OMB BULLETINS 1977

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP06M00944R000200080002-6
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
119
Document Creation Date: 
December 27, 2016
Document Release Date: 
July 17, 2013
Sequence Number: 
2
Case Number: 
Publication Date: 
August 25, 1977
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP06M00944R000200080002-6.pdf3.54 MB
Body: 
r1M11 01117 "OrriCr lkt. 77_1 Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 25 August 77 Distribution made 8/30/77: STAT ? 1 - OGC Library, I - AO/DCI Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON. D.C. ?0503 BULLETIN NO. 77-12 August 25, 1977 TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Additional Subfunction Coding of Decision Units 1. Purpose. This Bulletin provides instructions on classifying, by additional subfunctions, zero-base budgeting agency submissions. This information will be used to sort decision packages so that related activities can be reviewed. 2. Coverage. These instructions apply to all Executive Branch agencies that are required to provide budget submissions based on zero-base decision packages in accordance with OMB Circular No. A-11. 3. Rep2rting req2irements. Agencies will prepare a report on raditional subTunctions, in the format of Exhibit 1, for each decision unit submitted to OMB. The reports will be prepared in accordance with instructions in Attachment A of this Bulletin. They will accompany the decision unit overview and set of decision packages that are submitted to OMB in accordance with section 24.1 of OMB Circular No. A- 11 4. Classification of data. Attachment B provides agency and bureau chapter codes, which are needed to complete the report. Attachment C provides the titles and codes of the functions and subfunctions shown in the most recent budget documents. These will be used to identify the additional subfunctions associated with each decision unit. 5. Rescission. This Bulletin is rescinded following receipt of the subfunction coding, report (Exhibit 1). 6. Inquiries. Requests for assistance should be directed to the Fiscal Analysis Branch, Budget Review Division, Office of Management and Budget 395-4520 or 395-3930). ert L Director Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ATTACHMENT A Bulletin No. 77-12 INSTRUCTIONS FOR THE PREPARATION OF MATERIAL FOR ADDITIONAL SUBFUNCTION CODING OF DECISION UNITS This Attachment provides instructions for the preparation of the additional subfunction coding report. This report will be submitted as a covering report with each decision unit overview and set of zero-base budgeting decision packages prescribed by.section 24.1 of OMB Circular No. A-11. Agencies heVe'been instructed to identify for each decision unit the budget subfunction representing the unit's primary purpose. . In: the ncirmal budget usage, all outlays are classified in the function and subfunction reflecting their primary purpose. However, in this exercise we are asking that the agency provide a covering report to identify other functional/ '..for subfunctional categories that describe additional (alternative) purposes served by the programs or a major patt''Pf the program in each decision unit. Two copies of the additional subfunction coding report will be prepared on 8" x 10-1/2" paper in the format of Exhibit 1. The identifying information and blocks should be filled out as described below. Identifying information. Enter the following information to TNEITTy TEe-5,257ET3E2T subfunction coding report. This information Should agree with the identifying information provided in the corresponding decision unit overview as prescribed bli,section 24.1 of OMB Circular No. A-11. , Block 'A.: A22na Chapter Code. Enter the applicable TWE=ai9lt agency chaTiler-ZEde-Ticim the list found in Attachment B to this Bulletin. Block B. Bureau Chapter Code. Enter the applicable TWo-3igit buTeau Mapter code from the list found in Attachment B to this Bulletin. Block C. A2en,sy Decision Unit No. Enter the unique TET-digit dcThxonTIETE-Fae resigt-ilted by the agency pursuant to section 24.1 of OMB Circular No. A-11. Block b4Decision Unit Budget Year Outlays. Enter the agasioo4411-EaTet-Tar-37ISig- Tor tEe "cumulative total" -eabmitted in the highest level decision package accompanying the decision unit overview. BlockE. Budget Subfunction Code. Enter the three- amt coa- TOT -IFe-EIMEE subfunction of the decision Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ' 2 unit. This code is the last 3 digits in the 11-digit "identification code" for the account included in the decision unit overview, except when the decision unit Contains two or more accounts with different sUbfunctions. In those cases, enter in this block the subfunction code for the account having the largest outlays. Block F. Additional Subfunction Codes. Enter adalTionil three-CI-Mit subfunaion codes -- up to a maximum of five subfunctions -- that apply to all or portions of the decision unit. If possible, the additional subfunction codes should be in descending order of magnitude of outlays. See Attachment C to this Bulletin for a list of subfunction codes. Reasons for additional subfunctions. Include in the space proviBed a BescriptIon oT tbi-ieason(s) for assigning each eddcit,id.On'al subfunction code listed. The description should belaucCinct, as illustrated by the example in Exhibit 2. The additional subfunctions identified should have a si2nificant direct relationship to the program. For example, Exhibit 2 illustrates the Operation of Indian Programs account, which is primarily area and regional development; hence its budget subfunction code is 452. The additional subfunctions identified also have the following direct relationship to the program's purpose: .0.111 ????????? the public assistance and other income supplement subfunction (code 604 in the income security function) because of the welfare and housing assistance provided to Indians; the training and employment subfunction (code 504 in the education, training, employment and social services function) because of the training and employment assistance provided to Indians; the law enforcement assistance subfunction (code 754 in the law enforcement and justice function) because of the law enforcement activities on Indian lands; and the other general government subfunction (code 806 in the general government function) because of the assistance to Indian tribes for operation of tribal governments. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Ns. ADDITIONAL SUBFUNCTION CODING A. Agency Chapter Code B. Bureau Chapter Code C. Agency Decision Unit No. D. Decision Unit Budget Year Outlays (Highest Cumulative Total) (In thousands of dollars) E. Budget Subfunction Code 1 F. Additional Subfunction Codes ... 2 3 4 5 6 . I , i . , . I I I . I I I ?I I .I I I I I I I I . I . I . I . I Descriptive reason for assigning additional subfunction codes above: Subfunction code 2: Subfunction code 3: Subfunction code " Subfunction code 5: Subfunction code 6: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 N.) Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 14,# ADDITIONAL SUBFUNCTION CODING Department of the Interior Bureau of Indian Affairs Operation of Indian Programs (Area and Regional Development): 14-2100-0-1-452 ci A. Agency Chapter B. Bureau ChapterDecision C. Agency D. Decision Unit Budget Year Outlays (Highest E.. Budget Subfunctiou F. Additional Subfunction Code Code Unit No. Cumulative Total) (In thousands of dollars) Code Codes 1 3' 5 6 I 1 1 I 1 I I I 1 i 1 I I I I I 1 0 7 6 Q 3 4 1 350,000 4 5 2 6 0 4 5 0 4 7 5 4 8 0 6 I 1 I I i 1 I I I 1 I I i i I I Descriptive reason for assigning additional subfunction codes above: Subfunction code 2: Subfunction code 3: Subfunction,code 4: Subfunction code Welfare and housing assistance for Indians. Training and employment assistance for Indians. Law enforcement on Indian lands. 5$Assistance to Indian tribes for operation of tribal governments. Subtunction code 6: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ATTACHMENT B Bulletin No. 77-12 AGENCY AND BUREAU CHAPTER CODES 01-00 Legislative Branch: 05 Senate 10 House of Representatives 12 Joint items 14 Congressional Budget Office 15 Architect of the Capitol 25 Library of Congress 30 Government Printing Office 35 General Accounting Office 40 United States Tax Court 45 Commission on Security and Cooperation in Europe 45 Botanic Garden 45 Copyright Royalty Tribunal 45 Cost-Accounting Standards Board 45 Temporary Commission on Financial Oversight of the District of Columbia 45 Office of Technology Assessment 02-00 The Judiciary: 05 Supreme Court of the United States 10 Court of Customs and Patent Appeals 15 CustoMs Court 20 Court of Claims 25 Courts of Appeals, District Courts, and other judicial services 26 Administrative Office of the United States Courts 30 Federal Judicial Center 31 Space and facilities, the Judiciary 32 Expenses, United States Court facilities 34 Bicentennial expenses, the Judiciary 35 .Judiciary trust funds 03-00 Executive Office of the President: 05 Compensation of the President 10 The White House Office 20 Executive Residence 21 Official Residence of the Vice President 22 Special assistance to the President 30 Council of Economic Advisers 31 Council on Environmental Quality and Office of Environmental Quality 33 Council on International Economic Policy 34 Council on Wage and Price Stability 35 Domestic Council 40 National Security Council 45 Office of Drug Abuse Policy 48 Office of Management and Budget 49 Office of Science and Technology Policy Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 50 Office of the Special Representative for Trade Negotiations 51 Office of Telecommunications Policy 57 Special Action Office for Drug Abuse Prevention 04-00 Funds Appropriated to the President: 02 Appalachian regional development programs 03 Disaster relief 05 Unanticipated needs 07 Expenses of management improvement 09 International security assistance 10 Indochina postwar reconstruction assistance 12 International development assistance 13 International narcotics control assistance 15 Contingencies 18 Israel-United States binational industrial research and development foundation 20 Balance of payments loan for Portugal 25 Petroleum reserves 30 Emergency refugee and migration assistance 50 Public works acceleration 05-00 Department of Agriculture: 03 Departmental administration 18 Agricultural Research Service 21 Animal and Plant Health Inspection Service 24 Cooperative State Research Service 27 Extension Service 30 National Agricultural Library 32 Economic Management Support Center 33 Statistical Reporting Service 36 Economic Research Service 48 Farmer Cooperative Service 51 Foreign Agricultural Service 57 Foreign assistance programs 60 Agricultural Stabilization and Conservation Service 63 Federal Crop Insurance Corporation 66 Commodity Credit Corporation 69 Rural Development Service 72 Rural Electrification Administration 75 Farmers Home Administration 78 Soil Conservation Service 80 Federal Grain Inspection Service 81 Agricultural Marketing Service 82 Packers and Stockyards Administration 83 Food Safety and Quality Service 84 Food and Nutrition Service 96 Forest Service 06-00 Department of Commerce: 05 General administration 07 Bureau of the Census 08 Bureau of Economic Analysis Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 10 Economic Development Administration 15 Regional Action Planning Commissions 25 Domestic and International Business Administration 40 Minority Business Enterprise 44 US. Travel Service 48 National Oceanic and Atmospheric Administration 49 National Fire Prevention:and Control Administration 51 Patent and Trademark Office 52 Science and technical research 70 Maritime Administration 07-00 Department of Defense--Military: 05 Military personnel 07 Retired military personnel 10 Operation and maintenance 15 Procurement 20 Research, development, test, and evaluation 25 Military construction 30 Family housing 35 Civil defense 37 Special foreign currency program 40 Revolving and management funds 45 Allowances 55 Trust Funds 08-00 Department of Defense--Civil: 05 Cemeterial expenses, Army ? 10 Corps of Engineers--Civil 17 Ryukyu Islands, Army 20 Soldiers' and Airmen's Home 25 The Panama Canal 30 Miscellaneous accounts 09-00 Department of Health, Education, and Welfare: 10 Food and Drug Administration 15 Health Services Administration 20 Cehter for Disease Control 25 National Institutes of Health 30 Alcohol, Drug Abuse, and Mental Health Administration 35 Health Resources Administration 37 Office of Assistant Secretary for Health 40 Office of Education 42 National Institute of Education 44 Office of Assistant Secretary for Education 60 Social Security Administration 70 Special institutions: 70 American Printing House for the Blind 70 National Technical Institute for the Deaf 70 Gallaudet College 70 Howard University 80 Assistant Secretary for Human Development 90 Departmental management 25-00 Department of Housing and Urban Development: 1 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ? 4 02 Housing programs 03 Government National Mortgage Association 06 Community planning and development 12 New Communities Administration 26 Federal Insurance Administration 27 Consumer affairs and regulatory functions 28 Policy development and research 30 Departmental management 10-00 Department of the Interior: 04 Bureau of Land Management 06 Bureau of Reclamation 12 Office of Water Research and Technology 16 Bureau of Outdoor Recreation 18 United States Fish and Wildlife Service 24 National Park Service 28 Geological SurVey 30 Mining Enforcement and Safety Administration 32 Bureau of Mines 62 Alaska Power Administration 64 Bonneville Power Administration 68 Southeastern Power Administration 72 Southwestern Power Administration 76 'Bureau of Indian Affairs 82 Office of Territorial Affairs 84 Office of the Solicitor and Office of the Secretary 11-00 Department of Justice: 03 General administration 05 Legal activities 10 Federal Bureau of Investigation 15 Immigration and Naturalization Service 17 Drug Enforcement Administration 20 Federal Prison System 21 Law Enforcement Assistance Administration 12-00 Department of Labor.: 05 Employment and Training Administration 10 Labor-Management Services Administration 15 Employment Standards Administration 18 Occupational Safety and Health Administration 20 Bureau of Labor Statistics 25 Departmental management 30 Special commissions and councils 14-00 Department of State: 05 Administration of foreign affairs 10 International organizations and conferences 15 International commissions 20 Educational exchange 25 Other 21-00 Department of Transportation: 05 Office of the Secretary 15 Coast Guard Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 5 0 20 Federal Aviation Administration 25 Federal Highway Administration 27 National Highway Traffic Safety Administration 30 Federal Railroad Administration 32 Urban Mass Transportation Administration 35 Saint Lawrence Seaway Development Corporation 37 Materials Transportation Bureau 15-00 Department of the Treasury: 05 Office of the Secretary 07 Office of Revenue Sharing 08 Federal Law Enforcement Training Center 10 Bureau of Government Financial Operations 12 Bureau of Alcohol, Tobacco, and Firearms 15 United States Customs Service 20 Bureau of Engraving and Printing 25 Bureau of the Mint 35 Bureau of the Public Debt 45 Internal Revenue Service 55 United States Secret Service 57 Comptroller of the Currency 60 Interest on the public debt 19-00 Energy Research and Development Administration 20-00 Environmental Protection Agency 23-00 General Services Administration: 0 05 10 Real property activities Personal property activities 20 Records activities 25 Automated data and telecommunications activities 30 Property management and disposal activities 31 Preparedness activities 35 General activities 27-00 National Aeronautics and Space Administration 29-00 Veterans Administration 30-00 Other independent agencies: 01 ACTION 02 Administrative Conference of the United States 05 Advisory Committee on Federal Pay 10 Advisory Council on Historic Preservation 16 American Battle Monuments Commission 17 Arms Control and Disarmament Agency 18 Board for International Broadcasting 20 Central Intelligence Agency 24 Civil Aeronautics Board 28 Civil Service Commission 32 Commission of Fine Arts 35 Commission on Civil Rights 37 Committee for Purchase From the Blind and Other Severely Handicapped 38 Commodity Futures Trading Commission 0 39 Community Services Administration Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 6 40 Consumer Product Safety Commission 41 Corporation for Public Broadcasting 42 District of Columbia 44 Emergency Loan Guarantee Board 46 Equal Employment Opportunity Commission 48 Export-Import Bank of the united States 52 Farm Credit Administration 60 Federal Communications Commission 64 Federal Deposit Insurance Corporation 65 Federal Election Commission 66 Federal Energy Administration 68 Federal Home Loan Bank Board 72 Federal Maritime Commission 76 Federal Mediation and Conciliation Service 78 Federal Metal and Nonmetallic Mine Safety Board of Review 80 Federal Power Commission 84 Federal Trade Commission 88 Foreign Claims Settlement Commission 31-01 Harry S. Truman Scholarship Foundation Historical and memorial commissions: 03 American Revolution Bicentennial Administration 05 Other historical and memorial agencies 06 Indian Claims Commission Intragovernmental agencies: 08 Advisory Commission on Intergovernmental Relations 09 Appalachian Regional Commission 10 Delaware River Basin Commission 11 Interstate Commission on the Potomac River Basin 12 Susquehanna River Basin Commission 14 Washington Metropolitan Area Transit Authority 16 Intelligence Community Oversight 17 International Trade Commission 20 Interstate Commerce Commission 21 Japan-United States Friendship Commission 22 Legal Services Corporation 23 Marine Mammal Commission 25 National Capital Planning Commission 27 National Center for Productivity and Quality of Working Life 30 National Commission on Libraries and Information Science 34 National Credit Union Administration 35 National Foundation on the Arts and the Humanities 36 National Labor Relations Board 40 National Mediation Board 45 National Science Foundation 47 National Transportation Safety Board 50 Nuclear Regulatory Commission 32-05 Occupational Safety and Health Review Commission Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 7 0 08 Pennsylvania Avenue Development Corporation 10 Postal Service 20 Railroad RetireMent Board 25 Renegotiation Reard .