SITE OVERVIEW
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
tri
o)
0
0
X
GROUND FLOOR P&PD BUILDING FLOOR PLAN
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Ui
0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
FIGURE 3.3-2 FIRST FLOOR P&PD BUILDING FLOOR PLAN
3-4
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
H50002
3.3.4 Ceiling Materials
Except for the Press Branch and the Warehouse fire-rated acoustic .
tile suspended ceilings are used on the first floor. All suspended ceilings
have factory applied non-shedding plastic coated panels, perforated for
acoustic dampening'. The Press Branch and the Warehouse areas are open to the
concrete ceiling above, and painted. Ceilings in the ground floor are snap
on metal tile, except 'for room G32 which has regular suspended ceiling tile.
3.3.5 Walls
Except for concrete masonry walls and the fire walls that outline
the stairs and elevators, perimeter walls are readily removable, metal -
partitions extending from the floor to the dropped ceiling. The wall above
the suspended ceiling is constructed from 9-11 gauge expanded metal welded to
118 thick steel angle frame with the spot welds placed every six (6) inches.
The metal partitions are secured to the bottom channel or frame with a .1/4
inch carriage bolt placed two (2) feet on center or peened on the protected
side. The metal channel is anchored to the slab with 1/4 inch carriage bolts
placed two (2) feet on center. See Figures 3.4-1 through 3.4-4 for, specific
details.
3.3.6 Doors
Standard wooden doors and metal frames are used throughout the
P&PDB. All doors are a minimum of 3 feet wide by 7 feet high.
Technical areas are accessed through double doors with a nominal
opening of 5 feet x 8 feet.
All doors accessing service areas and lavatories include automatic
closure mechanisms and keyed locksets.
3.3.7 Floors
Concrete floor structures throughout are two-way waffle slab with a
4 1/2 inch conduit overlay slab.
Other than in photoprocessing areas which are covered with chemical
resistant quarry tiles, floors are covered with vinyl asbestos tile.
3-5
SECRET
npriacsified in Part- Sanitized CopyApprovedforRelease2013/07/30 CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
*tt.:11ET
H50002
3.4 Vault-Type Room Construction
3.4.1 Requirements
The security requirements governing the construction of Vault-Type
Rooms (VTR) for open shelf storage of classified material have been followed
in the P&PDB.
3.4.2 Walls
All VTR perimeter walls are built from true floor to true
ceiling. The walls are constructed from 9-11 gauge expanded metal welded to
1/8 inch thick steel angle frame with the spot welds placed every six
inches. The steel Angle frame is securely anchored to the true floor and
true ceiling by using a 1/4 inch bolt into the slab on 16 inch centers.
Movable metal partitions are used for interior walls throughout
the P&PDB. Because the metal partitions only extend from the floor to false
ceiling, the wall above the false ceiling is constructed from 9-11 gauge
expanded metal according to the specifications described in the preceeding
paragraph. The metal partitions are secured to the bottom metal channel or
frame with a 1/4 inch carriage bolt placed two feet on center and peened on
the protected side. The metal channel is anchored to the slab with 1/4 inch
carriage bolt placed two feet on center.
3.4.3 Doors
Perimeter doors are 1.3/4 inch metal fire doors having an
UL-approved rating of one and one-half hours. All VTR primary doors are
equipped with a security approved combination lock and a personnel control
(Simplex) lock as optional hardware. All secondary doors are solid wooden
doors and are equipped with approved sliding deadbolts or panic hardware.
3.4.4 Other Openings
All vents and ducts, which have openings exceeding 90 square
inches are grilled with 9-11 expanded metal. The space around the vent or
duct as it passes through an expanded metal partition does not exceed three
inches.
3-6
SECRET
npr.lassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
EXISTING CONC. FLOOR STRUCTURE
COMPRESSIBLE INCOMBUSTIBLE
MATERIAL W/ 1/4 POLYSULFIDE /
SEALANT CONT. BOTH SIDES OF MALL
WIRE TIES
SUSPENDED ACOUSTIC CEILING
PERIMETER ANGLE CONTINUOUS
3/4" CEMENT PLASTER
4' OR 6' CM WALL
RESILIENT VINYL BASE EA. SIDE
OF PARTITION
FINISH FLOORING
EXISTING CONC. FLOOR SLAB
STRUCTURE
FIGURE 3.4-1 CMU VAULT WALL CROSSECTION
3-7
SECRET
H50002
neclassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
WALL DETAIL OF VAULT TYPE ROOM
EXISTING CONCRETE
WAFFLE SLAB
POWDER ACTUATED
FASTENERS @ 12" O.C.
SUSPENDED CEILING
SYSTEM
16 GA. METAL STUDS @
16" O.C. WITH CONT.
9 GA. EXPANDED METAL
. TACK WELDED @si- " O.C.
5/8" GYP. BO. TYPE "X"
2?LAYERS
POWDER ACTUATED
FASTENER @ 2'-0" O.C.
EXISTING CONCRETE
FLOOR SLAB
H50002
FIGURE 3.4-2 GYPSUM BOARD AND METAL VAULT WALL CROSSECTION
3-8
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
1150002
UIST. CONC. iLOOR STIIUCTURE
STUD TRACK-FASTEN TO c_ OF CONC.
STRUCTUPE WITH POWDERICTUATED
FASTENERS
FASTER STUD TRACKS TOGETHER
16" O.C. STAGGERED
3 S/8" METAL STUDS t 16"
,O.C.
