MISSION 4031 17-24 AUGUST 1966 PART III

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP03-00140R000100010039-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
84
Document Creation Date: 
December 28, 2016
Document Release Date: 
April 27, 2012
Sequence Number: 
39
Case Number: 
Publication Date: 
August 1, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP03-00140R000100010039-9.pdf10.31 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 lup SEMI PHOTOGRAPHIC INTERPRETATION REPORT MISSION 4031 17-24 AUGUST 1966 PART I I I TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 ^ TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 TABLE OF CONTENTS PREFACE TRACK OF MISSION HIGHLIGHTS MISSILES AIR FACILITIES NUCLEAR ENERGY NAVAL ACTIVITY/PORTS MILITARY ACTIVITY ATTACHMENTS 1 TOP SECRET CHESS RUFF APPENDIX Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 ? Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 2 0 ~ TOP SECRET CHESS RUFF MISSION 4031, 17-24-AUGUST 1966 OAK - PART III MISSION 4031 PREFACE THIS IS THE THIRD OF FOUR OAK REPORTS FOR MISSION 4031 AND. PROVIDES INFORMATION ON THE HIGHEST PRIORITY COMMITTEE ON OVERHEAD RECONNAISSANCE (COMDR) TARGETS OBSERVED ON THE PHOTOGRAPHY. THE REMAINDER OF _THE COMOR TARGETS COVERED ON THIS PHOTOGRAPHY WILL BE REPORTED IN A SERIES OF OAK SUPPLEMENTS. TARGETS ARE ARRANGED IN THE OAK BY SUBJECT AND WITHIN EACH SUBJECT BY COMOR TARGET NUMBER. TARGETS OF OPPORTUNITY OBSERVED DURING THE OAK REPORTING. PERIOD ARE LISTED NUMERICALLY UNDER THE APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS. LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY THE COUNTRY CODE PRECEDING THE COORDINATES. SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET OBSERVED AND REPORTED FOLLOW THE DESCRIPTION OF THE TARGET. PASS NUMBERS, SUFFIXED WITH A FOR ASCENDING AND D FOR DESCENDING, ARE LISTED FIRST, FOLLOWED BY FRAMES WHICH ARE INDICATED BY THE FRAME NUMBER WITH AN INDEX NUMBER RUNNING CONSECUTIVELY FROM THE BEGINNING OF EACH PASS -- 4/8 FOR EXAMPLE, MEANS FRAME 4, INDEX 8. UNIVERSAL REFERENCE GRID COORDINATES FOR NEW TARGETS ARE GIVEN IN PARENTHESIS AFTER THE INDEX NUMBER TO WHICH THEY APPLY. THIS GRID IS IDENTIFIED AS UNIVERSAL GRID NO 1, FEB 64. SYMBOLS INDICATING CONDITIONS WHICH AFFECT THE APPEARANCE OF THE TARGET ON THE PHOTOGRAPHY ARE -- C (CLEAR), SC (SCATTERED CLOUD COVER), HC (HEAVY CLOUD COVER), H (HAZE), CS (CLOUD SHADOW), S (SNOW), 0 (OBLIQUITY),-SD (SEMIDARKNESS), D (DARKNESS), GC (GROUND COVER), CF (CAMOUFLAGE), AND GR (GROUND RESOLUTION). COLOR COVERAGE IS DESIGNATED BY THE LETTER C IMMEDIATELY FOLLOWING FRAME NUMBERS. INTERPRETABILITY OF THE PHOTOGRAPHY IS CATEGORIZED AS G (GOOD), F (FAIR), OR P (POOR). THE EXTENT OF PHOTOGRAPHIC COVERAGE::IS DENOTED BY THE SYMBOLS T (TOTAL) OR PT (PARTIAL). THE MODE OF COVERAGE; IS INDICATED BY.ST (STEREO), PS (PARTIAL STEREO), OR NS (NON-STEREO). THE INITIAL SCAN OFTHE PHOTOGRAPHY IS ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT OF EPHEMERIS DATA. CONSEQUENTLY, FUTURE DETAILED ANALYSIS MAY RESULT IN MINOR TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 . lOP SECRET CHESS RUFF MISSION 4031, 17-24'AUGUST 1966 ALTERATIONS. MOREOVER, RECIPIENTS ARE CAUTIONED THAT THE IDENTIFICATION OF TARGETS IS BASED PRIMARILY ON PHOTOGRAPHY AND DOES NOT CONSTITUTE A FINISHED INTELLIGENCE JUDGMENT. TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Next 5 Page(s) In o Document Denied Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Highlights Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 w r JtLKt I IMtSS KM MISSION 4031, 17-24'AUGUST 1966 HIGHLIGHTS COMMENCING WITH THIS OAK, GRID COORDINATES WILL BE OMITTED FROM THE PHOTO REFERENCE LINE ON KH-7 MISSIONS,-EXCEPT ON NEW TARGETS. AS A RESULT OF'A STEREO MIRROR MALFUNCTION AFTER PASS 149 ALL SUCCEEDING COVERAGE WAS IN A NON-STEREO MODE. SOVIET OFFENSIVE MISSILE ACTIVITY TWENTY-THREE SINGLE SILO SITES HAVE BEEN IDENTIFIED THUS FAR ON THIS MISSION -- 1 TYPE ILIC AT DOMBAROVSKIY, 1 TYPE IIIC AT KARTALY, 3 TYPE IIID AT KOSTROMA, 