- 35 Securities and g):Chcange CoMMi$Sion 40 Selective Service System 45 Small SuainesS Administration 50 Smithsonian Institution 33-11 Joint Federal-eState in Use Planning Commission for Alaska 12 Other temporary commissions 13 National Commission PO thg Observance of Inter- national Women's year, 1975 15 Tennessee Valley Authority ' 25 United States Information Agency 30 United States Railw,ay Association 35 Water Resources Council . Off budget Federal entities: . Department of Agriculture; 55-05 Rural i.ectrifiqatiOn and Telephone kW/Caving Fund 55-05 Rural,Telephone Ban . . Department of Housing arid Urban: Development: ..., * ' . 55-.25 Housing for the lldsrly In handi900Ped fgrld? Department of.babor:' .- : 55-35 Pension $enefit-GParanty -CO-PP:ration' Department of-Tre4SUrYi Th- ? 55-45 Enphange Stabilization Fund 55-45 Federal Firlancing.Pank ' Independent agenciest - Peard of Governors of. thejederal Reserv System 55-75 Postal Service . 55-85 United States RaiWayAsSOciati.6.11,. Government sponsored,'pirVately. owned 4nterprisesi: Department of. Realth,.EdupatiOn, and'Welfere:. 61-60 "Stlident toan.Marketing.ASSOciation. . . Department of Housing :end' Prban DsVelppmenti. 61-60 . Federal NatiOnal Mortgage Association Farm Credit AdministrAi9P; '' ' 61-70 Ranks for cpoperatiVes ' . 61-70 Federal intermediate?etre'dit banks 61-70 jederal land banks . , Federal Home Loan Bank pQ4r0i - 61-60 Federal home loan banks 61-90 Feder4l HOme-lioan Mortgage Corporation Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ATTACHMENT C Bulletin No. 77-12 FUNCTIONS AND SUBFUNCTIONS IN THE 1978 BUDGET: CLASSIFICATION CODES AND TITLES The titles and codes of the subfunctions listed in this Attachment will be used to identify the additional subfunctions associated with each decision unit. Background information on the functional classification (Appendix 1) and definitions of each function (Appendix 2) are also provided to assist in classification by additional subfunctions. 050 NATIONAL DEFENSE 051 Department of Defense-Military 052 Military assistance 053 Atomic energy defense activities 054 Defense-related aCtivities 150 INTERNATIONAL AFFAI4 151 Foreign economic and financial assistance 152 Conduct of foreign affairs 153 Foreign information' and exchange activities -155 International financial programs . 250 GENERAL SCIENCE, SPACE, AND TECHNOLOGY 251 General science and basia research 253 Space flight 254 Space science, applications, ?and technology . 255 Supporting space activities 300 NATURAL RESOURCES, ENVIRONMENT, AND ENERGY 301 Water resources and power 302 Conservation and land management 303 Recreational resources 304 Pollution control and abatement 305 Energy , 306 Other natural resources 350 AGRICULTURE 351 Farm income stabilization 352 Agricultural research and services Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 400 COMMERCE AND TRANSPORTATION 401 Mortgage credit and thrift insurance 402 Postal Service 403 Other advancement and regulation of commerce 404 Ground transportation 405 Air transportation 406 Water transportation 407 Other transportation 450 COMMUNITY AND REGIONAL DEVELOPMENT 451 Community development 452 Area and regional development 453 Disaster relief and insurance 500 EDUCATION, TRAINING, EMPLOYMENT, AND SOCIAL SERVICES 501 Elementary, secondary, and vocational education 502 Higher education 503 Research and general education aids 504 Training and employment 505 Other labor services 506 Social services 550 HEALTH 551 552 553 554 555 600 Health care services Health research and education Prevention and control of health problems Health planning and construction General health financing assistance INCOME SECURITY 601 General retirement and disability insurance 602 Federal employee retirement and disability 603 Unemployment insurance 604 Public assistance and other income supplements 700 VETERANS BENEFITS AND SERVICES 701 Income security for veterans 702 Veterans education, training, and rehabilitation 703 Hospital and medical care for veterans 704 Veterans housing 705 Other veterans benefits and services Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 3 750 LAW ENFORCEMENT AND JUSTICE 751 Federal law enforcement and prosecution 752 Federal judicial activities 753 Federal correctional and rehabilitative activities 754 Law enforcement assistance 800 GENERAL GOVERNMENT 801 Legislative functions 802 Executive direction and management 803 Central fiscal operations 804 General property and records management 805 Central personnel management 806 Other general government 807 Federal Financing Bank 850 REVENUE SHARING AND GENERAL PURPOSE FISCAL ASSISTANCE 851 General revenue sharing 852 Other general purpose fiscal assistance 900 INTEREST 1 901 Interest on the public debt 902 Other interest 950 UNDISTRIBUTED OFFSETTING RECEIPTS 951 Employer share, employee retirement 952 Interest received by trust funds 953 Rents and royalties on the Outer Continental Shelf Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 I ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Sr Appendix 1 Bulletin No. 77-12 BACKGROUND INFORMATION ON THE FUNCTIONAL CLASSIFICATION The functional classification is one of the principal methods used in classifying budgetary data; it has been used for three decades as the framework for discussing the President's program in the budget documents. The historical data tables for outlays in the budget are presented almost exclusively in functional terms, thereby Providing a consistent basis for comparing changes in spending over time. In addition, the Congressional Budget and Impoundment Control Act of 1974 (P.L. 93-344) requires that the Congress exercise control over the budget through use of targets by function. This provision means that the functional classification is not only used to display. the budget, but also to control it. Background. A comprehensive functional classification of budget authority and outlays was first used in the 1948 budget. As stated in that budget: By grouping together items which are functionally related, regardless of the agency which is responsible, this type of classification provides for the Congress and the public a useful summary of what the Government is doing, or expects to do, and, in general, focuses upon the ultimate purpose which the government programs are designed .to serve. * Thus, the emphasis of the functional classification is on what the Federal Government seeks to accomplish rather than on the means of accomplishment, what the Government purchases, or the clientele or geographic area served. (An example of a clientele group not identified in the functional structure is "Indians"; Indian health programs are in the health function; Indian community development programs are in community development, etc. In contrast, one interest group (veterans) has traditionally been singled out and treated as a separate function.) In the past, each unit being classified (i.e., generally, an appropriation account) has been classified into the single best or predominant purpose served. Quite often, alternative classifications have been both possible and reasonable. For example, training of medical research *The Budget of the United States, 1948, p. 1353. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 - ? ir Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 personnel in a military hospital could readily be classified as national defense, as education, as manpower training, or as health. Because an activity is classified in the budget into the one category that identifies its predominant purposes, and because most Federal programs serve more than one goal, the amount shown in the budget in virtually every function understates the total Federal resources applied to that purpose. This method is necessary if the sum of the outlays (or budget authority) for all functions is to equal the budget total, and it continues to be the rule in the context of the functional presentation in the budget documents. However, the purpose of this bulletin is to obtain an accurate and rigorous identification of the multi-purpose activities of decision units and to code these units accordingly. The functional classification structure is being used because it is the best existing classification structure for this purpose. The budget subfunction code assigned to a decision unit will be the subfunction code assigned to the account from which that unit is funded. The additional subfunction codes will identify the less important purposes served by the activities of that decision unit. For example, the primary purpose of medicare is to promote health, so in the functional classification it is in the health function (subfunction 551). However, under this bulletin the medicare program could also be classified as income security and coded in the report in the most nearly appropriate additional subfunction category (in this case, subfunction 604). The primary purpose of this exercise is to identify the major additional (alternative) subfunctional codes. It is recognized that choosing the most nearly appropriate additional subfunction codes must necessarily be arbitrary in part, since the subfunction titles are structured to identify the primary purposes and are simply being adapted for this exercise. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIAIRDP06M00944R000200080002-6 Bulletin No. 77-12 DEFINITIONS AND PARAMETERS OF THE FUNCTIONAL CATEGORIES The following definitions and parameters for major functions provide guidance in determining the categories (i.e., additional to the budget subfunction used to identify the account that finances the decision unit) for the additional subfunction coding report to be submitted with the 1979 agency budget submissions. Comparable definitions and parameters for subfunctions have not been developed. Therefore, classification by additional subfunctions must be based upon the guidance provided by these definitions of functional categories, the list of functional and subfunctional codes and titles in Attachment C and upon the judgment of the classifier. This description of major functions wa? originially developed to aid in functional classification of each unit by primary purpose (i.e., by budget function and subfunction). For the purposes of this Bulletin, the descriptions are to be used to determine applicable additional subfunctions for each decision unit. Since these additional subfunctions need not be within the same major functional category as the budget subfunction, some activi- ties that are not classifiedunder a particular funOtioh-al 0 category -- but are closely associated with it -- are specifically identified as candidates for classification as additional subfunctions. National defense This function includes those programs directly related to the common defense and security of the United States. It includes the raising, equipping, and maintaining of armed forces (including civilian supporting activities); development and utilization of weapons systems (including nuclear weapons); and the provision of military assistance to friendly governments. National defense includes direct compensation and benefits paid to active military and civilian personnel; contributions to their retirement, health, and life insurance funds; military retired pay; the conduct of defense research, development, testing, and evaluation; and procurement, construction, stockpiles, and other activities undertaken with the direct object of fostering our national security. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M009441R600200060602-6 Declassified in Peri - Sanitized Copy Approved for Release 2013/07/17 : CiA-RDP06M009441R000200080002-6 ? _ . - ? - . ? ? EXclUdedfrom.natianaLdefenae functional classification but identified as candidates for claSsificatiOhaaadditional -OUbfunctions are the peadeful conduCt Of foreign :relations, foreign . economic development And humanitarian assistance, ?SubSidiet.tp busiries5jApy-;.64Villan .agencies 'that. ? May The partially justified :.*...promoting. national sectitityrand research and operation Of agencies (suth as space research) whose. program mission is not directly designed to promote national ? defense but which could result in some significant benefits:to our national sedurity. Internatibnal affairs This function is concerned with the establishment and maintenance of peacefUl. relations, commerce, travel, and developMent between the United States and the remainder of the world. It includes the conduct of foreign affairs, S. Membership in international- ? CirganizatiOns, foreign information and eichange .activities, economic Assistance programs, and grant and Than programs designed to foster fereigh cammerce. ? ,? Excluded from the ihterhatiOnal. affairs function but identified as candidates:far .clasdificatiOn- at Additional subfunctions aremilitary-AsSistande programs, and other .programs. that are. COhderned:H.significantly (bOt.2: not primarily) with the . establiShment and, maintenanCe of peaceful relations, commerce, travel, and development between 'the United Stated' and the remainder of the world (e.g., promotion of tourism' and. commerce). General science, spade, and.teChnology . ; The purpose of this function is. ? to show all science and research activities of the Federal Government where the goal is man's general advancement of knowledge. In addition, research program d that haVe diverse goals and Cannot readily be classified into one specific; function ate also placed here to avoid detailed splitting of accounts. Included in this function are general scientific research programs that are not an integral part of the programs conducted under another function. This includes the research conducted by the National Science Foundation' Space research and technology, except aeronautical technology; and the broad-based. scientifid activities of the Energy Research and Development Administration, 3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 3 As is noted above, research programs that are an integral part of the achievement of other major functions -- e.g., health, national defense, energy -- are excluded from this function. Nonetheless, these research programs could be classified as additional subfunctions relative to this budget function. Natural resources, environment, and energy This function includes those programs whose primary purpose is to develop, manage, and maintain the Nation's natural resources and environment or to promote the conservation and development of energy resources. It encompasses development and management of water resources and power; protection and enhancement of environmental quality; development and maintenance of recreational resources; promotion of the prudent use of forest and mineral resources; nondefense research and applications of nuclear power, fossil fuels, and other energy sources; other energy programs such as fuel allocation and energy conservation programs; the fostering of conservation practices on both public and private lands; and the management of the public domain. Excluded from being classified in this function are urban water supply programs, basic sewer systems, and waste treatment plants that are an integral part of a Federal facility (such as a military installation) unless these activities are an integral part of an environmental protection program and are specifically funded as environmental protection. Nonetheless, such activities are candidates for classification as additional subfunctions relative to this budget function. Agriculture This funttion includes those programs that promote the economic stability of agriculture and the capability to maintain and increase agricultural production. These objectives are accomplished through farm income stabilization programs, research and educational activities, programs that maintain agricultural markets, regulation of agricultural markets and practices, and losses from the disposal of surplus commodities. The function does not include programs which, though related to rural development, are not directly related to agriculture. Examples . are rural environmental and conservation programs, which are classifiedlin the natural resources function. Nonetheless, such programs might well Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6- 4 be classified as additional subfunctions relative to this budget function. Commerce and transportation This function includes the promotion and regulation of commerce and transportation. Activities classified in commerce include collection and dissemination of social and economic data unless this is an integral part of another major function (such as health); loans, subsidies, insurance, and regulation of business unless these are an integral part of another function; and the subsidy to the Postal Service. Activities classified as transportation include all programs with the primary aim of providing for the transportation of the general public and/or their property, regardless of whether local or national and regardless of the particular mode of transportation. They include the construction of facilities; purchase of equipment; research, testing, and evaluation; provision of communications directly related to transportation (for example, air traffic control by the FAA); and operating subsidies for transportation facilities (such as airports) and industries (such as railroads). Transporation includes regulatory activities directed specifically toward the transportation industry rather than toward general commerce. Excluded from classification in this function but candidates for classification as additional subfunctions are foreign economic assistance related to transportation facilities or programs abroad; the construction of roads, trails, etc., as an integral part of the operation of public lands, parks, forests, or military reservations, unless they .are specifically funded as part of a broader transportation system; the construction of roads or other transportation facilities as an integral part of a broad community facility or regional development program where the clear intent of the program is regional development and the provision of transportation facilities is only an incidental by-product or means to attain the objective of regional development. Also excluGed from classification as transportation are research and technology activities devoted to space research, except for aeronautical technology, even though this research may eventually be to the advantage of general transportation. These activities might, of course, be classified as additional subfunctions relative to this budget function. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Community and regional development 5 Activities classified in this function consist of broad- based community and regional development programs and programs concerned with urban and rural renewal. They incluae water supply and sewer systems (except those specifically funded as environmental protection programs); urban renewal programs, regional economic development programs, broad-based public facility construction programs, and rehabilitation of public facilities in the event of natural disasters. As a normal rule, social services, transportation facilities and operating subsidies, and business loans and grants are excluded from classification in this function. However, if sucn programs are undertaken as specific means to achieve the broader community development goals and such programs are financed out of broad community development programs rather than as an integral part of transportation, social service, or other programs, they will be included in community development. Otherwise, they may be classified as additional subfunctions relative to this budget function. Education, training, employment, and social Services 0 Activities that are classified in this function include those with outlays designed to promote the general extension of knowledge and skills and/or to assist individuals to become self-supporting members of society. It inclUdes the provision of education or training services, income support directly related to training or education, child care, and general social services: provided to individuals and families. It includes cash payments (scholarships, loans, or stipends) to persons when such payments are provided to enable a person to participate in education or training programs. It also includes research directly related to the provision of said services. It excludes education or training undertaken as an integral part of the achievement of another functional end (such as training of military personnel; veterans education, training, and rehabilitation; or training of health research workers in a health program) and also excludes general purpose scientific research. (Of course, these activities might be classified as additional subfunctions.; The provision of social services -- child care, employment counselling, and vocational rehabilitation -- are included in this function unless they are restricted to, and are an integral part of, anotheir function, in which case they may Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 6 be classified as additional subfunctions relative to this budget function. Health The programs classified in this function involve those that have as their basic purpose the promotion of the physical and mental health of the Nation's population, including the prevention of illness and accidents. They include research into the causes and cure of disease; promotion of consumer and occupational health and safety; planning, financing, and provision of medical care; the financing of specialized programs for training of health workers and researchers; and food (including meat), drug, and other product safety inspection programs. Excluded from the health function but identified as candidates for classification as additional subfunctions are Federal fund medical costs that are an integral part of the cost of Federal employment (such as medical care for military personnel and veterans), general scientific research that has medical applications (such as health research conducted by the National Science Foundation), and health programs that are an integral part of foreign assistance. Income security This function includes payments to persons for which no current service is rendered. It includes retirement (excluding military retired pay), disability, Unemployment, and welfare payments and the associated administrative costs. Also included in income security are the food stamp, special milk, and child nutrition prograMs (whether the benefits are in cash or kind); both Federal and trust fund unemployment compensation and workmen's compensation; public assistance cash payments; benefits to the elderly and to coal miners; and low - and moderate-income housing aids. Excluded from the income security function but identified as candidates for classification as additional subfunctions are financial assistance for educational purpeses, cnild care services, vocational and employment training, vocational rehabilitation services and stipends, medical:care (whether in cash or kind), subsidies to businesses (such as farm price supports) that end up as income to persons, income security programs restricted to veterans and their c.ependents, and military retired pay. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 7 0 Veterans benefits and services This function consists of programs providing benefits and Services, the eligibility for which is related to military service but which are not an integral part of national defense. It includes veterans service-connected compensation; veterans non-service-connected pensions; veterans readjustment benefits, housing, and medical care programs. As a normal rule, activities classified in this function are similar to those in the broader general purpose functions (such as income security or health) but are restricted to veterans and their dependents. Hence, where the broader- based functions provide benefits to veterans, they should be reported as additional subfunctions relative to this budget function. Law enforcement and justice This function includes those programs designed to provide judicial services, police protection, law enforcement (including civil rights), rehabilitation and incarceration of criminals, and promotion of the general maintenance of domestic order. Excluded from this function but identified as candidates for classification as additional subfunctions are the activities of the legislative branch, the narrow-purpose police or guard activities providing protection to Federal property, activities that are an integral part of a broader function (such as postal inspectors, tax collection agents, and Park Service Rangers), and the costs of. National Guard personnel and military personnel who are called upon occasionally to provide general public safety protection, as well as military police. General government This function includes the general overhead costs of the Federal Government including legislative and executive activities, provision of central fiscal, personnel, and 'property activities; and the provision of services that cannot reasonably be classified in any other major function. As a normal rule, all activities reasonably or closely associated with other functions shall be excluded from the general government function. Nonetheless, general overhead costs of departments and agencies that are associated with other functions could be classified as additional subfunc- tions relative to this budget function. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Revenue snaring and general purpose fiscal assistanbe. This function includes Federal aid to State, local, and territorial governments that is available for general fiscal support or is available for distributiOn atahg ,programs involving two or more major budgetary functions *hen the distribution among those functions is at the disctetion of the recipient jurisdiction. It includes payments in lieu of taxes, broad-purpose shared revenues, General Revenue Sharing, and the Federal payment to the Dittriat of Columbia. Interest .Interest is the cost attached to borrowing or lending money. It is not an objective in and of itself, but rather a result of seeking to fulfill other objectives. The other objectives can normally be identified in two broad groupings: (1) those in which the transaction directly gives rise to interest payments or income; and (2) the general shortfall of income over outgo (or the conver8e) aribing out of fiscal, monetary, and other policy considerations and leading to the creation (or elimination) of inteteat-bearing debt instruments (normally the public debt). The interest function includes interest on the public debt, on uninvested funds, on tax refunds, and interest recorded in budgetary receipt (propriety or intergovernmental) accounts (except for interfund interest received by trust funds). Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 6:r.? BULLETIN No. 77-11 Declassified in Part- Sanitized Copy Approved for Release 2013107117: CIA-RDP06M00944R000200080002-6 /lc J.Jrr Distribution made: 1 - DDA 1 - DDI 1 - DDO 1 - DDS&T 1 - AO/DCI 2 - Chief, DDA Grou STAT 1 - OGC Library, 1 - OMB Bull STAT 1- -gpacx fl rv-i 60 /Ao Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON, D.C. 201503 June 28, 1977 BULLETIN NO. 77-11 TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Controlling Grade Escalation in the General Schedule 1. Purepose. This Bulletin establishes a plan for monitoring, evaluating, and controlling increases in the average grade of specific General Schedule occupations within executive branch agencies. 2. Background. Since May 1976, the Office of Management and Budget (OMB) and the Civil Service Commission (CSC) have been working with other executive agencies on a series of activities aimed at better controlling average grade Government-wide. In conjunction with these efforts, OMB and CSC .have developed a new information system for analyzing changes in average grade. All executive agencies and establishments having 500 or more employees as of the date of this Bulletin and in March 1974 are covered by the system. It has been designed to allow OMB, CSC and agency heads to better measure present accomplishments and problems; to alert them to grade escalation trends as they begin; and to allow for precise tracking of agency progress toward reaching grade reduction targets where these are determined necessary. The system will provide very detailed information on the specific occupations within each department and its subordinate bureaus where grade escalation has occurred. It will also provide comparative cost data to illustrate the cost implications of maintaining the present grade structure in these occupations as opposed to exploring alternative structures. Specifically, the new system will provide: a. A rank ordering of series within each agency based ? upon the costliness of the increase in average grade which each series has experienced. This is a factor of the amount of the increase, the population, and the salary levels involved. b. An analysis, by occupation within agencies, of the percentage of employees presently at each grade Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M009441R000200080002-6 . level and the percentage change at each grade level from the reference date of march 1914. An analysis, by occupation !within agencies, of the comparative differences in cost between the preterit percentage distribution of employees at each grade :level, and the percentage of employees at eath grade level: (1) That existed in this same occupation and agency in March 1974. (2) That presently exists for this occupation Government-wide. A. 1A rank ordering of series within each agency based upon the rate at which their average grade has increased. e. A rank ordering of series within each agency :bated upon the rate at which their average grade has increased, adjusted .to take into account differences between the present agency and ? Government-wide average grade for each series. f. An analysis of the .total net increase in average grade agency-wide adjusted to account for ChangeS in series population. 3. Mired Actions. The first data from this new system .shoul e ready in late July 1977. Subsequent reports will be furnished on a semi-annual basis. All agency heads of -units included in the system will receive the information at soon AS it is available. Upon receiving these analyses, agencies should examine the data and identify those occupations where there is a substantial cost impact, or rate of increase, or potential for savings. Not all series need to be reviewed. A high ranking on any one or More of the factors described in 2.a.-f. above could, however, be ? significant. This would include, for example: 0 a. Series with small populations. . which have a ? relatively low cost of increase ranking (factor 2.a.), but are increasing at a very rapid rate ? (factors 2.d. and 2.e.). b. Series with large increases in the percentage of employees at high grade levels.(faCtor 2.b.). Such Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ? r . Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 3 shifts are a problem even where increased entry level hiring has kept average grade fairly stable and thus factor 2.d. and 2.e. ratings are low. Over time the new employees are themselves eligible for promotion to the higher senior level grades. When and if series expansion abates, average grade can escalate dramatically. c. Series where the cost of the present grade distribution pattern is markedly higher than the comparative cost if employees were distributed in accord with the 1974 or the Government-wide pattern (factor 2.c.). Such series might present an opportunity to achieve great savings through job restructuring, etc., even though they have had only moderate recent increases (factor 2.d.), and thus low cost of increase rankings (factor 2.a.). ' 4. Grade Reduction Targets. For each series identified in the manner described in section 3 above, agencies will: a. Determine whether the increases in average grade which have occurred are fully supported and required by changes in the nature and complexity ? (not volume) of the work. b. Determine whether the existing grade structure is essential in light of comparative cost data on alternate grade structures in other agencies, and the grade structure Government-wide. c. Set grade reduction targets for those occupations which fail to meet either of the above criteria. Not all series will have targets. In light of the special emphasis given to position management and job classification in the past year, and the many ongoing internal programs to control grade escalation which agencies have reported to OMB and the Civil Service Commission, it is anticipated that agency heads should ? already have sufficient data on hand to make initial grade ? reduction projections. Agencies will submit proposed occupational grade reduction targets to OMB along with their FY 79 budget requests (see attachment for format). For each occupation where grade reduction targets are determined necessary, agencies will provide: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ? 7-`1 ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 4 a. ThsCivil, Service: job classification series, code, azdtitle, The-. agency. occupational. title. if different. Average-. grade. Listed, in most recent change average- grade analysis. The. praposed average grade: target. level, to. be: reached by the. end. of each of the. next three: fiscal,. years,. beginning, with FY 78. OMW review and. these, grade reduction. targets in caniunctian with the normal. budget. process. Agencies will. be notified, only,. if there. are questions- regarding their. proposed targets. Data on changes in average grade- will be madeevailable to agencies. semiannually. As they receive. new reports. agencies will review, their progress on. existing: goals and: the need. for new or revised' targets:inthe occupations identified.. lmvitementation Plans. Agency heads have the primary: 'responsi_iIity for' ensuring. that. adequate, grade reduction 'goale-are set, and it is intended that agencies have the, maximum: flexibility. in developing, and' carrying out.. programs and:plansto meet these goals. There, are a variety, of 'options. available to, agencies' including: Ensuring: that increases in average grade are: fully.. supported, by Civil Service Cbmmission job.. classification standards,. The. Commission'. will: be: using. data from the study as an aid, in planning its. own. allocation of classification, review resources. b. Evaluating, all vacancies., to determine, whether they- can. be eliminated or restructured at elower,gradS c. Closely monitoring and' carefully evaluating: promotions. Reviewing supervisory levels, with particular attention to. the extent of.. "layering? and- the need for deputies, or assistants. e. Reviewing the organization structure of each unit. to determine if existing .staffing patterns. are. still appropriate in view Of' program changes. O Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Staffing new programs in a manner that will tend to lower average grade. f. Reorganizing work where appropriate so that it can be accomplished with lower graded employees. For example, using technicians where professional staff is not being utilized at their full skill level. Strengthening agency position management systems prescribed by OMB Circular A-64. As long as agreed-upon goals are being met, agencies are not required to submit implementation plans to OMB. Justifications, timetables, background papers should not be submitted unless specifically requested. (3. 