SUSPENDED ACOUSTIC CEILING SYSTEM
2 LAYERS' 5/8* TYPE X. GYPAID.
SECURE CONTINUOUS STUD TRACK
M/ FINDER ACTUATED FASTENERS
RESILIENT VINYL USE EA. SIDE
OF PARTITION
FINISHED FLOORING
EXISTING CONC. FLOOR SLAB
I STRUCTURE
FIGURE 3.4-3 TWO HOUR FIRE RATED WALL CROSSECTION
3-9
SECRET
npriassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
*tcliET
EXIST. CONC. FLOOR STRUCTURE
WIRE TIES
FASTEN STUD TRACK TO SUSPENDED
CEILING TEE
3 5/8" METAL STUDS IP 16'
O.C.
SUSPENDED ACOUSTIC CEILING SYSTEM
5/86 TYPE 'X GYP. BD.
SECURE CONTINUOUS STUD TRACK
W/ POWDER ACTUATED FASTENERS
RESILIENT VINYL BASE EA. SIDE
OF PARTITION
FINISHED FLOORING
EXISTING CONC. FLOOR SLAB
STRUCTURE
FIGURE 3.4-4 STANDARD INTERIOR WALL CROSSECTION
H50002
3-10
SECRET
npriacsified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
DtLaitT
H50002
3.4.5 Alarms
All VTRs are equipped with an intrusion alarm system furnished and
installed by the Office of Security (OS). Power is provided by a 120 VAC
dedicated power duplex outlet located above the primary entrance into the
VTR. A Belden No. 8723 transmission line running inside a 3/4 inch conduit
is provided between a junction box located above the suspended ceiling by the
primary door, to the alarm junction box located in the OHB "E" corridor -
electrical closet which ultimately terminates in Room 1F19.
3.5. Stairs and Corridors
There are two (2) sets of stairs in the P&PD Building connecting the
ground and first floors. One set is located next to the first floor entrance
lobby and the other Set is located just south of the northeast corner of the
building. Both sets of stairs exit onto.interior corridors located along the
east side of the building.
In the ground floor there is an east-west 6' corridor extending ?
between the Emergency Exit located by the southern end of the west wall of
the P&PDB and the elevator. A short corridor at these intersection runs
north and provides access to rooms G16 and G65. See Figure 9.2-1 in Section 9
In the first floor ther are two east-west and two north-south
corridors located in the northern half of the P&PDB as shown in Figures 9.3-1
and 9.3-2 in Section 9.
3.6 Elevators
There is one elevator south of the main lobby of the building
connecting the two (2) floors for use as both personnel and light freight
vertical transportation. This elevator rated at 4,500 lbs. capacity has a
platform size of 6'x 6 1/2' and door opening size measuring 5' x 7'. A
hydraulic ram located underneath the elevator drives it.
3.7 Loading Docks
There is one loading dock located along the southeast corner of the
building. This dock has the capacity to service one tractor trailer.
Clearance restriction is 10'. A 20,000 lb. capacity leveller is available to
facilitate the delivery of equipment which cannot be unloaded directly onto
the dock. All deliveries must pass through a doorway with a 9' x 10' size
opening.
3-11
SECRET
nne-Imccifiinn in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
SECRET
H50002
4.0 MECHANICAL SYSTEMS
4.1 Scope
This Section describes the major mechanical systems (services)
provided in the P&PDB. These include the HVAC, Chilled Water, Steam and
Plumbing Systems. Figure 4.0-1 indicates the location of the equipment
located in Room G5 which supports the mechanical systems.
4.2 Heating, Ventilating, and Air Conditioning
Two 50 tons (521105 CFM) Kopper Inc. Air Handling Units (ABUs)
located in Mechanical Equipment Room (G5) serve the building. In ADP
equipment areas, such as rooms 128 and 129, local AHUs supplement the
additional cooling load
The method of air supply to office areas facilitates office
partitioning. Air is supplied through air vents located next to the lighting
fixtures. Generally, air return from the room to the ceiling plenum space is
also returned through the lighting fixtures. This provides a "clean" ceiling
system and reserves alternate ceiling tiles for sprinkler heads, speakers,
occupancy sensors, etc.
Generally, labs and other special spaces are served from the
central air handling units. Certain areas with critical air balance
requirements are served from these systems using constant volume reheat
boxes. Some labs or special spaces are served by local dedicated air
handling systems. Fume hood exhaust fans are located in the roof to insure a
negative pressure in exhaust ducts within the building.
Computer areas are served by two air systems, one overhead and one
underfloor. This permits portions of the area to be used for office space as
required by the user's changing needs. The underfloor air system is designed
to handle that portion of the internal heat load which is in excess of the
office cooling load requirement. Thus, both systems operating together
provide ventilating and air conditioning for the computer areas.
4.3 Chilled Water
Approximatly 21 gpm of 50? F. chilled water for the central AHUs
in the Mechanical Equipment Room (G5) is provided via 8" diameter underground
pipe runs entering by the southeast corner of the ground floor.
4.4 Steam
Steam service for the building is provided via a 6" underground
pipe run which enters by the southeast corner of the ground floor.
4-1
SECRET
nne-ImccifiPri in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
H50002
4.5 Plumbing Systems
4.5.1 Domestic water System
The water service source for the P&PDB comes from a 12" perimeter
loop around the building.. Two service connections are made to this loop, oce
at the north and one at the south end of the building. These are
interconnected within the building to facilitate maintenance.
To provide proper operating pressures within the building,
variable speed constant pressure booster systems serve the upper levels of
the building.
Domestic hot water is generated by shell and tube heaters which
have the domestic water in the shell and steam in the internal tubes. All
systems of domestic hot water have circulation pumps to 'assure relatively
constant temperatures throughout the systems.
4.5.2 Storm Drainage System
Drainage from the building roof areas flows by gravity to the site
storm systems. Foundation drainage is pumped to connect to the site storm
systems.