1 TYPE IIID AT OLOVYANNAYA, 5 TYPE IIID AT SVOBODNYY AND 12 TYPE HID AT.TATISHCHEVO. AT THE KAPUSTIN YAR/VLADIMIROVKA..MISSILE TEST CENTER, THE SSM FACILITIES AND THE AKHTUBINSK/VLADIMIROVKA AIRFIELD ARE COVERED BY CLEAR, NON-STEREO PHOTOGRAPHY OF GOOD INTERPRETABILITY. A MISSILE EXERCISE IS OBSERVED AT LAUNCH AREA IC AND 5C. CONSTRUCTION CONTINUES AT LAUNCH SITE 4C1 AND: PROBABLE LAUNCH AREA 6C. PROBABLE MISSILE SUPPORT EQUIPMENT WAS OBSERVED ON RAIL CARS IN THE PROBABLE MISSILE ASSEMBLY AND CHECKOUT AREA. AN ASM-4 (KITCHEN) WAS IDENTIFIED IN THE MISSILE STORAGE AND HANDLING AREA NEAR THE AKHTUBINSK/VLADIMIROVKA AIRFIELD. AT THE TYURATAM MISSILE TEST CENTER LAUNCH COMPLEX G, MODIFICATION AND CONSTRUCTION CONTINUES AT LAUNCH AREAS G1-G2 AND G3-G4. FOURTEEN, THEN 15 CYLINDRICAL OBJECTS, 65 FEET LONG, ARE POSITIONED WITHIN THE FENCE LINE AT LAUNCH AREA G5-G6. THREE SIMILAR OBJECTS ARE LOCATED, AT THE POSSIBLE COMPONENT CHECKOUT/HANDLING FACILITY. 10 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Missiles Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9n5X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24-AUGUST :1966 MISSILES TYURATAM MISSILE TEST CENTER UR 4538N. 06317E NO NEW MISSILE FACILITIES IDENTIFIED ON PORTIONS OF THE SEARCH AREA COVERED. THREE VEHICLES/PIECES OF EQUIPMENT ARE PARKED WITHIN THE LOOP ROAD JUST EAST OF THE RIGHT SILO. NUMEROUS SMALL OBJECTS ARE ON OR NEAR THE HARDSTAND SURROUNDING THE SILOS. THE SITE APPEARS TO BE UNCHANGED SINCE LAUNCH AREA G1-G2 -- CONSTRUCTION CONTINUES. THE AREA BETWEEN PADS G1 AND G2 IS IN. THE PROCESS OF BEING EXCAVATED AT SEVERAL POINTS. OPEN DITCHING CONTAINING CONDUIT IS OBSERVED, BUT IT CANNOT BE DETERMINED IF THIS IS NEW CONSTRUCTION OR REEXCAVATION OF ORIGINAL FACILITIES. A CYLINDER IS LOCATED IN FRONT OF-THE SMALL EARTH-MOUNDED BUILDING ON THE WEST SIDE OF THE READY BUILDING AT G1. THE GANTRIES ARE IN THEIR USUAL POSITIONS AT THE REAR OF-.THE PADS, AND THE POSSIBLE MISSILE/COMPONENTS FREQUENTLY SEEN ARE ON THE RAILS IN FRONT OF THE READY BUILDINGS. THE BUILDING UNDER CONSTRUCTION IN THE EXCAVATION FORWARD OF G1 APPEARS TO ENCOMPASS A CIRCULAR STRUCTURE WHICH IS SLIGHTLY OFFSET FROM THE CENTER, TOWARD THE RAIL SPUR APPROACHING FROM THE NW. THIS CIRCULAR STRUCTURE COULD BE A PEDESTAL OR A SILO. THE BUILDING APPEARS-TO BE COMPARTMENTED IN A MANNER SIMILAR TO THAT OBSERVED IN THE HEADWORKS OF A TYPE IIIC SILO, BUT THE BUILDING AT PRESENT IS SMALLER, AND RECTANGULAR RATHER THAN SQUARE. A REVIEW OF EARLIER COVERAGES SHOWS NO EVIDENCE OF ,A SILO CORING OR SILO CONSTRUCTION,-BUT THE SIMILARITY OF APPEARANCE TO TYPE IIIC HEADWORKS AND THE CIRCULAR STRUCTURE SUGGEST THAT THESE BUILDINGS MAY BE SILOS 11 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 0 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 LAUNCH AREA G3-G4 -- CONSTRUCTION CONTINUES. THE DITCH, PREVIOUSLY REPORTED PARALLEL TO THE ORIENTATION OF THE FENCE ACROSS THE REAR OF THE LAUNCH AREA, CONTAINS CONDUIT WHICH ENTERS A LINEAR EARTH MOUND PARALLEL TO THE GANTRY TRACKS. THE DITCH PREVIOUSLY REPORTED EXTENDING EASTWARD FROM PAD G3 NOW APPEARS.TO HAVE BEEN EXTENDED UNDERNEATH THE PAD FOR A SHORT DISTANCE TO THE WEST. SIMILAR CONSTRUCTION IS NOW APPARENT AT PAD G4 AND.THE ALIGNMENT OF CONDUIT SEGMENTS SUGGEST. THAT A SIMILAR DITCH WILL PROBABLY BE OPENED FROM G4 TO THE CENTER OF THE LAUNCH AREA. THE DITCH PREVIOUSLY REPORTED EXTENDING SOUTHWARD TOWARD THE L-SHAPED ELECTRONIC FACILITY NOW ENTERS 2 OF THE EARTH-MOUNDED BUILDINGS. A STRUCTURE IS UNDER CONSTRUCTION FORWARD.OF PAD G3, ADJACENT TO THE DITCH WHICH.:EXTENDS NORTHEASTWARD TOWARD THE FENCE LINE. ONE OF THE EARTH-MOUNDED TANKS IN THE CENTER OF THE LAUNCH AREA HAS BEEN REMOVED. AT PAD G4 THE ERECTING MECHANISM IS IN AN INCLINED POSITION. THE GANTRIES ARE LOCATED IN THEIR USUAL POSITION AT?THE REAR OF THE PADS. LAUNCH AREA G5-G6 -- THE GANTRY IS LOCATED ON PAD G6 ALONG WITH A CYLINDRICAL OBJECT OLONG AND A VEHICLE/PIECE OF EQUIPMENT. A PROBABLE MISSILE TRANSPORTER AND A 4-LEGGED APPARATUS WITH A RING NEAR