6. Effective Date. These instructions are effective upon issuance of this Bulletin. 7. Inquiries. Inquiries should be addressed to the OMB representative in charge of the agency's budget estimates. Attachment Comm Bert Lan e Director Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ATTACHMENT BULLETIN NO.77-11 Agency Title Date PROPOSED GRADE REDUCTION TARGETS FOR (list fiscal year of budget submission) a. b. c. d. Series Classification Agency. Title Present Average Target Code Title If Different Grade Example: 343 Management Analyst FY 78 FY 79 FY 80 10.7 10.60 10.50 10.35 a. The Series Code and Classification title can be found in the Civil Service Commission published classification standards and its Handbook of Occupational Groups and Series of Classes. b. Leave blank if no difference. Within an agency, this occupation might be referred to by another name such as Program Analyst or Program Evaluation Specialist. c. This is the average grade listed in Tab A of the most recent change in average grade report. Agencies will be provided with this information. d. This is the end-of-year grade reduction target agreed upon by OMB and the agency. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M09944R000200080002-6 41?.e?-?114-/Ic Declassified in Part- Sanitized Copy Approved for Release 2013107117: CIA-RDP06M00944R000200080002-6 STAT eccseeet- anzz--4- I ? 40/Der /?ode Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 EXECUTIVE OFFICE OF THE PRESIDENT ? OFFICE OF MANAGEMENT AND BUDGET WASHINGTON. D.C. 20503 BULLETIN NO. 77-10 .May-26, 1977 TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Information required for the Mid-Session Review of the 1978 Budget 1. Purpose. These instructions cover the Preparation and submission of information. required for the Mid-Session Review of the 1978 Budget. The Review will be transmitted to the Congress on or before July 1, 1977. 2. Background. For the-purpose of. preparing this report, OMB must obtain.: revisions ,in the estimates of *budget authority, outlaysi..and _receipts for 1977 end 1978 previously transmitted tw-thg.Collgress; estimateebudget authority and outlays for the four succeeding years for eaah accodnt; and estimatecEoutlays for the four succeeding/ years from 1978 year-errd balances of controllable programs. The Mid-Session Review will present the current status of. the President's Budget, including estimates for Government- owned entities outside the budget totals. The detailed information contained in this report, together with supporting data, will be used by the Congress in connection with its budget scorekeeping responsibilities and for the development of the second concurrent resolution. Agencies should pay particular attention to current spending trends to ensure that outlay estimates for 1977.and 1978 are realistic. In revising the estimates, agencies should also take into account the revisions transmitted to the Congress on April 22 and subsequently. 3. Definitions. In preparing this report, revisions will be made .to budget estimates transmitted to the Congress on three previous occasions. In this Bulletin, these earlier estimates are referred to as follows: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 4. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 Jarluarry r:BUidget February 'audget ReVisions uoi estiMate's :Erans- 7Mitted to the COngiess on 4-anuary 17-, 1977 ("Fiord Igudget"). . , Revised budget estimates tr.ansmitted 'to the Congress On 'February 22, 1977 ("C-atter Budgel") April estiMatee The "Current 'Budget Estimates" ttaritiffift.ted to Congress on April 22, ? - 4. Mater4als tetiblied% 'OMB prOVide for agency use three copies of TheSuppleMentafy SouiCe Doc6Ments (SD ) and the ,Retflgt,Atedattata T44Ve., 4eaoh of which 'COhiains data from the Febtbaty balget TeViSiOns: In addition, each agency will reeeiVeLthree depiee Of a lOnprange projection file and some agehclee Will teceivethree copies of a file with infOtmatibb oh lihexpeh.ded FY 1978 balancee from the January budget4 :The ageWCiegabbid use the 'data filee,:as follows: a: SUPPlebehtaCy illaabment tile. 'hi S file contains the abahhttgAn the February budget revisions. It will be used at_th.e basis fot aggerlay review and submission of data for the Mid=SessiOn RevieWl The file ShoUld be.ahnotated 'ea follOWS: ; (1) For,:atcoUntS tO_Ohibh.nd chafiges are neceSeary, the file.shoUld be ogt-kga v. in the left margin 'opposite the 11-digit identifiCatioh codel (2) Chariget tO the 112'digit identification Code may be reguired due to a change ih fhe iranSmittal status of proposed. aMoUnta (gee 014.8 Circular NO. A:-11, section 21..3). For example, the file fof the' February budget revisions sepatately identified Many Of th8 Changes as items 'for litei transmittal (tfehaMittal Ccide 3): In all cases in which these requests have since been ttahtmitted to the Congress, the. amounts thy-ado-go ghadia 4614 JiieFia into the regular budget schedule affibuhtg (0afiftita1 code 0); Other chariges which should be Made-in'aludei All erifidted aliellpieMentals should be merged With dither enadted amodnts. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013;07/17 : CIA-RDP06M00944R000200080002-6 3 0 The transmittal status for amounts in the February . budget revisions that were proposed for later transmittal under proposed legislation (transmittal code 2) should be reviewed. If only ?the authorizing legislation has been transmitted, ,the transmittal code 2 should be retained, regardless of whether the authoriiation has been enacted. On the other hand, if the authorization request has been enacted and the appropriation request transmitted,-IEe transmittal code should be changed to "Supplemental under existing legislation" (transmittal code 1). Rescissions that were pending at the time of the February revised estimates and were later accepted by the Congress should now be merged .with other enacted. amounts. Those ,pending reseissions that were not accepted by the Congress should be deleted from the file. Any new "rescission ? pending" items should be,added. (3) Change.. in the budget estimates should be made in red by drawing -a single line through the earlier entry and legibly recording above it the current entry. (4) Enacted pay supplementals and their associated outlays should be merged into the pAppropriation" and "Outlays" entries (lines 40 or 43 and 90 of. the SSO, Section A). . (5) For accounts not 'currently. in the file, agencies will provide data through submission of an original -nd one copy of the SSD (S.F. 307-T) prepared in accordance with Tatructions contained in sections 41.1-41.4 of OMB Circular No. A-11, Revised. The first two amount columns will be left blank and the remaining columns headed "1977," and "1978" will be completed. b. Receipt account data file. This file is a computer listing.'of receipt data gialided in the February budget revisions. Accuracy of the data will be verified and the left margin, annotated in the same manner as for the SSD file (see paragraph 4a above). Revised amounts will be entered in red. ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R006200080002-6 lionrrange:7-projeCtiOns',. Thisc- ? the. Long- Range Data ane uoatle Eoznr,,,diSpIays' agency, bureau,, and. account tit resi with', lite: number's' identifying each account (See. Exhibit, ? 1)1.. The., rine- entries present account_ level detail. that:. was comRiled: earlier. this. spring for. internal Agencies- should; enter in- reaypn, this listing estimates or - reeStimatett-YCf-/.9..713.1*2277- 'rang-range projections' ? ' These ' projections. are: designee to-, indicate the degree to which:the President's 19-78 budget plans-- commit future f inancial. . resources:. These, estimates- and:. projections will be prepared in, accotdance with Attachment,A%. d. End of" year unexpended balances, file.- This fire it a, computer' listing containing estimates of unexpended balances of_ controllable, programs. reflected i'n' the January budget. Agencies. will revise the. amounts for. 19:78 and estimate: the: spendhut of .theset,halances in, future years.. in. accordance: with the) instructions in. Attachment: B. and in the. format. of: ? e. .Transmittal letter-. Agencies will submit an original and one copy of a transmittal letter. This letter will' include a brief explanatibm Off Major changes to the estimates of total budget authority; outlays, and receipts, and should identify. the addltion or deletion. of accounts from the long-range- projectiph, file, ; as. required- in Attachment- A. Agencies will include the: transmittal letter an Analysis,of Changes, tableiprePared, in the format of Exhibit 3. This table will provide, a- bridge from the february: -budget revisions t(:): the' April" estimates- and from the April ? estimates to the* current. estimates. ' The table will separately, identify. all, major,. revisionsj(in. excese of $50 ' . million) . 1Other smaller Changes. may be' cbinbinee in an "All othet, changes, net" entry, . , , 5.. Basis for the. revised, estimates... Amounts. for 1977- and' 197.8 will' be ? revited, to' reflect. changes due tb. reestimatet/ publicly-announced: Administration proposals, and' Congressional action or inaction-- . I . a., Reestimates?.. Agencies, shomjth remiew6 the. estimates. . and. make, adjustments. wbereA appfppr iatei. to. reflect:curtent spending trends, and other actions-, or events that affect th-e. estimates, The, new: estimates. sheiuld also teflect changes in economic assumptions since transmittal :of the prev.i6us.. ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 5 .estimates. 'Economic .assumptionstio'be used in preparing new estimates will be ptovided.by OMB.- ' b. Administrationv,initiatives. Estimates should be revised to.reflect cEinges due to: ..mc(1)-Uagetamendments ' and supplementalp , transMitted, YOr.,approved and pending in OMB (the final compilation of estimates will be 'adjusted by OMB to include only those items that have been approved by the President), (2) deferral or rescission proposals transmitted; (3) legislative proposals transmitted or publicly supported by the President that affect budget authority, outlays, or? receipts, and (4) other initiatives approved by the President. c. Congressional action or inaction. Revisions to the estimates should reflect cEanges due to Congressional action or inaction, including enacted appropriations, delayed enactment of proposed legislation, enacted authorizations, and action or inaction on deferrals and rescissions. The effect of reduction proposals by the Administration should be included as proposed unless delays in enactment require modification of the estimate or Congress has taken an action that clearly requires a revision. Revisions attributable to enactment of discretionary authorizatiohs for appropriation should reflect only the Amounts that have been specifically requested or approved by the President to be requested as appropriations. In preparing revised estimates for legislative proposals not yet enacted by the. Congress, agencies f should assume an effective date of October 1, 1977, Where an' earlier date had been assumed previously. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 6. Timing of submissions.. Agencies should submit two copies of each of the required materials to OMB no rater than June 10, 1977, Bert Lance Director Attachments Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ATTACHMENT A Bulletin No. 77-10 INSTRUCTIONS FOR THE PREPARATION OF LONG-RANGE PROJECTIONS General Instructions. 1. Projections will reflect the future budget authority, outlays and offsetting receipts implicit in the program levels, initiatives, and economy measures approved by the President. No discretionary changes are to be assumed in programs unless they are the result of specific public Presidential commitments. The projections should not anticipate future policy decisions. However, they should reflect any specific Presidential decisions made for the budget year that affect later years. 2. In general, amounts will not be included for anticipated price increases or future Federal pay raises. These amounts will be computed by OMB and included in an aggregate allowance. The exceptions to this general rule are: a. Beneficiary programs will reflect inflation adjustments requited by provisions of law: b. Where approval has been given to agencies by OMB for inclusion of anticipated future price increases for certain multi-year, fully funded major procurement or construction programs (e.g., the space shuttle,. nuclear reactors, and major weapons systems) and for RDT&E for major systems, such anticipated increases will be reflected in projections of budget authority and outlays in accordance' with the economic assumptions supplied by OMB. 3. In general, growth in agency workload will be assumed to be offset by productivity increases so that related employment will not increase. 4. On-going programs whose authority expires during the forecast period will be projected at the level of the program in the year prior to its expiration, unless there are specific policy determinations to the contrary. Programs that are clearly one-time or temporary, such as temporary study commissions, should be allowed to expire. 5. Projections for benefit payments: a. Uneuloyment insurance benefits. Estimates for these benefits shoulU be consistent with the aggregate unemployment rate assumptions supplied by OMB. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 b. Medicare and Medicaid. Projections for these programs shoula be base Z on 'HEW forecasts and the latest actual information available. Assumptions on medical care prices related to the Consumer Price Index, utilization rates, number of beneficiaries, etc., will be developed by the agency and OMB. c. Other benefit payments. (Including: OASDI; railroad retirement; Civil Service and military retirement; supplemental security income; and veterans compensation, pensions, and readjustment benefits). Benefit payments per beneficiary should be increased to take into account increases in the earnings base (where applicable) on which the benefit is computed, unless' existing law or Administration-supported legislation provides otherwise. The projections should be calculated by multiplying the expected number of beneficiaries in each future year by average benefit payments per beneficiary. For those programs for which existing or proposed legislation provides for automatic cost-of-living adjustments, the result should further be multiplied by a Consumer or other Price Index adjustment factor to be supplied by the Office of Management and Budget. Presidential proposals to increase or decrease such benefits should be shown separately. Epecific Instructions 1. Lines should .not be added to or d4leted from the computer listing. In cases where accounts Must be added or deleted to make the long-range computer data file consistent with the current master account title file, .the agency will include this information'fn.the transmittal letter described in paragraph (5)R .of this Bulletin.. The memorandum should include the account title, the 11-digit identification code, and the estimated budget authority and outlays for 1977 through 1982. 2. When entering amounts on the Long-Range.Data and Update Form:. a. If the dollar amount for any year is to be changed, enter the correct amount in the space immediately below that number on the line marked "CORRECTIONS" If no change is needed, leave the space blank on the line below the number; b. Show the amounts in thousands of dollars; Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part'- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 3 c. Specify the number of entries made on each "CORRECTIONS" line in the column titled "NUMBER OF CHANGES." Enter "0" if there are no changes. 3. The following regource measure abbreviations are used on the form: a. BA -- budget authority ":1 b. OUTLAYS -- outlays c. PROP LEG (BA) effect on budget authority of proposed legislation d. PROP LEG (0) -- effect on outlays of proposed legislation e. OFF REC offsetting receipts, either from intra- governmental transactions or proprietary receipts. f. PROP LEG (OR) -- effect of proposed legislation on offsetting receipts. 4. Proposed'lpgislaticn, as used here, means'"proposed for later transmittal, under proposed legislation..." Proposed legislation in the out-years should be treated in the same manner as in the budget year, i.e., the changes in budget authority and outlays-attributable to 'proposed legislation *should be ideptitied separately, in thq line(s) for proposed legislation in all of the affected' xears. For example, ? in Exhibit 1 (Operating Expenses) the changes caused by the proposed legislation are reflected only in lines 140800 and 141000. 5. Generally, offsetting receipts have been aggregated at' the agency level and split by subfunction .and controllability code. These codes appear directly to the right of the resource measure abbreviation (e.g., "OFF REC") on each line of the listing. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 LONG RANGE DATA ANO UPDATE PORN AS OF 03/16/77 17:43 RIERARED By: 6 NUmBER 1977 1978 1979 EX.FLA.4-?,-,-1111 OF CURRENT CURRENT CURRENT TELEM CHNGES ESTIMATE ESTIMATE ESTIMATE 1980 CURRENT ESTIMATE 1981 CURRENT ESTI4ATE C Exhibit 1 Bulletin No.77-10 1982 CURRENT ESTIMATE NOTE: IF ANY AMOUNT FIELD ON THIS PRINTOUT IS CORRECT AS SHORN, THEN LEAVE BLANK THE CORRESPONDING AMOUNT POSITION ON THE FOLLOW- ING DUPLICATE LINE LABELLED 4CURRECTIONS4.0THERWISE, THESE CORRECT AMOUNTS WILL BE RE-ENTERED NEEDLESSLY. IF ANY AMOUNT IS INCORRECT AS SHOWN, THEN ENTER THE CORRECT AMOUNT IN THE CORRESPONDING POSITION ON THE FOLLOWING DUPLICATE LINE LABELLED "CORRECTIONS". EACH AMOUNT FIELD IS PRECEDED BY A FIELD COOE(I.E.. 24,26.28,30,32,341.THESE CODES ARE FOR KEYPUNCHING PURPOSES (THEY 00 NOT REPRESENT BUDGET DATA AMOUNTS1,THEREFORE, PLEASE IGNORE THEM. COLUMN 6 SHOWS THE SUBFUNCTION CODE FOR EACH LINE ITEm. FOLLOWING IT IS THE CON- TROLLABILITY CODE. BE SURE TO INSERT AMOUNTS IN 110005 AND FILL IN YOUR NAME AND PHONE NUmBFII IN THE SPACE PROVIDED ABOVE.THANK YOU. OPERATING EXPENSES ( LATEST ESTIMATES 140700. BA 1406112651 CORRECTIONS F 140700 ? BA (406)12651 140800 PROP.LEG.BA1406112651 ' CORRECTIONS 140800 PROP.LEG.841406142651 LATEST ESTIMATES 140900 OUTLAYS (406112651 CORRECTIONS 140900 OUTLAYS 14061(265) 141000 PROP.LE0.0 1406112651 CORRECTIONS ( 141000 PROP.LEG.0 (4061(2651 TOTAL BA ( TOTAL PROP.LEG.BA TOTAL CUTLAYS TOTAL PROP.LEG.0 TOTAL BA1NET1 . TOTAL CHNET1 ACQUISITION, CONSTRUCTION, AND LATEST ESTIMATES . 