4.5.3 Sanitary Drainage System
Waste from all fixtures and equipment within the building flows by
gravity to the site sanitary system, exiting the building at its northeast
corner.
4.6 Chemical Waste Handling System
4.6.1 Silver Recovery
Silver Recovery from black and white film processing is effected
by a single unit located in the Chemical Tank Farm in room G7. Recovery from
color film processing is effected locally with 10 gallon capacity units
located near the processors.
4.6.2 Chemical. Solids Removal
Removal of noxious chemical solids from Cibachrome color film
processing is effected with a 20 gallon capacity extractor located near the
processor. There are no other sources of noxious chemical solids in the
P&PDB.
4-2
SECRET
n.rincQifipri in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
H50002
4.6:3 Noxious Fumes Removal
Besides the normal ventilation of rooms by the HVAC system, ozone
and other noxious gases are removed from photo processing and chemical
storage rooms with ducts venting out through the roof of the facility.
4.7 Compressed Air and Vacuum System
The Compressed Air and Vacuum System supplies both a positive
pressure (i.e., compressed) air and a negative pressure (i.e. vacuum) air,
used in the operation of photographic and printing equipment. Figure 4.0-1
depicts the layout of the Mechanical Equipment Room G-5 and shows the
location of the operationally critical equipment.
4.7.1 Positive Pressure System
Two 60 HP Quincy model QLPS-6,0 compressors supply high-volume low
pressure air and two 58 HP Ingersall Rand model 200H compressors supply high
pressure air to the operations areas noted in section 9 herein.
The low pressure system draws 44.0 KVA, 208 V, 3 phase 60 Hz
power. The high pressure system draws 88.0 KVA, 208 V, 3 phase 60 Hz power.
4.7.2 Negative Pressure System
? Two 40 HP Quincy model QSVI vacuum pumps service the operations
areas noted in section 9 herein. They draw 44.0 TWA, 208 V, 3 phase 60 Hz
power.
4-3
SECRET
nprdaccifien in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
*tt;FIET
H50002
FIGURE 4.0-1 MECHANICAL EQUIPMENT ROOM G5 LAYOUT
.4-4
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
450002
5.0 FIRE PREVENTION SYSTEMS
5.1 SCOPE
This section provides information on the present fire prevention measures
existing in the P&PDB . This information is provided in the areas of.
detection fire alarms, central control equipment, local control panels,
sprinkler and Halon systems.
5.2 FIRE DETECTION
The predominant detection devices method used throughout the building are
thermal detection units. They are non-restorable heat sensitive detectors
that operate at approximately 135 degrees Fahrenheit.
The detector senses the heat released from a fire and causes a signal to
be sent to the monitoring control panels. This signal is also transmitted to
the central equipment in Room 1F19 of the OHB. Supervisory personnel are
notified so that appropriate action may be taken.
In data processing and switch rooms, Smoke detectors are utilized.
Ionization detectors are used in the above floor spaces to sense products of
combustion while photoelectric detectors are used below floor for sensing
smoke from the cables.
5.3 FIRE ALARMS
There are manual breakglass stations for initiating a fire alarm signal
throughout in the building. The audible alarm system is composed of bells
usually placed above the manual breakglass stations and in strategic locations
for occupant awareness. The operator in Room 1F19 of the OHB alarms these
bells by switches on a console.
5.4 FIRE EXTINCTION
There are wet pipe sprinklers located throughout both floors of the P&PD
Building. There is also an ample supply of portable fire extinguishers,
strategically located throughout both floors of the P&PD Building.
5-1
SECRET
noriaccifipri in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
H50002
6.0 FTECTRICAL SYSTEMS
6.1 Scope
This section describes the Electrical Systems characteristics and
related services which provide normal and emergency power; and lightning and
technical equipment grounding. See Figures 6.1-1 through 6.1-3 for a
description of the Electrical System.
6.2 Normal Service
One thousand (1,000) KVA of 60 HZ three phase power at 208/120
Volts is supplied to the P&PD Building from the normal feeder bus breaker #
BA off of the North transformer. The feeder enters the building along the
southwest corner and terminates at a 1,000 KVA transformer in G4, the
transformer room.
Five hundred (500) KVA Of 60 HZ three phase power at 208 Volts
are tapped from the existing bus above, to feed a 208 (3 Phase) to 480/277
Volts dry type transformer located within the new 480 Volt Switchgear.
From the equipment room, power is distributed via electrical
conduits to the local electrical power panels.
6.3 Emergency Service
One thousand (1,000) KVA of 60 HZ three phase power at 208 Volts
is supplied to the P&PD Building from the emergency feeder bus breaker # 8B
off of the South transformer. The feeder enters the building along the
southwest corner and terminates at a 1,000 KVA transformer in the
transformer room (G4).
. Five hundred (500) KVA of 60 HZ three phase power at 208 Volts
are tapped from the existing bus above to feed a 208 (3 Phase) to 480/277
Volts dry type transformer located within the new 480 Volt Switchgear.
From the equipment room, power is distributed via electrical
conduits to the local electrical power panels.
6-1
SECRET
nprlaccifiari in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
6CLAILT
H50002
In the worst case, i.e., technical power being supplied directly
from the main bus (in the bypass mode), through transformation conforms to.
the following characteristics:
60 Hertz
o Voltage: 208/120, 3-phase, Wye
o Voltage tolerance: +/- 10%
o Frequency: 60 Hz +/- 0.5%
o Voltage variation, line-to-line: less than 10% of the
arithmetic average of the three phases
o Harmonic content: less than 5%
6.4 Motorized Equipment Service
Electrical power to mechanical equipment loads is handled by
motor control centers. These centers are located west of column 3K in room
G5 and are fed directly from the the Switchboards in room G4. Motor Control
Centers A and B are fed from the 480 Volts Switchboard. They control the
four Vacuum Pumps located in room GS. The other motor control centers; MCC
1 and MCC 2, are fed from the 208/120 Volts Switchboard in room G4. They
control the Elevator, exhaust fans throughout and various pumps and
compressors.
6.5 Utility Grounding System
Utility grounds are used for all of the equipment and
applications not serviced by technical power. The basic system consists of
power safety grounds and ground risers of down conductors which connect
these safety grounds to an earth ground system.
The safety ground consists of a 2" x 1/4" copper bus bar running
along the south wall of the Transformer Room. The bus bar is connected to a
number of 5/8-inch copper ground rods driven approximately 20 feet into the
ground. The bus bar is also connected to bus bar loops surrounding two
transformer bays. All utility grounds and neutral, through their respective
panel boards and transformers, tie into the safety ground system.
6.6 Lightning Ground System
A counterpoise ground system which encircles the outside of the
building perimeter is. provided for use with the lightning system down
conductors. The counterpoise ground system is connected to the substation
ground mats and the building structural steel in order. to achieve an
effective equi-potential ground mass.
6.7 Lighting
Power for lighting is supplied by 277 volts, single phase 60
Hertz circuits throughout the P&PB. The selection and placement of fixtures
throughout the P&PB provides the recommended levels of illumination, listed
in the IES Lighting Handbook.
6-2
SECRET
nne-ImccifiPri in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
D.C. PANELBOARD
GENERAL ELECTRIC TYPE
'NAB'. MOUNT ON
I 5/8' CHANNELS
2000A 30.3W.
1/4'X6* BUS DUCT
EX. 4*X8'
CONCRETE CURB
500 KVA 208V.A TO 480/277V Y -4,
30.4W DOUBLE ENDED SUBSTATION)
DISCONNECT SWITCH TYPE COMBINATION
STARTER IN NEMA-I ENCLOSURE WITH
3P-30A N.F.S.S. AND NEMA SIZE 1 MAGNETIC
STARTER. H.O.A. SWITCH, PILOT LIGHT AND
I20V. FUSED CONTRCC TRANSFORMER.
1008
kVA
XFMR
1000
kVA
XFMR
2000A 30 3W
I/ AVX6'BUS DUCT
BELOW EXISTING
400011,30.4W BUS DUCT
71-111.4
FIGURE 6.1-1 SWITCHGEAR ROOM G4 LAYOUT
CONNECTED TO 3P-20A
C/13 IN EX. PANEL A.
TO AUXILIARY CONTACT IN EX. EXHAUST
FAN MOTOR STARTER.
EX.41300A.BlIS DUCT
SWITCHGEAR FRONT
EXISTING 208/120V. UAW
SWITCHING GEAR
CONCRETE PAD
CONCRETE PAD ?
PANEL 'A*, 208/120V. 30,4W.
GENERAL ELECTRIC CO. TYPE 'CCI3*.
VII fin WIN 1111=11111111111
nariaccifipri in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
MCC A
480V.-30.3W.
FRONT
MCC B
480V.30,3W.
--
VACUUM PUMP
CONTROLLER (TIP.)
40HP 480V VACUUM
(TYPICAL FOR 4)
2-3M. 310350 MCM
& 164 GM. IN EACH
.MECHANICAL EQUIPMENT ROOM
24')(24?PULL BOX
NEW TWO-SINGLE SECTION
MOTOR CONTROL CENTERS
MCC A. AMO MCC B
EXISTING MOTOR CONTOL CENTERS
MCC-1 & MCC-2
81 A2
B2
MCCA MCC8 MCCA MCCB
FIGURE 6.1-2 MOTOR CONTROL CENTERS IN ROOM G5
6-4
SECRET
H50002
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
WWMK
PROTtClat
0?).---NETTAIN
PROTECTOR
II
1 1
MORA. 3 EIPP.
RUCOUCT
.KMMOMWM
MWMTNCC-IP
PRNOR CONTROL
mamma-,
Meek NUS RUC
nenama
614 TC1,4 BEM 0
Ul
FIGURE 6.1-3 POWER RISER DIAGRAM
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
H50002
7.0 DATA 'NETWORKS
7.1 Scope
This section describes the data grids and local area networks
operating in the P&PDB.
7.2 Data Grid
The data grid provides the means of communicating between remote
terminals in. the P&PDB and the communications equipment on the ground and
first floors of the-OHB.
7.3 Data Grid Description and Configuration
All cables in the data grid are RFI protected twisted/shielded
cable. Cable runs between terminal boxes, pull boxes, communication
cabinets, and/or peripheral equipment, are routed in metal conduits. The
above said boxes, cabinets, and equipment are RFI protected themselves. The
overall configuration of the Data Grid in the P&PDB is schematically
illustrated in Figure 7.3-1.
7.4 Communications Room
Room G16 houses the communications and secure telephone equipment
in the P&PDB. The communications equipment provides interconnection between
the computer mainframes and Secure Telephone Switch in the OHB and the data
terminals and secure telephone switch in the P&PDB. Figure 7.4-1 is an
.
architectural layout of .Room G16 showing the Communications equipment and
secure telephone switch. Table 7.4-1 lists the electrical and cooling
services requirements for the equipment in Room G16. The secure grid
connects the secure telephones and data terminals within the P&PDB to the
secure telephone switch and communications equipment in Room G16.
7-1
SECRET
npriaccifipri in Part - Sanitized COPY Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
C PO ITg
4 PR
1 .
I
f
-tipRagi Jim
IPM1M111111111111 111Vsiw-11111111111111
r I IF
L5 1:--
11111111
I
? ?
N6 DATA' Lin/Ks
A o'
-P/P; ?