141100 BA (406)12651 CORRECTIONS 141100 ' BA 140611265/ LATEST ESTIMATES ? . . (24) . t38400 126/ . . 875055 1281 902000 (301 925000 1321 950000 1341 4 1241 23200 (261 . in.5060(291 cloaca? (30) 920000 1321 14000(341 (24) 121/j -700 1281 1313/ (32) 1341 3 1241 1281 -600(281 - 600 (30) -600 132/ .-400 (341 (24) 83566 1261: 871755 1281 995000 1301 920000 132/ 945000 134/ 0 1241 (261 128) 1301 (321 (34) . - (24) (26) -700 (281 (30) 132) (34) 2. 1241 126) ' 128/ 130/ 1321 *- get (34) 838400 875055 902000 925000 9.50000 . -700 835600 871755 895000 920000 945000 -700 83g400 874355 902000 925000 950000 835600 871055 895000 920000 945000 ... . IMPROVEMENTS (241 236000 126/ 226600 1281 226000 1301 225000 1321 225000 1341 c) (241 126) . 1281 (301 (32) 134/ Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 975000 976000 ? 41.-- 465 970000 975000 970000 975000 970000 225000 . Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 0 ATTACHMENT B Bulletin No. 77,10 INSTRUCTIONS FOR REPORTING ESTIMATED SPENDOUT OF BALANCES OF CONTROLLABLE PROGRAMS 1. Purpose. This attachment provides instructions for Preparing the report on estimated spendout of 1978 balances bf controllable programs.. 2. CoveLue. This report will be prepared only by agencies that III-hive unexpended balances (the sum of obligated and unobligated balances) at the end of 1978 in excess of $100 million. Additional detail will be required for: a. bureaus with account balances at the end of 1978 of more than $1 billion; b. appropriation accounts Defense) with 1978 year-end million; (excepting the Department of balances of more than $100 c. accounts. with balances of standby authority, i.e._ authority that would not be meet conditions or circumstances that may not When the detail required by..2a-c does not, add total, an additional--".all other line will identify the remainder. and. back-up used except to occur. to the agency be provided. to 3. Re2ortin2 process. Affected agencies will be furnished a listing of accounts with unexpended balances of $20 million or more, together with information from the January budget data file on estimates of unexpended balances and spendout from balances for 1976, TQ, 1977, and 1978. (OMB did mot collect this information for the February budget revisions.) ? Agencies will report, in the format of Exhibit 2, the .,current estimates of: a. 1978 year-end unexpended balances for the accounts included on the listing furnished by OMB together with such additional entries necessary to effect Congressional action Or inaction or Administration initiatives. Current estimates of unexpended balances for other items may be furnished if deemed necessary; b. spending from those balances in fiscal years 1979, 1980, 1981, and 1982; Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 c. balances remaining as of September 30, 1982; and d. balances lapsing .during the period 1979 through 1982. These estimates will be consistent with estimates or reestimates provided in accordance with Section 5 of this Bulletin. 4. Basis for the estimates. The report will relate to "controllable" programs only (i.e., those shown in the attached computer listing). Programs classified as ' "open- ended programs and fixed costs" in Summary Table 16 of the 1978 Budget are specifically excluded; therefore the report will not contain all balances, and will not agree with the totals shown in Summary Table 10. For the purpose of this report, the term "spendout" means gross disbursements; it, is not synonymous with the term "outlays" which means checks issued, net of receipts and reimbursements. It is essential that the spendout report disregard receipts and reimbursements and record gross disbursements against unexpended balances'. This distinction is particularly important for revolving funds or accounts where reimbursements represent a major aspect of the financial program. In estimating the amount of spendout of 1978 balances in each of the fiscal years 1979-1082, the following assumptions should be used: a. Obligated balances carried forward at the end of 1978 generally :will be spent out in 1979. Important exceptions are accounts having a long time lag between obligation and disbursement, e.g., construction and major procurement programs. b. Unobligated balances will be obligated before new authority, and generally will be spent out within a year after the obligation is incurred, except as noted in. paragraph 4a above. Estimates of the spendout of these balances can usually be based on assumptions concerning obligation levels in 1979 and each year thereafter. Important exceptions include some "earmarked" funds (i.e., dedicated revenues), which will have to be reviewed separately, and accounts with balances of: (1) funds that will lapse; Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part-- Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 (2) receipts; or authority to spend agency or public debt (3) contract authority. S. Required information. Specific instructions foi completing the report are set forth below. Description (col. 1) -- This column should include the same stub entries contained in the computer listing provided by OMB, together with such additional entries as are deemed desirable. January Budget estimate (col. AI -- This column should contain the amounts provided in the computer listing. Current estimate (col. 3) -- The latest estimate of 1978 balances is equal to the January budget estimate modified to reflect subsequent changes due to congressional action (or inaction), reestimates, or Administration initiatives. These amounts must be consistent with the effects of any 1977 or 1978 reestimates reported elsewhere for the Mid- Session Review.. Assuming no changes in estimates of expiring authority and of receipts and reimbursements, changes in estimates of budget authority and outlays will have a direct sffec,t on the estimate of the unexpended balance (i.e., an inergaSi in budget authority will result in an equal increase in unexpended balances; while an increase in outlays will result In an equal decrease in unexpended balances). Spendout from 1978 balances in 1979-82 (cols. 4-7) -- Enter the amount of Spendout of 1978. year-end balances, estimated for each of the fiscal years 1979-1982. ? 1978 balances as of 9/30/82 (col. 8) -- The amount .of . 1978 balances remaining unexpended at the end of 1982 will include the balances of standby. and back-up authority that will not be used in the foreseeable future. Expiring balances will be excluded. Footnotes will be included to explain any balances in excess of $50 million, except for amounts applicable to standby or back-gp authority. 1978 balances expiring in the 1979-1982 period (col. 21 -- Enter the amount of 1978 balances that will expire unused in any of the fiscal years 1979-1982. Footnotes will be included to explain lany such balances over $50 million. The amount in column 3'should be equal to the sum of the amounts in columns 4-9. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Description (I) ESTIMATEDSPENDOUT OF BALANCES OF CONTROLLABLE PROGRAMS. FROM 1978 ENDOF-YEAR UNEXPENDED BALANCES OF BUDGET AUTHORITY 1978 ending balances January Budget Current estimate estimate (2) (3) (in millions of dollars) Spendout from 1978 balances in: 1979 1980 1981 1982 (4) (5) (6) (7) 1978 balances.as of 9/30/82 ? (8) Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Exhibit 2 Bulletin No. 77-10 1978 balances expiring in the. 1979-82 period (9) fl Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Department of Government Analysis of Changes (in millions of dollars) 1977 Budget Authority EXHIBIT Bulletin No. 77-10 1978 Budget Outlays Authority Outlays February budget estimate Effect of Administration revisions ?to proposed legislation 7,124 6,832 200 30, 7,512 7,410 150 Reestimate of outlays in con- struction accounts -75 45 ? April estimate 7,324 6,787 7,512 7,605 Congressional increase in Supple- mental Appropriations Act, 1977 120 80 40 Reestimate of offsetting receipts. -60 -60 35 35 All other changes, net . -17 Current estimate 7,384 6,790 7,547 7,680 Note: Changes identified in this exhibit are examples only. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 4? n Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ,?!!' 141?)P72-0:-It\ WA") OFFICE OF MANAGEMENT AND BUDGET WASHINGTON. D.C. 20509 Bulletin No. 77-9 April 19, 1977 TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Zero-Base Budgeting 1. Purpose. The President, in a memorandum of February 14, 1977 (Attachment), asked each agency head to develop a zero- base budgeting system to be used in the preparation of the 1979 Budget. In accordance with the President's direction, these instructions provide guidance on the use of zero-base budgeting techniques for the preparation and justification of 1979 budget requests within each agency. Separate instructions will be issued in OMB Circular No. A-11 to advise agencies of budget materials to be submitted 65 OMB. The instructions in this Bulletin lay the foundation for agency budget submissions in September in accordance with Circular No. A-11. 2. Coverage. These instructions apply to all agencies in the executive branch whose budgets are subject to Presidential review (see OMB Circular No. A-11, section 11.1). These concepts and guidelines are a framework within which each agency should develop necessary procedures to meet its individual requirements. Agencies should insure that the fundamental characteristics of zero-base budgeting are retained. Agencies excluded from the coverage of this bulletin are encouraged to develop zero-base budgeting procedures. 3. Definition of terms. a. Decision unit. The prograsa_sir_str.g_aniza.tiknal.p.t..ity for which budgets _are,p,rppared and for which a manager makes significant.decisions on the amount of spending and the scope or quality of work to be performed. b. Decision package. A brief justification document that includes the information necessary for managers to make judgments on program or activity levels and resource requirements. Es_aesies_91. cic?jsinn _packages_la. degi5j211 package spt) is prepaucl for_eaph idpcipion unit and Declassified in Part - Sanitized Copy Approved for Release 2013/97/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 cumulatively represents the total budget r.equest for _that unit. c. Consolidated decision packages. Packages prepared at higher management levels that summarize and supplement information contained in decision packages received from lower level units. Consolidated packages may reflect different priorities, including the addition of new programs or the abolition of existing ones. ? d. Ranking. The process by which managers array program or activity levels (as shown in decision packages) in decreasing order of priority. This ranking process identifies the relative priority assigned to each decision package increment contained in the manager's budget request based on the benefits to be gained at and the consequences of various spending levels. e. Minimum level. The program, activity, or funding level below which it is not feasible to continue the program, activity, or entity because no constructive contribution can be made toward fulfilling its objective. The minimum level: -- may not be a fully acceptable level from the program manager's perspective; and -- may not completely achieve the desired objectives of the decision unit. f. Current level. The level that would be reflected in the budget if fiscal year 1978 activities were carried on at 1978 service or other output levels without major policy changes. A concept, not unlike current services, that nevertheless permits internal realignments of activities within existing statutory authorization. Estimates of personnel compensation and other objects of expenditure will be made in accordance with OMB Circular No. A-11. 4. The zero-base budgeting concept. Zero-base budgeting is a management process that provides for systematic consideration of all programs and activities in conjunction with the formulation of budget _requests and program planning. The principal objectives of zero-base budgeting are to: -- involve managers at all levels in the budget process; Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 3 -- justify the resource requirements for existing activities as well as for new activities; -- focus the justification on the evaluation of discrete programs or activities of each decision unit; -- establish, for all managerial levels in an agency, objectives against which accomplishments can be identified and measured; -- assess alternative methods of accomplishing objectives; -- analyze the probable effects of different budget amounts or performance levels on the achievement of objectives; and -- provide a credible rationale for reallocating resources, especially from old activitites to new activites. To accomplish these objectives zero-base budgeting requires these decision-makers to: -- use "decision packages" as the major tool for 0 budgetary review, analysis, and decisionmaking; and -- rank program or activity levels in order of priority. 5. Benefits anticipated in the Federal Government. This new system can provide significant benefits at all levels throughout the Federal Government. These benefits include: -- focusing the budget process on a comprehensive analysis of objectives, and the development of plans to accomplish those objectives; -- providing better coordination of program and activity planning, evaluation, and budgeting; expanding lower level management participation in progam and activity planning, evaluation, and budgeting; -- causing managers at all levels to evaluate in detail the cost effectiveness of their operations and specific activities--both new and old-- all of which are clearly identified; Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 4 requiring that alternative ways to meet objectives are identified; identifying trade-offs between and within programs; and . -- providing managers at all levels with _better information on the relative priority associated with budget requests and decisions. Many agency management processes are aimed at providing some if not all of these same benefits. In many instances, however, such processes do not operate agencywide and the information relevant to the processes is not gathered, analyzed and reviewed in a systematic manner for all programs and activities. The value of zero-base budgeting is that it provides a process requiring systematic evaluation of the total budget request and all program objectives. 6. The zero-base budgeting process. Agencies should develop their internal zero-base budgeting procedures within the following framework. a. Identification of objectives. An important early step in zero-base budgeting is the identification of objectives for all managers preparing and reviewing decision packages. Top level agency management should be involved in setting objectives for lower level agency managers to: (1) help ensure that appropriate guidance is furnished to managers throughout the agency; (2) aid managers preparing decision packages in defining, explaining, and justifying their work to be performed and the associated resources; and (3) aid top and intermediate level managers in understanding and evaluating the budget requests. Program and organization objectives should be explicit statements of intended output, clearly related to the basic need for which the program or organization exists. The task of identifying objectives requires the participation by managers at all levels to determine the ultimate realistic outputs or accomplishments expected from a program or organization (major objectives) and the services or products 0 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassifiedi in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 a to be provided for a given level . of funding during the budget year (short-term objectives). However, lack of precise identification and quantification of such objectives does not preclude the develOPMent and implementation of iero-base budgeting procedures. As objectives are identified, managers should simultaneously determine the key indicators by which performance and results are to be meaSured. Agencies. should specify measures of effectiveness, efficiency, and workload for each decision unit. These measures can often be obtained from existing evaluation and workload measurement systems. If such systems do not exist, or if data are not readily available, desirable performance indicators should not be rejected because of apparent difficulties in measurement. Indirett or proxy indicators should be Considered initially, while evaluation and workload systems are developed to provide the necessary data for subaequent budget 'cycles. b. Identification of decision units. Another of the first steps in zero-base budgeting is the identification of the entities in the program or organization structure whose managers will prepare the initial decision packages. In all instances, the identification of the decision units should 0 be determined by the information needs of higher level management. Agencies should ensure that the basic decision units selected are not so low in the structure as to result in excessive paperwork and review. On the other hand, the units selected should not be so high as to mask important considerations and prevent meaningful review of the work being performed. In 'general, the decision unit ahould be at an organizational or orpgxam. -thiTman54ei -u-Lat-e-?qi.oL4,c.si,09,ns... nthonjtof ?.22pe, iilre,ieCatA._szi.J.,...q.C.q:L.kaLtV.,,o.f,,w_oci.c___..t9,..,.1?sc?pect.o,Frii0.