DATA
Pi'P
1
FIGURE 7.3-1 DATA GRID SCHEMATIC
,
sepaRE
TELEPriortES
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
RMS.
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
POWER FILTERS
DISCONNECT SWITCH
100 AMP, 30
SEE NOTE I
SEE NOTE 2
VENT
BARRED
r
I I
_ _ - ?
_
:
I.
I
'
1,
ER -5
KG-34
ER4
M-48
ER-
MEGA
MUX
ER- 2'
DATA
P/P
?t
II
I
r
L
I
1150002
? COP - 32 BLOCK
CONSOLE
.
---
1
L iu2T0X0
1
11
. ? T -
r"
ER-6
TRUNK 11
11
P/P c___
NOTES :
I. ISOLATION TRANSFORMER
15 KWA, 1 0 , TYPE 208.-120/240 VAC
2. ?AC DISTRIBUTION PANEL GE -12
POSITION 100 AMP, 10.
3. PP a 0 RED POWER PANEL SCHEDULE
EQUIPMENT SKR SKR EQUIPMENT
v(ft ? wft
UTX 1200
KG-34 (ER5 )
3
MEGA MUX (ER3)
5
ER2
7
UTX CONSOLE
9
2
TRUNK P/P
4
M48 ( ER4 )
6
8
DATA P/P (ER1)
10
12
FIGURE 7.4-1 ROOM G16 FLOOR PLAN
I I
'
II
7-3
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
TABLE 7.4-1 ROOM G16 EQUIPMENT LIST AND REQUIREMENTS
GO
CO
3,
rq
-4
MEG. TYPE
AND DESCRIPTION
MEG.
QUANTITY
COOLING REQ'TS (EACH)
LECTRICAL PWR REQ'TS EVA (EACH)
Ill
-4
CFH
KBTU/HR
AIR
KBTU/HR
WATER
120 VAC
1P,60HZ
208 VAC
1P,60KZ
208 VAC
3P,60HZ
208 VAC
3P,4001E
PANELS
UTX-1200
SWITCH
TELCO
1
14.0
4.1
CONSOLE
TELCO
1
1.0
0.3
M48
GFE
2.1
0.6
TDM 1258
GFE
1.5
0.4
KG-34
GFE
1
0.2
0.1
DATA PATCH PANEL
GFE
N/A
N/A
TRUNK PATCH PANEL
GFE
1
N/A
N/A
Ln
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
5tcHET
H50002
8.0 PHYSICAL SECURITY SYSTEMS
8.1 Scope
TWA section describes the control of access to the P&PD Building.
8.2 Physical Protection
The entire restricted space is maintained as a security premise.
Routine access is through a single pedestrian entrance and foyer. The foyer
is large enough to accommodate a guard station and reception area, with '
accommodations for less than ten visitors. Access to the space beyond the
guard is through two SACS controlled badge readers.
8.3 Alarms
8.3.1 Intrusion Alarms
All emergency exit doors, perimeter doors, and doors accessing -
designated restricted areas have, local alarms. These alarms are annunciated
at the central alarm console. The local alarms on the emergency doors
equipped with panic bars are battery operated.
8.3.2 Volumetric Alarms
OS approved Volumetric Alarms are installed in all restricted
access VERs.
8.3.3 Secure Access Control System (SACS)
All doors which access a technical or office area from a common
corridor are protected by a SACS. This system is of the card (Badge) reader
type. The control console is under the control of the Office of Security. A
secure/access switch is installed in the protected area by the door that it
controls. The alarm readouts are integrated with the alarm console.
8.3.4 Alarm Consoles
All security, safety, and utility consoles referenced in this
document are integrated, to the extent possible, into a single read-out
display and remoted to a control center in the Security Office complex in the
OHB.
8-1
SECRET
npriacsified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
H50002
9.0 OPERATIONALLY CRITICAL AREAS AND SYSTEMS
9.1 Scope
This Section describes areas and systems in the P&PDB that are
critical to operations. These are areas which have activities, functions
and/or equipment that are vital to the mission of the agency.
9.2 Photographic Operations
The Photographic Operations located on the ground floor consist of
VTRs and photographic laboratory facilities. See Figure 9.2-1 for a floor.
plan of the ground floor showing the operationally critical areas shaded and
Figure 9.2-2 for the critical equipment therein.
9.2.1 Tank Farm
The Tank Farm, located in VTRs 0-6 and G-7, contains the Chemical
Mixing System described in Table 9.2.1-1.
9.2.2 Film and Paper Processing Facilities
VTRs 013, 614, 015, G18, G19, G21, 026, 032, G36, G36A, G37 and
G44A are dedicated Film Processing Facilities. Tables 9.2.2-1 and 9.2.2-2
list the physical characteristics of the operations significant equipment in
these VTRs.
9.2.3
Film and Paper Printing Facilities
VTRs G20, 024, G25, 026A, G29, G30,
G31,
G34,
G39,
G40,
G42,
G43,
044,
045, 046, 048, 049, 050, G51A, 054, 055,
G56,
G57,
G59,
G60,
062,
G63,
G64 and.078 are dedicated Paper Processing Facilities. Tables 9.2.3-1 and
9.2.3-2 list the physical characteristics of the operations' significant
equipment in these VTRs.
9.2.4 Photo Copy and Inspection Facility
The Photo Copy and Inspection Facility is located in Room G65.
9-1
SECRET
npriaccifien in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
TRANS FORMER SW I TCHG EAR
ROOM T ROOM?
tio
FIGURE 9.2-1 GROUND FLOOR ARCHITECTURAL LAYOUT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
or
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
EXTEX
SILVER FILM
DUPLICATOR
EXTBC
DIAZO
G ROLL FILM
DUPLICATOR
DEEP
TANK
PROCESSOR
70MM
CUSTOM
CAMERA ()
CIBACHROME
COPY
SYSTEM
HOPE 50*
PAPER
PROCESSORS "0
LIPSNER SHIT
FILM ?zoos
[SYSTEM
HOPE 24E6
COLOR FILM
PROCESSOR
DOMINATE Il
ALLEN HOPE 52'
ROLL F LH PAPER
PROCES ORS PROCESSOR
KREI ITE
B&W PAPER
PRO ESSOR
CUSTOM
VIDEO
BROWN REPLICATI
COPY SYSTEM
CAMER
HOPE
MINILAB
SON!
10'c ALLENGE UI T?
PAPE CLEA
CUT T
XEROX
PAPER
DUPE
FIGURE 9.2-2 PHOTOGRAPHIC OPERATIONS EQUIPMENT FOOTPRINT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Ln
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
I!
CONTROL
PANEL
-Ir-7CHILL r-I WATER-
UNITJ,41 TANK
0
I
0.9
TANK
DECK
nu)
_J BATHS
o
cr
TANK FARM
1--
z
o
u
TANK FARM
=
TANK FARM
1-?I FILLER
/RESERVOIR
06 1
4Nik ?411SINK
I
.14F
MIX TANKS
BALLY FILM
REFRIGERATOR
I.
FIGURE 9.2.1-1 TANK FARM ARCHITECTURAL LAYOUT
9-4
SECRET
H50002
SILVER RECOVERY
E-4
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 :.CIA-RDP12-00036R000100240005-0
TABLE 9.2.1-1 TANK FARM EQUIPMENT LIST AND REQUIREMENTS
WEIGHT COOLING REQ'TS (EACH) I ELECTRICAL PWR REQ TS KVA (EACH)
MFG. TYPE
AND DESCRIPTION MFG. I QUANTITY
CHEMICAL MIXING
SYSTEM
HOUSTON
FEARLESS I N/A
KILO KBTU/HR KBTU/HR 1120 VAC 1208 VAC 1208 VAC 1208 VAC
LBS. I CFM AIR WATER I1P,60HZ I1P,60HZ I3P,60HZ 13P,400HZ PANELS
TEN
CHANGES
N/A IPER HR I N/A - 166.4 - ROOM GS
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
0
x
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
TABLE 9.2.2-1 FILM AND PAPER PROCESSING EQUIPMENT LIST' AND REQUIREMENTS
MEG. TYPE
AND DESCRIPTION
WEIGHT
KILO
MFG. QUANTITY LBS.
=LING RUM (PACK
ROLL FILM
PROCESSOR
ALLEN
PRODUCTS 1 IN G13 1.2
KBTUIHR KBTU/HR 1120 VAC
CFM AIR WATER 1P,60HZ
TEN
CHANGES
PER HR 20.0*
ELECTRICAL PWR REQ TS KVA TEACH)
268 VAC- 208 VAC 1208 VAC
1P,60HZ 3P,60HZ 13p,400HZ PANELS
7.1
SILVER FILM
DUPLICATOR
EXTEK
MICROSYS 1 IN G14 N/A
10.0
3.6
DIAZO ROLL FILM
DUPLICATOR
FIIM CLEANING
SYSTEM
EXTEK
MICROSYS 1 IN G15 .2
LI PS
SMITH
CORP. 1 IN G19 1.0
4.2
1.8
N/A
4.6
B&W FILM
PROCESSOR
HOPE
INDUST'S 1 IN G26 1.9
TEN
CHANGES
PER HR
N/A
8.3
DEEP TANK
PROCESSOR
TBD 1 IN G18 TBD
TBD
TBD
20- PAPER
PROCESSOR
KREONITE 1 IN G21 TBD
TBD
TBD
TBD
TBD
LG1
PC]-
TBD
TBD
TBD
TBD
TBD
npriacsifiAri in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
TABLE 9.2.2-2 FILM AND PAPER PROCESSING EQUIPMENT LIST AND REQUIREMENTS
(Room G32)
MFG. TYPE
AND DESCRIPTION
I MFG.
QUANTITY
WEIGHT
KILO
LBS.
COOLING REQ'TS (EACH). ELECTRICAL PWR REQ'TS KVA (EACH)
CFM
KBTU/HR
AIR
KBTU/HR 1120 VAC -1-20a VAC
WATER 11P,6082 11P,60HZ
208 VAC
3P,60HZ
208 VAC
3P,400HZ
PANELS
CIBACHROME COPY
SYSTEM
J ILFORD/
IDAINIPPON
2
1.4
7
N/A
4.0
PG4
MINI-JAB
HOPE
INDUST'S
1
1.7
TEN
CHANGES
PER HR
7.5
I-
10.4
PG5
C-41 FILM
PROCESSOR
HOPE
INDUST'S
1
1.9
TEN
CHANGES
PER HR
N/A
8.3
PG4
24" E6 COLOR FILM
PROCESSOR
HOPE
INDUST'S
1
2.6
TEN
CHANGES
PER HR
N/A
7.7
PG4
50", PAPER
PROCESSOR
HOPE
INDUST'S
1
TBD
TBD
TBD
TBD
TBD
0
npriacsified- in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
TABLE 9.2.3-1 VIDEO REPLICATION EQUIPMENT LIST AND REQUIREMENTS
(Room G34)
MFG. TYPE
AND DESCRIPTION
VIDEO
REPLICATION
SYSTEM
MFG.
QUANTITY
WEIGHT
KILO
LBS.