- "A decis u ion 'nit noimalli Should be included within a single account, be classified in only one budget subfunction, and to the extent possible, reflect existing program and orgahizational structures that have accounting support. c. Preparation of decision packages. The decision Unit manager performs two types of analyses based on the program and budget guidance received from higher level management. First., the manager examines alternative ways .of accomplishing the major objectives. Such alternatives may require legislation and may have been identified and deve3oped as 4 result of a major reexaMination of the 0rogram or activity. In other instances the alternatives identified may not be fully developed, bilt Will'seive as-a Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 6 basis for reexamining the program at a later date. In still other instances, the alternatives identified may be the first steps toward more significant changes that will take longer than one year to accomplish. Normally, the hest alternative is then selected and used as the basis for the second 'type of analysia?the identification of different levels of funding, activity, or performance, The purpose of identifying these different levels is to provide information On:- (1) where reductions from the total request .may be made, (2) the increased benefits that can be achieved through additional or alternative spending plena, and. (3) the effect/ of such addition!: and reductions, . .Again, legislation may be reqUired te pUt.into.effect-SOMe level Of funding or performance. However, nothing in this process should inhibit or ?prohibit any decisionmaker from Submitting, requesting, or reviewing any informatioh needed for.anilypes and decitionmaking. For example, separate dedision package sets Maybe prepared to examine ? the impact of different. alternatives. Also, packages reflecting increased performance or funding .leveis may introduce. alternative methods of aCcOMPlishiienflhat were not feasible at a lower level. - The guidance received frbm higher level management may determine the specific service, performance, output,' or funding levels and the objectives to be discussed. This helps to. insure that information provided in the decision package is broken doWn and arrayed in a manner conducive to higher level review of issues concerning the decision unit and also covering More than .one decision unit. poweyei, in all instances the decision Package Set should include: (1) A minimum level. In all instances, the minimum level should be below the .current .level. (unless it- is. clearly not feasible to operate.boloW the cuirentleVel);:. and (2) A current level (unless the total requested for the decision Unit iS below the current level). The'decision package set may also include, when appropriate: (1) A level or levels .between the minituth and current leVels; and (2) Any additional increments desired above the current level. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 7 Proposed changeS (supplementals, amendments, rescissions) in current year amounts should be shown in packages separate from the packages described above. However, the above packages should include any budget year effect Of current year changes. New programs or activities (e.g., those resulting from new legislative authority or a new major objective) will be proposed in a separate decision package set. Proposals for abolition of current programs .or activities normally will not be reflected in a decision package set. ..however, such proposels.Should be highlighted, as appropriate, in another part of the agency juStification.. The decision unit manager prepares a decision package set that includes decision packages reflecting incremental levels of funding and performance, so the cumulative ameunt of all packages represents the total potential budget request of the decision unit. Each package shows the effect of that funding and performance level on .meeting the assigned objectives. The decision packages serve as the primary tool for budgetary review, analysisi: and detisionmaking, although additional Material may also be made available or requested for review. ? Generally, . a series of packages should be prepared for all programs and activities where, through legislative or administrative means, there is discretion as to the amount of funds to be. spent or the appropriate method or level of activity. This does not mean that where a spending level is mandatory under existing substantive law, only one level will be identified. There are many instances in? which the .decision On Whether to propose legislative changes is..made during the preparation. of the budget. There are 'also instances in which changes in regulations or program administration can affect the amount of resources needed to carry out a mandatory program. .In these inetances, packages :should be prepared that analyze the effects of different funding or performance levels or alternative methods :of accomplishing the objectives. In any instance where there is clearly no discretion in the amounts of funds to be spent or the appropriate method or level of. activity, at least one decision package should be prepared that summarizes the analysis and decisionmaking that resulted in that request. That decision package should support . the conclusion that only one funding or activity level can be coneidered:during the budget process. d. Ranking of.decision Reckages. .Completed decision packages should be ranked initially by the decision unit manager. At higher Management levels, the rankings of each Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 I Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 .8 ? subordinate manager are reviewed and formed into a consolidated ranking. This consolidation process is illustrated in Exhibit 1. The ranking shows the relative priority that discrete increments of services or other outputs have in relation to other increments-04.eervices or other outputs. The process is explicitly deeignedcto all-ow higher level managers the opportunity to bring their broader. perspectives to bear on program prioritiee by. allowing :Ahem to rank the decision packages*and.make programHtradeoffs. Agencies may bee whatever .review and ranking teChniques appropriate to their needs. However, the minimum level for a decision unit is always ranked higher than any increment for the same unit, since it represents the level bele/UT Which the activities can to longer be .conducted .effectiVely. However, the minimum level patXage for a_given decision link_ need not_bejanked.higher than_an.indremental.level ofeopp_ other decision unit. A minimum level for?a?decision unit 71-4,- be tanked so low in comparison to incremental levels of other decision.units that the funding level for the: agency may exclude that. mintmuth.level,package., This would eignify the loss of funding for that decision. unit; Decision packages or decision package sets may be. prepared to examine the effect of alternative ways to. meet an objective (see Section 6.c.). In these instances, only those decision packages that are. part of the.unit's'requeSt should be ranked. The other decision .packages should accompany the submission, however, so higher review.levels may examine the.alternatives and .have ?opportunity: replace .the requested.. packages with those representing an - . ? ? . alternative thus far not reaomMended. e. Eicher level review. In all instances, the use of decision--Flaages.ana70776r1,ty rankings are.the.major toole.. - for analysis, revieWi. and decisionmaking. At eadh. higtier, manageMent level: .deCisiOn.paCkages may be revised, deleted Or added; and -- rankings subMitted by subordinate 'Manager's may revised. ? (1) Collsolidation of deciscon. packages. In some small agencles:--r?may ?be desirable for each. higher menagament level to review every decision package .prepared: by each decioion unit i In other instances, .however, higher Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 9 level management's decisionmaking needs may better be met by recasting all or some of the initial decision packages into a lesser number of consolidated decision packages. The consolidated packages would be based upon the more detailed information in the initial packages, but the information would be recast or reinterpreted in a broader frame of reference to focus on significant program alternatives or iSsues. The objectives may be redefined to reflect the higher level manager's program perspective. This consolidation process may also be used to reduce what would otherwise be an excessive paperwork and review burden at higher levels. The agency head or his designee should determine at which review level(s) all or some of the packages will be consolidated into a lesser number of .packages before submission to the next higher review level (see Exhibit 1). This consolidation should be based on natural groupings of subordinate decision 'units. Decision units in different budget subfunctions generally should not be consolidated. The consolidated package will summarize the more detailed information contained in the individual packages and identify the subordinate decision units covered. In all instances a minimum level consolidated decision package will be prepared. This package may or may not include each of the minimum level packages from the decision package sets being consolidated. There will be instances when the preparation of a current level consolidated package is not feasible (e.g., when a decision package for a new program or activity is ranked higher than a current level package). When appropriate, there should also be a level or levels identified between the minimum and current levels. (2) Type of review. The review can be conducted more effectively at each management level if the type of review is determined beforehand. This is especially important in the mid and higher levels in the agency, where the review workload may be significant, even with consolidation of packages. As a means of increasing the effectiveness of its review, higher level management may decide to limit its review of the higher-ranked packages to that necessary to provide a sound basis for ranking the packages . and may choose to examine in more depth only the lower-ranked packages. The lower-ranked packages would be the first to be affected by an increase or decrease in the expected budgetary resources. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 10 0 7. Preparation of materials. The following materials should be prepared for each decision unit. a. Decision unit overview. The overview provides information necessary to evaluate and make decisions on each of the decision packages, without the need to repeat that information in each package. It should be at most two pages long, prepared in the format of Exhibit 2, and contain the following information: (1) Identifying information. Include sufficient information to identify the decision unit, and the organizational and budgetary structure within which that decision unit is located. Each package should include the title of the appropriation or fund account that finances the decision unit, the account identification code (see OMB Circular No. A-11, section 21.3), and any internal agency code necessary. (2) Long-range goal. When appropriate, identify the long-range goal of the decision unit. Goals should be directed toward general needs, to serve as the basis for determining the major objective(s) undertaken to work towards that goal. (3) Major objective(s). Describe the major objectives of the decision unit, the requirements these objectives are intended to satisfy and the basic authorizing legislation. Major objectives normally are of a continuing nature or take relatively long periods to accomplish. Objectives should be measurable and should be those that program managers employ; they should form the basis for first determining and subsequently evaluating the accomplishments of programs or activities. (4) Alternatives. Describe the feasible alternative ways to accomplish the major objectives. Identify which of the alternatives represents the method proposed for the budget year. Briefly explain how the approach selected contributes to satisfying the major objectives and the rationale for not pursuing other alternatives. This may include a discussion of organizational structure and delivery systems; longer-range cost factors; and when applicable, the unique aspects and need for the program that cannot be filled by State or local governments or the private sector (particularly for any enlarged or new proposed action). Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ? 11 (5) Accomplishments. Describe the progress of the decision unit toward meeting the major objectives. This section should include both quantitative and qualitative measures of results. b. Decision packages. Each (consolidated) decision package should be no more than two pages long, be prepared in a format similar to Exhibit 3, and contain at least the following information: (1) Identifying information. This information should include organizational identification (aqencY, bureau), appropriation or fund account title and identification number, specific identification of the decision unit, the package number, and the internal agency code. (2) Activity description. Describe the work to be performed or services provided with the incremental resources specified in the package. This section should include a discussion and evaluation of significant accomplishments planned and the results of benefit/cost and other analyses and evaluations-MT-7pin contribute to the justification of that level. (3) Resource requirements. Include appropriate information, ---itraes oftigations, offsetting collections, budget authority or outlays, and employment (full-time permanent and total), for the past, current, and budget years for the upcoming budget. The increment associated with each package should be listed, along with the cumulative totals for each measure used in that package, plus all higher ranked packages for that decision unit. At an appropriate level in the process, budget authority. .and, outlay amounts for the four years beyond the budget year' should also be included, in accordance with criteria in OMB Circular No. A-11. (4) Short-term objective. State the short-term objectives (iFigr17,---aschievable within one year), that will be accomplished and the benefits that will result with the increment specified and the cumulative resources shown in the package. The expected results of the work performed or services provided should be identified to the maximum extent possible through the use of quantitative measures. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 In ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 (5) Impact on malor objective(s). Describe the impact on the major objective(s) or goals of both the incremental and the cumulative resources shown in the package. (6) Other information. Include other information that aids in evaluating the decision package. This should include: ?. -- explanations of any legislation needed. inconnection with the package; -- the impact or consequences of not approving the package; -- for the minimum level package, the effects of' zero- funding for the decision unit; -- for packages below the current level, an explanation of what now is being accomplished that will not be accomplished at the lower level; and -- the relationship of the decision unit to other decision units, including the coordination that is reauired. c. Ranking sheet. Each review level will prepare a ranking sheet to submit to the next higher review level. This ranking sheet should generally contain the information shown in Exhibit 4 for the budget year. In instances (e.g., revolving funds) where budget authority and net outlays are not a factor in reqecting the appropriate or priority level of performance, managers should use other measures (e.g. total obligations, employment). 'B. OMB review and consultation. As an important element of initiating zero-base budgeting, agencies are required this year to submit for OMB and Presidential review their proposals for: -- the program, activity, or organizational level to be the basis of the (consolidated) decision packages that will form the agency budget submission to OMB; .current and/or budget year issues that should be highliOted through either particular decision packages or, when decision packages are not appropriate, through issue Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 13 papers that ultimately tie in to one or several decision packages; and -- longer-range issues for which agencies will initiate extensive evaluations. This identification of issues will play an integral role in OMB's spring review of agency programs, activities, and plans. Policy guidance letters to the agencies regarding the preparation of the fall budget submission will be based in part on this information. OmB representatives will contact the agencies shortly and request these proposals. 9. Inquiries. Shoulo additional discussion be necessary, agencies should contact their OMB budget examiner. Bert Lance Director Attachment Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 DECISION PACKAGE RANKING AND CONSOLIDATION PROCESS ILLUSTRATED Managers A, B. and C each rank packages for their units and send to Manager X Decision Unit A Decision Unit B Decision Unit C Package Funding Funding 4 increment Total Manager N receives parkag.,s and evaluates and ranks them within each unit Revised Package Funding Funding increment total 1/ Manager X ranks packages for units A, B, and C against each other, and sends to Manager R ilanager X Al 100 led A2 5 105 A3 30 135 A4 15 150 Manager R evaluates packages from Managers X and Y, and then ranks them against each other B4 ?35 ?