COOLING REQ TS (EACH)
ELECTRICAL PWR REWTS KVA (EACH)
CFM
KBTU/HR KBTU/HR
AIR WATER
120 VAC
1P,60HZ
208 VAC 208 VAC 1208 VAC
1P,60HZ 3P,60HZ 13P,400HZ
PANELS
CUSTOM
N/A
N/A
32.8
9.6
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 CIA-RDP12-00036R000100240005-0
TABLE 9.2.3-2 FILM AND PAPER PRINTIYG EQUIPMENT LIST AND REQUIREMENTS
I
I MFG. TYPE
I AND DESCRIPTION
MFG.
QUANTITY
WEIGHT
KILO
LBS.
COOLING REQ TS- (EACH) I ELECTRICAL PWR REQ'TS KVA (EACH)
CFM
nCBTU/111
AIR
V K8TU/HR 1120 VAC
WATER 11P,60HZ
1208 VAC
11,060HZ
1208 VAC
3P,60HZ
208 VAC
31,0400HZ
1
PANELS
B&W PAPER
PROCESSOR
KREONITE
1 IN G65
N/A
-
19.5
-
I
-
6.2
-
-
PG3
ULTRASONIC
CLEANER
SONICOR
INSTRUM'T
1 IN G65
.9
TEN
CHANGES
PER HR
N/A
-
4.6
-
-
TBD
PAPER DUPLICATOR
XEROX
1 IN G65
2.4
-
13.7
-
-
8.3
-
-
TBD
52" TRACK
PAPER PROCESSOR
HOPE
INDUST'S
1 IN G68
2.7
TEN
CHANGES
PER HR
5.5
. -
F
-
-
9.4
T
-
PG3
DOCUMATE II
DOCUMATE
1 IN G78
TBD
TBD
TBD
-
TBD
-
-
TBD
312 COLOR PRINTER
KODAK
1 IN G44
-
5.0
-
1.8*
-
-
-
TBD
SPECIAL EFFECTS
PRINTER
OXBERRY
1 IN G60
TBD
-
TBD
TBD
-
-
-
TBD
30" PAPER
CUTTER
CHALLENGR 1 IN G65
TBD
TBD
N/A
TBD
-
-
T
TBD
* 1.6 KVA of 208 VAC ALTERNATE
nprlacRifiari in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
SECRET
H50002
9.3 Printing Operations
The Printing Operations located on the first floor consist of VTRs
and Printing Services Facilities. See Figure 9.3-1 for a floor plan of the
first floor showing the Operations Critical areas shaded, and Figure 9.3-2
for the footprint of the critical Equipment therein.
9.3.1 Electronic Prepress
The Electronic Prepress is located in Rooms 128 and 129 in a
raised floor computer environment. Table 9.3.1-1 lists the physical
characteristics of the operations significant equipment therein.
9.3.2 Camera/Layout/Plate Areas
Rooms 123, 127, 130, 139, 140, 141, 142, 143, 144, 145, 147, 148,
149, 150, 151, 152, and 153 are dedicated to Camera/Layout and Plate
composition activities. Table 9.3.2-1 lists the physical characteristics of
the operations significant equipment therein.
9.3.3 Press & Bindery Areas
Rooms 112 and 113 are dedicated to Press and Bindery operations.
Table 9.3.3-1 lists the physical characteristics of the operations
significant equipment therein and Figure 9.3.3-1 shows the location and
footprint of these equipment..
9-10
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
kV/ N
0
?
fii
/
rlifnili
op 1E TRALLIoN
4.0
/
AREAAL
i .
127
r ,4r
is
/
AA
Al r jr 4,
A00
W&OT
OPERATIONALLY
CRITICAL AREA
,
,
or
--aggoi
mit / -1
i23
er
,docitres,
52
a
WASHROOM
Of
/
IP
I
,
i III:
A
? ?
1 c.
611
,53
.
n
INII
M
I
0
_
V
J
---
184
::
i
I All
t
_
,
_
*
ww,*A m w ? w w ?J
WASHROOM
FIGURE 9.3-1 FIRST FLOOR ARCHITECTURAL LAYOUT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
0
0
P.3
Ca
CI
-4
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
FIGURE 9.3-2 PRINTING OPERATIONS EQUIPMENT FOOTPRINT
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
TABLE 9.3.1-1 ELECTRONIC COMPOSITION EQUIPMENT LIST AND REQUIREMENTS
(Rooms 128 & 129)
MFG. TYPE
AND DEScRIPTIoN
ATEX SYSTEM
CDC SYSTEM
APS 5
Xy VISION
WEIGHT I COOLING REQ'TS (EACH)
KILO ICBTUFW RBTU/HR
MFG. I QUANTITY I LBS. CFM AIR WATER
T
ONE IN
ATEx I RN 129 _ _ 62.7 _
[ 1
ONE IN
CDC I Rm 129 - 15.0 -
120 VAC
IP,60HZ
9.6
ELECTRICAL
1208 vAC-
IIP,60HZ
1
8.8
AWR REQ'TS KVA (EACH)
208 VAC 208-VAC T
3P,60H2 3P,400Hz PANELS
4.4
ONE IN
ROOM 129
ONE IN
ROOM 129
ONE IN
AUTOLOGICI RH 129
ONE IN
Xy VISION RM 129
30.0
8.8
ONE IN
ROOM 129
30.0
8.8
ONE IN
ROOM 129
LASER1TE v -
PLATE mAx111
sCIENTIFC
TWO IN
R14128
30.0
3.6
(440 VAC)
23.0
IN
mECH,L
ROOM
N.)
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
TABLE 9.3.2-1 CAMERA/LAYOUT/PLATE EQUIPMENT LIST AND REQUIREMENTS
MFG. TYPE
AND DESCRIPTION
MFG.
T WEIGHT
KILO
QUANTITY LBS.
COOLING REQ'TS (EACH)
CFM
KBTU/HR KBTU/HR
AIR WATER
CP-340
SCANNER
HELL
ONE IN
RM 130
N/A
120 VAC
1P,60HZ
ELECTRICAL PWR REQ' TS KVA (EACH)
208 VAC 208 VAC 208 VAC
1P,60HZ 3P,60HZ 3P,400HZ PANELS
3.0
TBD
32-ML B&W
FI114 PROCESSOR
PAKO
ONE IN
R/4143
44 C
CRONALITH PROCESSOR
DUPONT
ONE IN
R/4145
300
42" FIIM PROCESSOR
KREONITE
ONE IN
RM 150
11.5
TBD
TBD
12.5
5.8
T ,
6.6
TBD
TBD
TBD
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
TABLE 9.3.3-1 PRESS AND BINDERY EQUIPMENT LIST AND REQUIREMENTS
(Room 113)
MFG. TYPE
AND DESCRIPTION
MFG.
QUANTITY
WEIGHT
KILO
LBS.
COOLING REQ'TS (EACH)
ELECTRICAL PWR REQ'TS KVA (EACH)
CFM
KBTU/HR
AIR
KBTU/HR
WATER
120 VAC
1P,60HZ
1208 VAC
11P,60HZ
1208 VAC
13P,60HZ
208 VAC
3P,400HZ
PANELS
MIEHLE
COLOR PRESS
M.A.N.
ROLAND
1
67.5*
N/A
I 188.0
ROOM G5
9900
PAPER DUPLICATOR
XEROX
[ 2
3.3
26.6
I
10.4
1
PG3(B)
25" FAVORITE
PRESS
?
MIEHLE
2
7.0
N/A
1
I 6.3
PG 3(A)
PLATEN
CHANDLER
PRICE
1
3.5
N/A
1
1 6.3
PG 3(A)
TBD
HEIDEL-
BERG
1
8.7
N/A
1
1
I 12.5
TBD.
TBD
TOMAC
1
.6
TBD
I 4.1
PG3(B)
TBD
A-B DICK
1
.6
N/A
1.8
I
1
PG3(B)
VERTICAL PRESS .
MIEHLE
1
3.0
N/A
I 6.2
PG 3(A)
ENVELOPE PRESS
TBD
1
1.2
N/A
I 6.2
PG 3(B)
MIEHLE
40" 1 COLOR
M.A.N.
ROLAND
1
N/A
I 36.0
TBD
MIEHLE
40" 2 COLOR
M.A.N.
ROLAND
1
N/A
1 50.0
TBD
?
50" MIEHLE
M.A.N.
ROLAND
1
N/A
I 89.0
TED
npriacsified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
TABLE 9.3.3-1 PRESS AND BINDERY EQUIPMENT LIST AND REQUIREMENTS (Continued)
MFG. TYPE
AND DESCRIPTION
MFG.
QUANTITY
WEIGHT
KILO
LBS.
COOLING REQ TS (EACH)
ELECTRICAL MR REQ'TS KVA (EACH)
.CFM
KBTU/HR
AIR
KBTU/HR
WATER
120 VAC
1P,60WZ
208 VAC
1P,60MZ
208 VAC
3P,60HZ
208 VAC
3P,400HZ
PANELS
GOSS
WEBB PRESS SYSTEM
ROCKWELL
1
47.0
MINOR
1.8
52.0
P9
52" CUTTER
LAWSON'
3.0
MINOR
6.6
P1/14
SADDLE/GATHERER/
STITCHER
DEXTER
1
0.6
MINOR
- ?
15.4
P2/20
PERFECT BINDER
MULLER
MARTINI
1
0.4
10"
EXHAUST
MINOR
6.6
P1/4
3 KNIFE TRIMMER
BOHLEN -
BERG
1
4.0
MINOR
8.8
P1/27
18" FOLDER'
HULLER
MARTINI
1
1.5
MINOR
3.3
TBD
40" FOLDER
BAUM
1
3.5
MINOR
6.6
P1/25
12 STATION COLIATOR
HARRIS/
MACEY
1
1.2
MINOR
6.6
P1/20
PADDER
KANSA
1
0.8
18"
EXHAUST
8.8
P2/23
SIDEB1NDER
HARRIS/
MACEY
1
1.5
MINOR
6.6
P1/15
MULTIBINDER
HARRIS/
MACEY
1
1.0
MINOR
6.6
P1/15
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
N3ONIS3OIS
3-KNIFE
LAWSON
52' CUTTER
1 MARCEY C
LATOR
112
I MARCEY
THIIND I
PADDER
LAWSON
52' CUTTER
W 13 PRESS
A DICK
ESS
XEROX
9900
104
MIEHLE
VERTICAL
PRESS
HEIDELBERG
PRESS
0
MIEHLE
40'
2 COLOR
113
MIEHLE COLOR PRESS
MIEHLE 25' FAV. PRESS
ENVELOPE
PRESS
XEROX
9900
_1
JOMAC
DRYER
1111111001111
rnTiiii Firm
COLOR I
PRESS
CONTROLS
CHANDLER
PRICE
PLATEN
?
103
FIGURE 9.3.3-1 PRESS & BINDERY EQUIPMENT FOOTPRINT (Room 113)
1"1
neclassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0
0
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30 : CIA-RDP12-00036R000100240005-0
SECRET
H50002
9.4 STORAGE FACILITIES
The critical storage rooms in the.P&PB and the Figure number of the
architectural layout locating each room are:
Room 103 Solvents Figure 9.3-1
Room 104 Bulk Materials & Supplies Figure 9.3-1
Room G6 Chemicals & Walk-in Freezers Figure 9.2-1
Room G75 Paper & Film Cold Storage Figure 9.2-1
9-18
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2013/07/30: CIA-RDP12-00036R000100240005-0