-- Cl C2 C3 C4 C5 C6 C3 C4 C5 Manager Y 1 X1 2 X2 3 11 4 Y2 5 13 6 14 7 15 9 y7 10 x3 12 X5 13 ?X6 14_ X7 15 X8 16 19 17 Y8 18 19 20 XII 21 X12 22 X13 2 ? EXHIBIT 1 BULLETIN NO. 77-9 Manager R prepares some consolidated decision pack- ages before submitting budget request to next higher level RI xI-x2 Yl-y2 R2 _1 Y3-Y7 R3 X3-x9 ? - R4 Y8-Y9 R5 X10 R6 X11-X14 1./ Higher level manager reorders the proposed priorities flf the subordinate decision unit managers. The packages may be revised by either the initial decision unit manager or the higher level manager. 2i Higher level manager accepts proposed priorities of the subordinate manager. 2/ Higher level manager accepts proposed priorities of the subordinate manager, but chooses not to propose funding of lowest priority package. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CR-RDP06M00944R000200080002-6 Naair DECISION UNIT OVERVIEW Department of Health, Education, and Welfare Mental qealth Administration Federal Support of Community Mental Health Services. Mental Health: 75-0001-0-1-550 Goal. Bulletin No. 77-9 Exhibit 2 To ensure needy citizens access to community based mental health services, regardless of ability to pay. Services should be of high quality, provided in the least restrictive environment, and in a manner assuring patients' rights and dignity. Major objective. To assist in the establishment and operation of a nationwide network of 1,200 qualified community mental health centers (CMHCs) by 1984 to ensure availability and accessibility of services to residents of each mental health catchment area. Current method of accomplishing the major objectives. Grants are made to public and nonprofit entities to plan and operate community mental health center programs. The planning grants are one-time grants, not to exceed $75,000 eacn. The operating grants are for eight-year periods with a declining Federal matching rate. Alternatives. . . . 1. consolidate Federal funding for commtmity mental health services and other categorical healfn service programs into a single formula grant to the States. 2. Consoliaate Federal funding for community mental health services and other community- cased inpatient and outpatient services--as well as institutionally basea short-term acute and long-term care services--for the mentally ill and mentally retarded. These alternatives are not being pursued because the States thus far have not been able to ensure that funds will be targeted into high priority areas. The Secretary believes the Federal Government must have the ability to control the funding. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 3. Provide for mental health services coverage through the national health insurance proposal. This alternative is not presently viable because passage of the national health insurance act is not near. Intensive study is now being directed toward this alternative for possible consideration next year. Accomplishments. Since the establishment of the CMHC program in the mid-1960's, 670 CMHC's have received Federal funding of nearly $2.0 billion. In 1977, nearly 600 centers were operational, covering 45% of the population (90 million people), and providing treatment services to 2 million individuals annually. .% In 1977, 450 centers received Federal grant support and 100 centers completed the eight- year Federal grant cycle. To qualify for an operational grant, P.L. 100-63, requires centers to provide the following services on a 24 hour a day, seven day a week basis: 1. Inpatient hospitalization; 2. Outpatient treatment and counseling; 3. Partial hospitalization as an alternative to full-time hospitalization; 4. 24-hour emergency services by telephone or on a walk-in basis; 5. Consultation and education services; 6. Services to children; 7. Services to the elderly; 8. Screening services to the courts and other agencies; 9. Follow-up care for former full-time patients from a mental health facility; 10. Transitional services for same; 11. Alcoholism and alcohol abuse program and drug addiction and abuse program. o 0 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: Ca-RDP06M00944R000200080002-6 ,har. Package 1 of 4 (minimum level) DECISION PACKAGE Department of Health, Education and Welfare Mental Health Administration Federal Support of 'ommunity Mental He.lth Servt es Mental Health: 75-0001-0-1-550 Bulletin No. 77-9 Exhibit 3 Activity Description: Continue grants only the 4,0 i:0111C's currently receiving Federal support, until each CMHe's eight-year grant cycle is completed. Resource Requirements: Dollars (in thousands) 1971 1978 1979 This Package Cumulative Total Planning grants (4) 1,000 1,000 0 . 0 Operating grants ($) 97,000 147,000 120,000 120,000 Total obligations 98,000 148,000 120,000 120 000 ---1 Budget authority 98,000148,000 120,000 124,000 Outlays 97,000 145,000 119_,Gou 119,00y Five-year estimates ? 1979 1980 1981 1982 1983 'Budget authority 1207000 10U76-60 -10-,000 -3-6,000 40,000 Outlays 119,000 98,000 79,000 59,000 40,000 Short-term objective: To ensure in 1979 access to qualified comprehensive mental health services to 458 of the population (this results in treatment of about 2 million patients). Impact on major objectives: The :neje: objective of 1200 qualified CMFIC's by 1988 would not be met if this short term objective were continued. It is unlikely that any net increase in qualified CMHC's would result at this level oecause few communities have the resoutnes to develop a qualified program. It is estimated that for each community that would develop a qualified CMHC; an ct.sting qualifieo CMHC would cease to qualify because of cutbacks in service provided due to tight funds. The impact ol continuing this level objective follows: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 1977 1978 1979 1980 1981 1982 1983 1984 Number of public and non- profit CMHC's 700 710 720 730 740 750 760 770 Number of CMHC's providing comprehensive services, as now defined 550 600 600 ? 600 600 600 600 600 Number of CMHC's receiving grants 400 450 400 350 300 250 200 150 Percent of population covered 43 45 45 45 45 45 45 45 Percent of probable patients covered 45 50 50 50 50 50 50 50 Other Information: Continuing grants to the 450 CMHC's currently receiving Federal support until is the minimum level because (a) the government has an eight-year contract receive any grants. If zero-funded, the government would be subject to legal each CMHC's eight-year cycle is completed with each CHMC, and (b) no new CMHC's will action brought by CMHC's. This level would cease to encourage communities to develop CMHC's because of the (a) lack of planning grant funds and (b) lack of operational grant funds, thus negating the potential growth in the number of qualified CMHC's. Only 57% of the high priority catchment areas would receive qualified CMHC coverage. 0 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA--RDP06M00944R000200080002-6 Bulletin No. 77-9 Exhibit 3 Package 2 of 4 DECISION'PACSAGE Department of Health, Eoucation, and Welfare Mental Health Administration Federal Support of Community Mental Health Services Mental Health: 75-0001-0-1-550 Activity Description Continue grants to a total of 450 C.vntly funded CMHC reaches the end of its eight-year cycle for eligibility, provide an eight-year grant to a newly aualified CMHC. Resource Reguirements: Dollars in thousands. 1977 1978 1979 . This Cumulative Package Total- ..- Planning grants (8) 1,000 1,000 0 0 Operating grants (8) 97;000 147;000 .20;000 140;000 Total obligations 31-70, 148;000 .20;000 140;000 Budget authority 98,000 000 .20000 140,000 Out lays ' ? 97,000 145.000 19.000 138.000 Five year estimates 1975 1980 1981 1982 1983 Budget authority 14E00 141700 1437000 145700 14C-0-60 Outlays . 138,000 141,000 142,000 144,000 145,000 Short-term objective. To ensure in 1979 access to Qualified comprehensive mental health services to 49% of the pooulation (this results in treatment of about 2.1 million patients). ImIEL on major objectives. Even without the planning grants, many communities will be encouraged to develop CMHCs because of the possibility of receiving the operating grants. However, the major objective would not be met at this level of funding. It would take until about 1990 to establish 1200 gualified CMHCs. The impact of continuing this level follows: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 This 1979 1977 1978 package cumulative 1980 1981 1982 1983 1984 Number of public and nonprofit CMHCs 700 710 40 750 800 850 900 950 1,000 Number of CMHCs providing comprehensive services, as now defined 550 600 50 650 700 750 800 850 900 Number of CMHCs re- ceiving grants 400 450 50 450 450 450 450 450 450 Percent of population covered 43 45 4 49 58 65 75 80 85 Percent of probable patients covered 45 50 4 54 64 69 80 84 88 2 Other information. By 1982, 70% of thle high priority catchment areas will have a qualified CMHC. Assuming the objective of CMHCs is desirable even by 1990, stretching out the program past the major objective date of 1984 will increase total program costs from $3.6 billion to $4.3 billion due to estimated increases in service costs. 0 0 Declassified in Part- Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: Ca-RDP06M00944R000200080002-6 Nriv , . Package 3 of 4.(Current level) . DECISION PACKAGE Department of Health, Eduction, and Welfare Mental Health Administration Federal Support of Community Mental Health Services Mental Health: 75-0001-0-1-550 0 Bulletin No. 77-9 Exhibit 3 Activity Description: Fund 501 more newly qualifying CMHO's. That is, for every two.CMHC's whose eight-year eligibility period ends, fund three newly qualifying CMHC's. nesource Requirements: (Dollars in-thousands) 1977 - 1978 Planning grants (S) 1,000 1,000 Operating grants (5) 97,000 147,000 Total obligations 98,000 146,000 ? Budget authority 98,000 148,000 Outlays 97,000 145,000 . - -C.- Five year estimates 1979 1980 1981... --1982 Budget-authority 150,000 172,000 187750 Outlays I. . . - ,162,000. 148,000 .161,000 -. ? . . 171,000.7 -.182,000.. . . Short-term Objective: To ensure in 1979 access treatement of about 2.2 million Impact on Malor Objectives: to qualified comprehehsive mental patients). this ' 1977 ? 1978 '. ' Pkg. Number of public and non- profit CMHO's 700 710 25 Number of CHHC's providing comprehensive services, as now defined 550 600 25 Number of CMHE's receiving grants 400 ' 450, ? 25 Percent of population covered . 43 45 . ? Percent of probable patients covered 45 50 1979 This Package Cumulative .Total 0 0 10,000 ___ 150,000 10,000 150,000 10,000 150,000 10,000 148,000 -1983 .194,000 , ' 193;000 health services to 5111 of the population (this results in - 1979 Cum. ? .'1980: 1981 1982 1983 1984 775 850 925 1,000 1,075 1,150 675 750 825 900 975 1,050 475 . 500?. . 525 550 571: 600 65 75 60 85 90 ' 56 66 77 83 87 90 Other information: By 1982 958 of the high priority catchment areas will have a qualified CMHC. If stretched out from.1984to 1986, Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ,3.8 billion. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Package 4 of 4 DECISION PACKAGE Department of Health, Education, and Welfare Mental Health Administration Activity Description: Federal Support of Community Mental Health Services Mental Health: 75-0001-0-1-550 For every CHMC whose eight year eligibility periods ends, fund two newly qualifying CMHC's. Resource Requirements: Dollars in thousands 1977 1978 1979 -- 72-Eig Cumulative Package Total Planning grants ($) 1,000 1,000 0 0 Operating grants ($) 97,000 147,000 10,000 160,000 Total obligations 98,000 148,000 10,000 160,000 Budget authority 98,000 148,000 10,000 160,000 Outlays 97,000 145,000 10,000 _158,000 Five year estimates 1979 1980 1981 1982 1983 Budget authority 160,000 172,000 183,000 193,000 204,000 Outlays 158,000 170,000 182,000 192,000 203,000 Short-term Objectives To ensure in 1979 access to qualified comprehensive mental health services to 53% of the population (this results in treatment of about 2.3 million patients). . Impact on Major Objectives Number of public and non- profit CMHC's Number of CHMC;s providing comprehensive services, as now defined Number of CMHC's receiving grants Percent of population covered - Percent of probable patients covered Bulletin No. 77-9 Exhibit 3 this 1979 1977 1978 pkg. cum. 1980 1981 1982 1983 1984 700 710 25 800 900 1,000 1,100 1,200 1,300 550 600 25 400 450 25 .43 45 2 45 50 2 700 800 900 1,000 1,100 1,200 500 550 600 650 700 750 53 75 80 84 93 100 58 77 82 85 93 100 The major objective will be net at this level of funding. Other Informaion (Dv 1982 100% of the high* priority catchment areas will haCti qualified CMHC. Total program cost by 1984 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 BULLETIN NO. 77-9 EXHIBIT 4 RANKING SHEET (Other identifying information) Rank Decision Package Department of Government Fiscal year 1979 BA Outlays Date: Cumulative July 17. 1977 BA Outlays 1 Al 924 901 924 901 2 81 800 785 1,724 1,686 3 A2 121 121 1,845 1,807 4 C1 0 0 1,845 1,807 5 82 30 30 1,875 1,837 6 A3 0 0 1,875 1,837 7 83 30 30 1,905 1,867 8 C2 0 0 1,905 1,867 9 C3 0 0 1,905 1,867 10 A4 22 22 1,927 1,889 11 84 11 11 1,938 1,900 12 C4 0 0 1,938 1,900 13 B5 30 30 1,968 1,930 14 C5 0 0 1,968 1,930 15 C6 0 0 1,968 1,930 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 . . Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ATTACHMENT BULLETIN NO. 77-9 THE WHITE HOUSE WASHINGTON February 14, 1977 MEMORANDUM FOR THE HEADS CF EXECUTIVE DEPARTMENTS AND AGENCIES During the campaign, I pledged that immediately after the inauguration I would issue an order establishing zero-base budgeting throughout the Federal Government. This pledge was made because of the success of the zero-base budget system adopted by the State of Georgia under my direction as Governor. A zero-base budgeting system permits a detailed analysis (7.) and justification of budget requests by an evaluation of the importance of each operation performed. An effective zero-base budgeting system will benefit the Federal Government in several ways. It will Focus the budget process on,a comprehensive analysis of objectives and needs. Combine Planning and budgeting into a single process. Cause managers to evaluate in detail the cost- effectiveness of their operations. Expand management participation in planning and budgeting at all levels of the Federal Government. The Director of the Office of Management and Budget will review the Federal budget process for the preparation, analysis', and justification of budget estimates and will revise those procedures to incorporate the appropriate techniques of the zero-base budgeting system. He will develop a plan for applying the zero-base budgeting con- cept to preparation, analysis, and justifications of the budget estimates of each department and agency of the Executive Branch. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ? : Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 a ask each of you to 'develop a zero-base system within your agency in accordance with instructions to be issued by the Office of -Management and Budget. The Fiscal Year 1979 budget will be prepared using this system. By working together under a zero-base budgeting system, we can reduce costs and make the Federal Government more efficient and effective. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 OMB BULLETIN NO. 77-8 Declassified in Part- Sanitized Copy Approved for Release 2013107117: CIA-RDP06M00944R000200080002-6 4 apil..L 17 / / Copies sent to AO/DC1-& OGC Library 0/Compt has action - Suspense date: 25 Apr 77 (-& ss Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 EXECUTIVE OFFICE OF THE PRESIDENT- OFFICE OF MANAGEMENT AND BUDGET WASHINGTON, D.C. 20503 BULLETIN NO. 77-8 April 4, 1977 TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS ! SUBJECT: Resources for Program Evaluation in Fiscal Year 1977 1 ? 1. Purpose. This Bulletin provides instructions for the submission of information concerning the resources for program evaluation provided for in fiscal year 1977. 2. Background. The Office of Management and Budget has determined the need to collect and analyze information on the level of Federal expenditures and staffing devoted to program evaluation activities. The information requested by this Bulletin is vital to an understanding of the magnitude of evaluation resources and the ways in which these resources contribute to the achievement of national goals, agency missions, and program objectives. Moreover, increasing concern about the adequacy of data on program performance makes it necessary to assure that accurate information can ? be provided to the Congress and the public on the actual level of program evaluation expenditures. 3, Coverage. These-instructions apply to each executive department and independent agency with more than 800 authorized full-time permanent employees. 4.' Definition. For purposes of. this Bulletin, program evaluation means the formal assessment, through objective measurements and systematic analyses, of the manner and ? extent to which Federal programs (or their components) have achieved or are achieving their objectives, or are producing other significant effects of either a desirable or undesirable character, in order to assist future policy and management decisions. a.The following will be considered as Federal program evaluation activities for the purpose of this Bulletin: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ????'.? (1) Formal. studies.. surveys, and, data. analyses for the purpose of determining the effectivenesd., efficiency, or impact. of a national. or regional program. (2) Systematic assessment of demonstration programs. or projects which are expected to have-major implication' for programs of national or. regional scope; except -that. evaluation activities which, ere an intrinsic part of the program operations or management should not be reported.. (31 Formal studies, surveys., and data analyses .-for the purpose y)f assessing program managebent ',processes, procedures, intervention techniques, workload distribution, or productivity. . (4) Assessment and development of ,program designS to , assure that programs, once operational, can. be sucCessfully evaluated. (5) Design, development, and field testing of new? program evaluation methodologies, (6) Synthesis ?and further analysis of :results obtained by several previous program evaluation effOrtd. (7) Collection of. initial data . to help in evaluation deSign and provide a baseline for subsequent. ? evaluations. b. The following will not be considered, aS program: evaluation Activities for the purposes of this Bulletin. (1) Design, development, and Operation of 'Oheral. data. systems or management information systems. ? (2) Continuing collection of routine data an general purpose statistics. 1 . (3) Analysis of existing or proposed policies where no programs yet exist (even though authorized) for purposes of :appraising the likely costs and effects of feasible: alternatives. Although such analyses are often called "evaluations," they are prospective in character; whereas program evaluation is retrospective,. aimed at detetmining what has actually occurred as the result of past program actions. .(4) Basic research and itudies'intended to ihcrease or. foster general knowledge. development, but which are not Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 expected to be used specifically and primarily in policy and management decisions. (5) Routine, day-to-day .monitoring of program operations which is an intrinsic part of program administration. c. It is recognized that the present extensive variation among Federal Agencies and programs will require case-by-case judgments to determine the applicability of the above ctiteria to agency "evaluation" activities. S. Reporting Requirements. Departments and agencies should submit a report in accordance with the attached instructions and exhibit to OMB, attention: Evaluation and Program ? -Implementation Division by April 25, 1977. This is a one- time report. 6. Rescission. This Bulletin is rescinded following receipt of the April 25, 1977 report. 7. Inquiries. Inquiries and requests for assistance should be directed to the 'Evaluation and Program Implementation Division, Office of Management and Budget. (395-4726 or 395-56420 Bert Lance Director, Attachment Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ,7p ATTACHMENT Bulletin No. 77.-8 INSTRUCTIONS. An original arid one copy of the report on program evaluation resources will be prepared on letter size sheets (8x10-1/2) and submitted in .the format of the attached exhibit, as prescribed below. ? Date - Enter the date of preparation Contact - Enter the name and telephone number of an individual who can respond to questions relative to the information provided. Part I. RESOURCES SCHEDULE: Department/Agency/Bureau - Enter the reporting department or independent agency. In the case of cabinet departments, enter each bureau or comparable organizational unit for which separate evaluation resources (funds and personnel) can be identified, a consolidated line entry for any other organizational units (if applicable), and a line .entry for the total department or agency. At least one Spade should be left between each line entry. Staff years - Enter the estimated staff-years for full-time permanent personnel who devote more than fifty percent of their time to the program evaluation activities outlined in paragraph 4a of this Bulletin. This includes full-time government personnel engaged in monitoring or directing such activities by contrabtors or grantees. Salaries - Enter the 'estimated obligations for personnel compensation related to the staff-year entry. Personnel Benefits - Enter the estimated obligations for personnel benefits associated with the salary figure. Contracts/Grants - Enter the estimated obligations to be incurred for evaluation contracts or grants, or, in the case of multi-purpose agreements, the obligations for those portions of the contracts or. grantS that are directly related to the program evaluation activities described in paragraph 4a of this Bulletin. Other Expenses - Enter the total obligations estimated for other administrative .expenses directly. related to the performance, coMmissiOning, or oversightof the activities Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17-: CIA-RDP06M00944R000200080002-6 2 described in paragraph 4a of this, Bulletin. "Other expenses" 'would include obligations for travel .and transportation of ,persons, transportation of things, rent, communications ,and utilities, printing .and reproduction,, other services (such as ADP services), supplies ..and materials,, and equipment. :Significant :obligations for any fit these "other ekpenseS" ahould'be briefly identified in the narrative. Total - Enter the total estimated-FY 1977 obligations for salaries,.personnel benefits, contracts/grants, and other expenses. Note: All obligations are to be entered.in thoUsefids Of ' Part II. NARRATIVE STATEMENT A.brief explanatory statement should describe in general terms the program evaluation activities being undertaken and the objectives toward which they are directed. It should highlight significant, increases or 'decreases in funding levels from the current fiscal year to FY 1978 and major policy..or.strategy changes .expected to occur. Emphasis should be ,placed on the expected use of evaluation information in the agency resource allocation and other decision processes. In most instances, the narrative for individual bureaus should,. be restricted to two or three paragraphs and the departmental Or agency summary.' should not. exceed ,two pages. Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 e% ? fl Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 ei50 EXHIBIT Bulletin No. 77-8 Date: Contact: REPORT ON FY 1177 PROGRAM EVALUATION RESOURCES (Dollars in Thousands) Part I. RESOURCE SCHEDULE Personnel Contracts Other Staff Years Salaries Benefits Grants Expenses TOTAL Department/Agency/Bureau- (FTP) ($) ($) ($) ($) ($) Department of Government (Report breakdown of major bureau or other organiza- tional unit for cabinet departments only) PART II. NARRATIVE STATEMENT Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 OMB BULLETIN NO. 77-7 Declassified in Part- Sanitized Copy Approved for Release ?p1310.71)T : CIA-RDP06M00944R000200080002-6 e:41 Copies sent to AO/DCI and OGC Library 0/Compt responded to D/DCl/IC II March 77 Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 - Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 . - - EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON. D.C. 20503 BULLETIN NO. 77-7 March 3, 1977 TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Limitation on hiring and revision of employment ceilings 1. Purpose. This Bulletin provides guidance with respect to the limitation on hiring ordered by the President in his memorandum of March 1, 1977. This guidance is isslied pending estaulishment of new employment ceilings for full- time permanent and total Federal civilian employment for fiscal years 1977 and 1978. It also provides instructions for appeals in a limited number of situations where exceptions to the hiring limitation may be granted. 2. Background. In a recent fireside talk to the American people, President Carter reaffirmed his Administration's commitment to reform and reorganize the Federal Government and to bring its growth .under control. As part of this effort, he promised to put a ceiling on the number of Federal employees. In his memorandum of March 1, the President stated that, preparatory to establishing new employment ceilings, a thorough evaluation of personnel requirements would be made to, determine the lowest number needed to operate the Government effectively. In the interim, the President has ordered that a limitation on hiring be imposed so as to maximize this Administration's flexibility in meeting personnel requirements within the new ceilings. This procedure accepts the consensus of the advice submitted. by the Cabinet in response to the President's February 11 request for views on alternative employment control systems. 3. Limitation on hiring. Pursuant to the President's memorandum, each agency will establish controls to limit the number of appointments to full-time permanent positions to not more than 75 percent of the number of its vacancies occurring after February 28, 1977 (i.e., agency full-time permanent hiring is restricted to on board strength as ? of Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 Feoruary 26, 1977, less 25% of vacancies occurring thereafter). ? Except for the exemptions listed oelow, this limitation applies to all new hires of Federal civilian personnel and to transfers of personnel Petween Executive Branch agencies. The limitation is effective immediately and will remain in effect until new employment ceilings have been established for fiscal years 1977 and 1978. Where necessary, personnel reallocations . should be made within agencies to meet needs of highest priority and to assure that vital and basic services are not interrupted. Contracting with firms and institutions outside the Government will not be used to alleviate the effect of this limitation. Nor will persons be hired on a part-time or temporary basis as a substitute for full-time permanent employees. 4. Standard exemptions. To preserve the continuity of Government, the following exemptions to the limitation on hiring are permitted: a. at the discretion of the agency head, hiring necessitated by emergency situations involving the safety of human life and protection of property, b. Hfilling of positions under programs that are presently exempt from employment ceilings, c. hiring for position's required to be filled under specific provisions explicitly stated in law (This does not include interpretations of laws, e.g., appropriation acts, tnat do not contain requirements for speCific employment levels.), d. hiring in accordance with firm commitments made in writing by agency personnel officers, prior to the effective date of the limitation, e. hiring by the U.S. Postal Service, f. reassignments of personnel within an agency, g- executive level appointments, h. appointments to positiods of a. confidential or policy-making character (established under Schedule "C" or as "noncareer executives" by the Civil Service Commission). Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 3 i. shifting of. employees from one agency to another because of a transfer of functions resulting from Presidential reorganization action, andi j. hiring of employees who receive no compensation (if otherwise permitted_idglaw). 5. Appeal of hiring limitation. In a very limited number of cases, additional exemptions may be granted if the Office of Management and Budget (OMB) determines that such action is necessary to preserve the continuity of Government by assuring that essential services are provided and that fundamental needs are met. When an agency head believes that circumstances in an agency warrant such an exception, an appeal may be made in writing to the Director of the OMB fully justifying the need for additional personnel and explaining why intra-agency reallocationtis not feasible. 6. Revision of employment ceilings. As is noted above, in his March V memorandum, President Carter stated that existing employment ceilings for 1977 and 1978 will be re- evaluated to determine the lowest number needed to operate the Government efficiently and effectively. OMB will undertake this re-evaluation jointly ;with the agencies. Informal discussions between OMB and the agencies will be initiated as soon at possible. It is anticipated that this review will be completed and that agencies will be advised of their new ceiling's by early April: At that time, the Government-wide limitation on hiring will be withdrawn. To ensure compliance with the new ceilings and to permit some flexibility in seasonal hiring, agencies will develop target levels for full-time permanent and total employment as of June 30, 1977 and March 31, 1978. These targets will be submitted to OMB no later than Friday,' April 22, 1977. Once agreed upon, they will be treated as employment ceilings against which agency efforts to'reach the new year- end ceilings will be measured. Any reductions in current employment levels will be achieved through attrition. Thus, some agencies may have to continue to curtail hiring once the Government-wide limitation has been withdrawn in order to comply with new employment ceilings. 1 7. Effective dates. The instructions in this Bulletin are effective at once and will remain in effect until September 30, 1978. 1 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R00020008-60056 d. Inquiries.. Questions. regarding, the, instAuctiont km this 0 Bulletin will be addressed to. the- 0M93 repreaentativet in charge of the -agencyte? bu4ge.r est' ates ert Lane Director; Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 OMB Bulletin No. 77-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 SEs Distribution made as follows on 2/17/77: 1 - AO/DCI 1 - OGC Library CIA has no action. Declassified in Part- Sanitized Copy Approved for Release 2013/07/17 : CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M009441R600200080002-6 c EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON. D.C. 20503 BULLETIN NO. 77-6 SUBJECT: Monitoring Federal outlays February 7, 1977 1. Purpose. This Bulletin temporarily revises instructions contained in OMB Circular No. A-112 that relate to the submission of reports on Federal outlays. These instructions apply to each department or agency required to prepare a monthly outlay plan. (See Attachment to OMB Circular No. A-112.) 2. Reporting Requirements. The revision of the January Budget during the next few weeks may significantly affect outlay estimates in some agencies. As a result, the outlay report normally due one week after transmittal of the budget to Congress will not be required.. However, the April 1 update will be due one month earlier than usual -- on March 1, 1977. The update report due on March l'should show a cumulative total of actual outlay8 through January, 1977 and monthly outlay estimates from February through September, 1977. Agencies should explain significant differences between these outlay amounts and the current year amounts contained in the 1978 Budget as amended by the new Administration. This change in reporting requirements pertains only to Fiscal Year 1977. Bert La Director Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200680002-6 0MB Bd1ein No, 77i-5 Declassified in Part- Sanitized Copy Approved for Release 2013/D7/17 : CIA-RDP06M00944R000200080002-6 rk Distribution made 2/9/77: a-4.--c? ? STAT 1 OLC 1 AO/DCI - 000 Library Declassified in Part- Sanitized Copy Approved for Release 2013107117: CIA-RDP06M00944R000200080002-6 II Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 EXECUTIVE OFFICE OF THE PRESIDENT OFFICE OF MANAGEMENT AND BUDGET WASHINGTON. D.C. 20503 BULLETIN NO. 77-5 January 31, 1977 TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Review of previous . agency legislative ' 'recommendations 1. Purpose. This Bulletin establishes procedures for the .clearance (or reclearance) of draft bills and agency reports on pending legislation which were submitted by agencies to the Office of Management and Budget (OMB) prior to -January .20, 1977, 2. Background. Under normal procedures set forth in Office of Management and Budget Circular No. A-19, agencies transmitted to OMB draft bills and reports on pending legislation which were intended for submission to the 95th Congress and were received in OMB prior to January 20, 1977. Many of the draft bills and reports were cleared in accordance with the policies of the previous Administration and were srlt to the 95th Congress by the agencies concerned before January 20, 1977. Others were still pending in OMB on that date. 3.. Review of proposals. Applying the policies and objectives of the present Administration, agencies are requested to review the draft bills and reports which they transmitted to OMB prior to January 20, 1977, and to identify (a) the items which they wish to continue to support, (b) those which they wish to continue to support with revisions, and (c) those from which they wish to withdraw support. This review should take into account the response to the President's memorandum of January 22, 1977, to the Secretaries! of Departments regarding submission of their legislative programs, and the results of the revision of the 1978 Budget in accordance with OMB Bulletin No. 77-4. 4. Preparation and submission of lists. Agencies should prepare the fornwing lists of draft bills and reports and submit them (an original and four copies) to the Assistant Director for Legislative Reference, OMB, as promptly as possible: Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 2 a. A list of draft bills and reports which they wish to continue to support unchanged. With respect to items which were transmitted to the 95th Congress prior to January 20, 1977, this list will be treated as an agency request for reclearance. With respect to items still pending in OMB on that date, the list will identify those items on which the agencies still wish to receive advice. b. A list of draft bills and reports which they wish to continue to support, but with changes. The items on this list should be resubmitted to OMB for clearance in the usual manner. C. A list of draft bills and reports from which they wish to withdraw support. The agencies may send these lists to OMB in installments, and so indicate, if that will serve to expendite clearance, reclearance, or other appropriate action. The agencies will be given advice which reflects the views of the present Administration. S?AIN Bert Lance Director ' Declassified in Part - Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6 _OMB BULLETIN NO. 77-4 Declassified in Part- Sanitized Copy Approved for Release 2013/07/17: CIA-RDP06M00944R000200080002-6