ITS TOP ARE ON PAD G5. FOUR VEHICLES/PIECES OF EQUIPMENT ARE LOCATED IN THE SW CORNER OF-.THE LAUNCH AREAAND 4 OTHERS ARE LOCATED ALONG THE EASTERN FENCE LINE. FOURTEEN CYLINDERS APPROXIMATELY LONG ARE POSITIONED ALONG THE EAST FENCE L . ONE OF.THESE IS LIGHT TONED AND APPEARS TO BE SMOOTH AND REGULARLY SHAPED. THE OTHER 13 HAVE A DARK MOTTLED APPEARANCE AND MAY BE SLIGHTLY DISTORTED. ~- NO SIGNIFICANT CHANGE SINCE PASS OBSERVED AT PAD G6. AT PAD G5, 2 LONG AND 2 SHORTER VEHICLES/PIECES OF EQUIPMENT ARE LOCATED ON THE PAD. IN ADDITION TO THE 4 LEGGED APPARATUS. FIVE VEHICLES/PIECES OF EQUIPMENT ARE LOCATED IN THE SW CORNER OF THE LAUNCH AREA, 7 ARE LOCATED IN THE NE CORNER OF.THE LAUNCH AREA, AND.15 CYLINDERS ARE POSITIONED ALONG'THE EASTERN FENCE LINE. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES-OBSERVED. 12 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 ^ Declassified 25X1 TOP SECRET CHESS RUFF in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 40319 17-24.AUGUST 1966 25X1 0 25X1 0 25X1 -- 5 VEHICLES/PIECES OF EQUIPMENT ARE PARKED IN FRONT OF'.THE EARTH-MOUNDED BUILDING IN THE SW CORNER OF,THE FACILITY,. AND A ROW OF SMALL VEHICLES/PIECES OF EQUIPMENT ARE PARKED AT THE NORTH END OF THE LARGE BUILDING. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. H- NOT COVERED. H- NOT COVERED. EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. - NO 'MISSILES, MISSILE-RELATED REVETTED STORAGE AREA -- A U-SHAPED BUILDING IS UNDER CONSTRUCTION AT THE END OF-THE DITCH REPORTED EXTENDING WESTWARD. A RECTANGULAR EXCAVATION IS ADJACENT TO THE DITCH ON ITS NORTH SIDE. POSSIBLE COMPONENT CHECKOUT/HANDLING FACILITY -- 3 CYLINDERS APPROXIMATELY 65 FT IN LENGTH ARE PARKED ON THE WEST END OF THE LOOP ROAD SERVING THE DRIVE-THROUGH BUILDING. THREE SIMILAR CYLINDRICAL OBJECTS WERE OBSERVED IN THE SAME LOCATION ON THEY.APPEAR TO BE SIMILAR TO THOSE OBSERVED ALONG THE EAST FENCE LINE AT LAUNCH AREA: G5-G6. A MISSILE RAIL TRANSPORTER AND A STRING OF APPROXIMATELY 10 RAIL CARS ARE ON THE RAIL SPUR. APPROXIMATELY .35 SMALL VEHICLES/PIECES OF EQUIPMENT ARE PARKED AT VARIOUS LOCATIONS IN THE FACILITY. COMPLEX SUPPORT FACILITY -- 6 OPEN-TOPPED, PROBABLY CONCRETE-LINED BASINS HAVE BEEN CONSTRUCTED ON A KNOLL WSW OF THE SUPPORT FACILITY. THE BASINS ARE BOWL-SHAPED AND ARE CLOSELY SPACED IN 2 ROWS OF 3 BASINS. RAIL CARS ARE PARKED SINGLY.AND IN STRINGS AT VARIOUS POINTS IN THE SUPPORT FACILITY BUT NO UNUSUAL CARS HAVE BEEN IDENTIFIED. DITCHING HAS BEEN OPENED FROM THE VICINITY OF.THE 2 EARTH-MOUNDED TANKS ON THE NORTH SIDE OF=THE COMPLEX MAIN ROAD. IT EXTENDS EASTWARD TO THE ACCESS ROAD TO LAUNCH AREA G3-G4, AND THEN EXTENDS SSE PARALLEL TO THE ACCESS ROAD, TO A POINT NEAR THE INTERSECTION OF THE ACCESS ROAD AND THE COMPLEX MAIN ROAD. 13 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 25_ Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 TOP SECRET CHESS RUFF SITE K1 ?- H- THE SILO DOOR IS CLOSED. FOUR SMALL VEHI F EQUIPMENT ARE LOCATED NEAR THE SILO AND A LONG VEHICLE/PIECE OF EQUIPMENT IS PARKED ON THE APRON JUST NORTH OF THE SILO. TWO VEHICLES/PIECES OF EQUIPMENT ARE PARKED WEST OF THE LOOP ROAD. SITE K2 -- ~~ THE SILO DOOR IS OPEN. A SMALL VEHICLE/PIECE OF EQUIPMENT WITH A TALL, INCLINED MEMBER IS PARKED AT THE SILO. TWO CRANES ARE PARKED ON THE APRON NORTH OFTHE SILO AND 6 SMALL VEHICLES/PIECES OF EQUIPMENT ARE PARKED IN THE VICINITY OF THE SILO. APPROXIMATELY 17 VEHICLES/PIECES OF EQUIPMENT ARE PARKED NEAR THE BUILDINGS AT THE ENTRANCE TO THE SIT SITE K2 -- ~THE SMALL VEHICLE/PIECE OF EQUIPMENT WITH TALL.INCLINED MEMBER IS NO LONGER PRESENT AND 1 OF THE CRANES IS PARKED AT THE SILO. NO..OTHER SIGNIFICANT CHANGES APPARENT. THERE ARE APPROXIMATELY 12 VEHICLES/PIECES OF EQUIPMENT NEAR THE BUILDINGS AT THE ENTRANCE TO THE SITE. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. THE HARDSTANDS ALONG THE SOUTH FENCE LINE APPEAR TO BE COMPLETE AND ARE SEPARATELY. SECURED FROM THE REST OF THE LAUNCH SITE. NEAR THE EASTERN END OF THIS SECURED AREA IS A SMALL, EARTH-MOUNDED STRUCTURE SERVED BY A WALKWAY. THE SILO DOOR IS CLOSED AND APPROXIMATELY 19 VEHICLES/PIECES OF EQUIPMENT ARE LOCATED THROUGHOUT THE SITE. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 14 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-95X1 MISSION 4031, 17-24'AUGUST1966 TYURATAM LAUNCH GROUP L (SITE 11) UR 4603N 06259E ~- THE SILO DOOR IS OPEN AND A RING IS LYING ON THE APRON ADJACENT TO THE SILO. THE SILO DOOR IS CLOSED AND A RING IS LYING ON THE APRON ADJACENT TO THE SILO. A LONG VEHICLE/PIECE OF EQUIPMENT AND A CRANE ARE PARKED ON THE LEVEL ACCESS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. CLOSED. ONE SMALL VEHICLE/PIECE OF?EQUIPM RING ARE ON THE SILO APRON. TYURATAM LAUNCH GROUP L (SITE L2) THE SILO UR 4606N 06300E NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TWO SMALL VEHICLES/PIECES OF=EQUIPMENT ARE ON THE APRON ON NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. 15 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 TYURATAM LAUNCH GROUP L (SITE L5) UR 4559N 06257E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. -- A VEHICLE/PIECE OF EQUIPMENT IS ON THE APRON AND A VEHICLE IS ON THE ACCESS ROAD JUST OUTSIDE THE FENCE. - NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ONE LONG AND SEVERAL SMALL VEHICLES/PIECES OF EQUIPMENT ARE ON THE GRADED ACCESS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 2 VEHICLES/PIECES OF EQUIPMENT ARE ON THE APRON AND A RING IS ON THE ACCESS. THE VEHICLES/PIECES OF EQUIPMENT HAVE BEEN NO NEW CONSTRUCTION, CHANGES-IN FACILITIES,.OR 16 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 25_ Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-00140R000100010039-9 MISSION 4031, 17-24 AUGUST 1966 2- ---2 POSSIBLE VEHICLES/PIECES OF EQUIPMENT ARE ON THE APRON. ~-- 1 VEHICLE/PIECE OF EQUIPMENT IS LOCATED ON THE GRADED ACCESS AND ANOTHER IS LOCATED WEST OF THE GRADED ACCESS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ONE SMALL VEHICLE/PIECE OF EQUIPMENT IS ON THE ACCESS ROAD AT THE ENTRANCE TO THE SITE ON PAS NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TYURATAM LAUNCH GROUP M (SITES M1,M2) UR 4603N 06302E SITE M1 -- DITCHING HAS BEEN-OPENED FROM SITE MI WESTWARD TO THE VICINITY OF SITE Li. NO HEADWORKS HAVE BEEN CONSTRUCTED AT M1. SITE M2 -- A CRANE IS IN THE SILO EXCAVATION. NO SILO HEADWORKS HAVE BEEN CONSTRUCTED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONST:RUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 17 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 TOP SECRET CHESS RUFF NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. H THE 6 VEHICLES/PIECES OF EQUIPMENT.ARE IN THE SAME POSITION. A CRANE IS NOW PARKED ON THE LEVEL ACCESS. THE SILO DOOR IS OPEN. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ~- BOTH SILO DOORS ARE OPEN. AT SILO N2, A RING AND 2 VEHICLES/PIECES OF EQUIPMENT ARE ON THE APRON NEAR THE SILO. AT SILO N3, 2 VEHICLES/PIECES OF EQUIPMENT ARE ON THE APRON NEAR THE SILO. APPROXIMATELY 8 OTHER SMALL VEHICLES/PIECES OF EQUIPMENT ARE LOCATED THROUGHOUT THE SITE. BOTH SILO DOORS ARE OPEN. A. RING AND 1 VEHI LE/PIECE OF EQUIPMENT ARE ON THE APRON NEAR SILO N2 AND 2 SMALL VEHICLES/PIECES OF EQUIPMENT ARE ON THE APRON NEAR SILO N3. APPROXIMATELY 6 OTHER SMALL VEHICLES/PIECES OF EQUIPMENT ARE LOCATED ABOUT THE SITE. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 18 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 m 1 VF JL%.KL I %.nc. i%urr MISSION 4031, 17-24 AUGUST 1966 CONTINUING ANALYSIS OF__THE UZHUR ICBM COMPLEX REVEALS A GROUP OF 10 BUILDINGS THAT.CLOSELY:RESEMBLES A SITE SUPPORT FACILITY ON THE EXTREME EDGE OF.THE FRAME OF PHOTOGRAPHY. NO LAUNCH SILO CAN BE IDENTIFIED, HOWEVER, THIS IS PROBABLY DUE TO THE LIMITS OF THE PHOTOGRAPHIC COVERAGE. THE GROUP OF 10 BUILDINGS:IS LOCATED APPROXIMATELY 3 NM SE OF-THE-COMPLEX SUPPORT FACILITY AT 55-15N 089-53E. A NEW SITE IN THIS LOCATION WOULD INDICATE THE START OF A FIFTH LAUNCH GROUP, HOWEVER, NO POSITIVE IDENTIFICATION CAN BE MADE ON THE BASIS OF AVAILABLE PHOTOGRAPHY. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. FOUR PROBABLE VEHICLES AND 5 VEHICLES/PIECES OF EQUIPMENT ARE IN VICINITY OF THE MISSILE HANDLING BUILDINGS. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 19 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 NO MISSILES, MISSILE-RELATED:EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SITE IS NOW COMPLETE. A POSSIBLE VEHICLE IS ON GRADED ACCESS. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SITE IS NOW COMPLETE. TWO POSSIBLE VEHICLES ARE ON SILO APRON. CONTROL BUILDING HAS BEEN EARTH-MOUNDED AND CONSTRUCTION CONTINUES ON L-SHAPED ELECTRONIC FACILITY. NO MISSILE, MISSILE-RELATED EQUIPMENT, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SITE IS NOW COMPLETE. A VEHICLE/PIECE OF 'EQUIPMENT IS ON THE END OF-THE GRADED ACCESS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 20 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-95X1 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES,.OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT* NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. OLOVYANNAYA ICBM LAUNCH SITE 23 UR 510IN 11551E SITE IS COMPLETE. A VEHICLE, POSSIBLY VAN-TYPE, IS SITUATED NEAR THE END.OFTHE GRADED ACCESS. A LONG LOW-BED VEHICLE IS ON THE ACCESS TURN-AROUND WITH A~ 21 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF SMALLER VEHICLE ALONGSIDE. A POSSIBLE VEHICLE/PIECE OF EQUIPMENT IS BEHIND THE SILO DOOR. NO MISSILES OR NEW CONSTRUCTION OBSERVED. SITE IS IN A LATE STAGE OF CONSTRUCTION. ADJACENT CONTROL FACILITY CONSISTS OF AN ELONGATED CONTROL BUILDING IN AN EXCAVATION, AN L-SHAPED ELECTRONIC FACILITY UNDER CONSTRUCTION, AN`ARCHED-ROOF BUILDING WITH 2 ENTRANCEWAYS, AND A SHALLOW EXCAVATION CONTAINING 2 TANK-LIKE OBJECTS. A SECOND EXCAVATION IS NW OF CONTROL BUILDING AND HAS 2 RECTANGULAR. CUTS IN THE BOTTOM AND 2 TANK-LIKE OBJECTS ON ITS LIP. IN THE SEPARATELY SECURED MISSILE HANDLING AND CHECKOUT AREA THERE ARE 8 MAJOR BUILDINGS -- 2 DRIVE-THROUGH, 2 DRIVE-IN, 1 DRIVE-IN OR DRIVE-THROUGH, 2 UNDETERMINED, AND 1 SMALL BUILDING UNDER CONSTRUCTION. THREE LONG VEHICLES ARE IN FRONT OF THE SOUTHERNMOST DRIVE-IN BUILDING. SEVEN PIECES OF EQUIPMENT ARE ALONGSIDE THIS 25X1 25X1 FOUR EXCAVATIONS ARE SITUATED ABOUT THE GRADED ACCESS IN APPROXIMATELY THE SAME POSITION AS THE 4 MOUNDS COMMON TO TATISHCHEVO IIID SITES. THE CONTROL FACILITY NOW CONSISTS OF A CONTROL BUILDING AND 4 TANK-LIKE OBJECTS IN AN EXCAVATION, AN ARCHED-ROOF BUILDING ON THE EDGE OF THE EXCAVATION, 2 SEPARATELY SECURED EARTH-MOUNDED ARCHED-ROOF BUILDINGS, AND A UNIQUE T-SHAPED ELECTRONICS FACILITY INSTEAD OF . THE USUAL L-SHAPE. THE ELECTRONICS FACILITY CONSISTS OF 3 ANTENNA POSITIONS IN A LINE JOINED TO THE CONTROL FACILITY.BY A BURIED CABLE. A HOUSING/SUPPORT AREA IS NORTH OF THE SITE AND CONSISTS OF 15 MAJOR BUILDINGS, A PROBABLE SEMI-BURIED BUILDING, AND A MOTOR POOL CONTAINING AT 22 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF LEAST 33 VEHICLES/PIECES OF EQUIPMENT WITH 2 ASSOCIATED BUILDINGS. NO MISSILES OBSERVED. SITE REMAINS IN A LATE STAGE OF CONSTRUCTION. A SMALL STRUCTURE IS SITUATED IN AN EXCAVATION ON THE EAST SIDE OF THE ACCESS. A SILO DOOR IS ON RAILS IN THE OPEN POSITION. THREE EXCAVATIONS ARE SITUATED ABOUT THE GRADED ACCESS IN POSITION SIMILAR TO THE MOUNDS FOUND AT TATISHCHEVO HID SITES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE REMAINS IN A LATE STAGE OF CONSTRUCTION. A SMALL STRUCTURE IS SITUATED IN AN EXCAVATION ON THE EAST SIDE OF THE ACCESS. A SILO DOOR IS ON'THE RAILS IN THE OPEN POSITION. A DISC-OR CONE-SHAPED OBJECT IS SITUATED ON THE DOOR RAILS. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE REMAINS IN A LATE STAGE OF CONSTRUCTION. A VEHICLE/PIECE OF EQUIPMENT IS ON THE SILO APRON. A SILO DOOR IS UNDER CONSTRUCTION ON THE RAILS. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE REMAINS IN A LATE STAGE OF CONSTRUCTION. A PARTIALLY COMPLETED DOOR IS ON THE RAILS IN THE CLOSED POSITION. AN EXCAVATION IS SITUATED ON THE EAST SIDE OF THE ACCESS. GRADING OF.-THE ACCESS IS INCOMPLETE. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. 23 25X1 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Coov Aooroved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST?1966 I I OLOVYANNAYA ICBM LAUNCH SITE 35 UR 505ON 11556E SITE IS IN A LATE STAGE OF CONSTRUCTION. A SMALL STRUCTURE IS IN AN EXCAVATION ON THE WEST SIDE OF'.THE ACCESS. ACCESS GRADING IS INCOMPLETE. AN ARCHED-ROOF BUILDING WITH AN ENTRANCEWAY IS SITUATED BETWEEN THE SECURITY FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. OLOVYANNAYA ICBM LAUNCH SITE 36 . UR 5048N 11557E SITE CONTINUES IN A MID-STAGE OF CONSTRUCTION. FOOTINGS FOR THE SILO DOOR RAILS ARE VISIBLE. A SMALL STRUCTURE IS SITUATED IN AN EXCAVATION SE OF THE SILO. AN ARCHED-ROOF BUILDING WITH AN ENTRANCEWAY IS SITUATED BETWEEN THE SECURITY FENCES. NO.MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE CONTINUES IN A MID-STAGE OF CONSTRUCTION. A SMALL STRUCTURE IS IN AN EXCAVATION SOUTH OF THE SILO. AN ARCHED-ROOF BUILDING WITH AN ENTRANCEWAY IS SITUATED BETWEEN THE SECURITY FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. OLOVYANNAYA ICBM LAUNCH SITE 38' UR 5049N 11551E SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. ACCESS GRADING IS INCOMPLETE. A SMALL STRUCTURE IS IN AN EXCAVATION ON WEST SIDE OFACCESS. A POSSIBLE CRANE IS ON A GRADED ACCESS NEXT TO SILO. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. 24 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 25 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 iur JtlKt I UI1tSJ KUI.I- MISSION 4031, 17-24 AUGUST 1966 IDENTIFICATION ONLY. OLOVYANNAYA ICBM LAUNCH SITE 51 UR 5042N 11557E SITE CONTINUES IN A MID-STAGE OF CONSTRUCTION. A SMALL STRUCTURE IS IN AN EXCAVATION ON THE EAST SIDE OF THE ACCESS. ACCESS GRADING IS INCOMPLETE. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE CONTINUES IN A MID-STAGE OF CONSTRUCTION. A SMALL EXCAVATION IS SE OF THE SILO. A BUILDING IS UNDER CONSTRUCTION BETWEEN THE 2 SECURITY. FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. LAUNCH SITE IS CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. TWO BUILDINGS ARE UNDER CONSTRUCTION OUTSIDE THE 2 SECURITY FENCES SW OF'THE SILO. AN ARCHED-ROOF BUILDING IS UNDER CONSTRUCTION ON THE EDGE OFTHE PROBABLE CONTROL BUILDING EXCAVATION. AREA ENCOMPASSED BY SECURITY FENCING IS-SUFFICIENT TO ACCOMMODATE AN L-SHAPED ELECTRONIC FACILITY.. THE HOUSING/SUPPORT AREA CONTAINS 9 MAJOR BUILDINGS AND 1 POSSIBLY SEMI-BURIED BUILDING. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE IS IN A MID-STAGE OF CONSTRUCTION. A SMALL EXCAVATION IS SE OF THE SILO. A BUILDING IS UNDER CONSTRUCTION BETWEEN THE 2 SECURITY FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. 25 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 25 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 SITE IS IN A MID-STAGE OF=CONSTRUCTION. A SMALL STRUCTURE IS IN AN EXCAVATION NORTH OF=.THE SILO. A BUILDING IS UNDER CONSTRUCTION BETWEEN THE 2 SECURITY FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. A BUILDING IS UNDER CONSTRUCTION BETWEEN THE 2 SECURITY FENCES. NO MISSILE OR MISSILE-RELATED EQUIPMENT OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE IS IN A MID-STAGE OF CONSTRUCTION. A BUILDING FOUNDATION IS UNDER CONSTRUCTION BETWEEN THE SECURITY FENCES. NEARBY IS A SMALL EXCAVATION. A VEHICLE/PIECE OF EQUIPMENT IS IN THE SILO EXCAVATION. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE CONTINUES IN A MID-STAGE OF CONSTRUCTION. A BUILDING IS UNDER CONSTRUCTION BETWEEN THE 2.SECURITY FENCES. A SMALL STRUCTURE IS IN AN EXCAVATION BETWEEN THE FENCES SE OF THE SILO. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. 26 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 W r Z)tLKt i LH M Kurt SITE CONTINUES IN A MID-STAGE OF CONSTRUCTION. A SMALL STRUCTURE IS UNDER CONSTRUCTION IN AN EXCAVATION BETWEEN THE 2 SECURITY FENCES SE OF THE SILO. A BUILDING IS UNDER CONSTRUCTION BETWEEN THE SECURITY FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE CAN NOW BE CONFIRMED AND IS IN AN EARLY STAGE OF CONSTRUCTION. A SILO CORE IS VISIBLE IN THE BOTTOM OF EXCAVATION AND A CRANE IS ON THE EDGE OF THE EXCAVATION. SITE IS DOUBLE FENCED. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE IS IN A MID-STAGE OF CONSTRUCTION. A BUILDING IS UNDER CONSTRUCTION BETWEEN THE 2 SECURITY FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. SITE CONTINUES IN A MID-STAGE OF CONSTRUCTION. A SMALL EXCAVATION IS SOUTH OF THE SILO. A BUILDING IS SITUATED BETWEEN THE 2 SECURITY FENCES. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 27 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 ^ Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 THE 2 STRUCTURES UNDER CONSTRUCTION IN EXCAVATIONS, REPORTED ON ARE NOW COMPLETE AND ARE ARCH-ROOFED. UNE 15 EARTH-MOUNDED AND THE OTHER PARTIALLY EARTH-MOUNDED. NINE-:PROBABLE FUEL TRUCKS, 6 PROBABLE CANVAS-COVERED VEHICLES, AND 6 SMALL TANK TRUCKS ARE IN THE MOTOR POOL NE OF THE TRANSFER POINT. NO MISSILES OBSERVED. CONTINUING ANALYSIS OF THE KARTALY.ICBM COMPLEX REVEALS A NEWLY IDENTIFIED TYPE IIIC LAUNCH SITE (27) ON THE NORTH SIDE OF THE RAIL-TO-ROAD TRANSFER POINT AT 53-01N 060-33E. SITE 27 IS IN A MID-STAGE OF CONSTRUCTION. 25X1 25X1 TWELVE NEW TYPE IIID LAUNCH SITES (INCLUDING 1 PROBABLE AND 1 POSSIBLE SITE) ARE NEWLY IDENTIFIED AND LAUNCH SITE 97 CAN BE CONFIRMED IN A MID-STAGE OF CONSTRUCTION. A NEW LAUNCH GROUP, J, CAN BE CONFIRMED WITH SITE 81 AS THE CONTROL. OF .THE 12 NEW LAUNCH SITES, SITES 105-107 ARE IN A MID-STAGE OF CONSTRUCTION AND THE OTHER 9 ARE IN AN EARLY STAGE. SITES 104-108 WERE OBSERVED ON AND THE OTHER 7 SITES ON PASS GEOGRAPHIC COORDINATES AND. PHOTOGRAPHICREFERENCES FOR THESE SITES -- TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 GRADING ACTIVITY IS IN PROGRESS APPROXIMATELY.5.5 NM NE OF CONTROL SITE 81 BETWEEN SITES 99 AND 109. AREA WAS NEGATED ON NO OTHER MISSILE FACILITIES OBSERVED IN THE AREA COVERED BY PHOTOGRAPHY. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 29 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 - TOP SECRET CHESS RUFF MISSION 40319 17-24.AUGUST 1966 TATISHCHEVC ICBM LAUNCH SITE 7 UR 5147N 04534E LAUNCH SITE IS IN A LATE STAGE OF CONSTRUCTION. SILO APRON IS BEING PAVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 8 UR 515ON 04534E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 30 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-001408000100010039-9 NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVC ICBM LAUNCH SITE 12 UR 5136N 04530E LAUNCH SITE IS NOW COMPLETE. CONSTRUCTION OF CONTROL FACILITY IS NEARLY COMPLETE. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 13 UR 5134N 04523E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 14 UR 5133N 04529E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 15 UR 5132N 04535E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 31 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 TOP SECRET CHESS RUFF MISSION 4031,17-24 AUGUST ?:1966 NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 17 UR 5136N 04535E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 19 UR 5131N 04523E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 20 UR 5133N 04518E LAUNCH SITE IS NOW IN A LATE STAGE OF'CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 21 UR 5138N 04524E LAUNCH SITE IS NOW COMPLETE. NO MISSILES, MISSILE-RELATED EQUIPMENT,-NEW 32 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24'`AUGUST ,1966 CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 22 UR 5132N 04513E LAUNCH SITE REMAINS IN A LATE STAGE OF=CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION,` CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 24 UR 5132N 045.146E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 25 UR 5126N 04516E LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 26 UR 5128N. 04510E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 33 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17-24 AUGUST 1966 TATISHCHEVO ICBM LAUNCH SITE 27 UR 5129N 04515E LAUNCH SITE IS.NOW IN A LATE STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. UR 5127N 04521E LAUNCH SITE REMAINS IN A LATE STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 29 UR 5129N 04533E NO MISSILES, MISSILE-RELATED?EQUIPMENT9 NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 30 UR 514ON 04524E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 34 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE REMAINS IN A LATE STAGE OF CONSTRUCTION. CONSTRUCTION CONTINUES ON PROBABLE CONTROL FACILITY. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 _ 0 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 TATISHCHEVO ICBM LAUNCH SITE 38 UR 514ON 04502E LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. ivu P11JJiLCJ, Pti3JLLC-YCCLAICU CWU1rNCP t, N W CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 39 UR 5146N 04506E LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 41 UR 5143N 04508E LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 42 UR 5145N 04511E LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17-24'AUGUST1966 TATISHCHEVO ICBM LAUNCH SITE 44. UR 5125N 04504E LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 47 UR 5155N 04543E LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 51 UR 5149N 04511E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE CAN NOW BE.CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE IS STILL IN A LATE STAGE OF CONSTRUCTION. TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17-24 AUGUST 1956 NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE IS NOW IN A MID-STAGE OF CONSTRUCTION AND CAN BE CONFIRMED AS A CONTROL SITE. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 iur StLKtl CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 TATISHCHEVO ICBM PROB LAUNCH SITE 63 UR 5156N 04523E CONSTRUCTION STATUS IS UNDETERMINED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILIT?IES,.OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. UR 5151N 045.25E LAUNCH SITE CAN NOW BE CONFIRMED AND IT IS IN A MID-STAGE OF CONSTRUCTION. NO-MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION AND IS NOW CONFIRMED AS A CONTROL SITE. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 39 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-001408000100010039-9 MISSION 4031, 17-24 AUGUST 1966 TATISHCHEVO ICBM PROS LAUNCH SITE 69 UR 5208N 04524E CONSTRUCTION STATUS IS UNDETERMINED. NO MISSILES, MISSILE-RELATED EQUIPMENT '8 NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM PROS LAUNCH SITE 70 UR 5208t1 04529E CONSTRUCTION STATUS IS UNDETERMINED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 71 UR 5204N 04531E LAUNCH SITE CAN NOW BE.CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES,:OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 72 UR 5139N 04514E LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 40 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 TATISHCHEVO ICBM LAUNCH SITE 74 UR 5208N 04517E LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES,.MISSILE--RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 75 UR 5159N 04530E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 80 UR 5201N 04545E LAUNCH SITE REMAINS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION* CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE IS NOW IN A MID-STAGE OF CONSTRUCTION AND CAN BE CONFIRMED AS A CONTROL SITE. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY, 41 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 UNREPORTED FEATURES OBSERVED. ' TATISHCHEVO ICBM LAUNCH SITE.83 UR 5212N 04528E LAUNCH SITE IS NOW IN A MID-STAGE OF=CONSTRUCTION. NO MISSILESs'MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 84 UR 5215N 04531E LAUNCH SITE IS NOW IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 85 UR 5213N 04516E LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 86 UR 5211N 04521E LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY 42 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 _ Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF 25X1 25X1 LAUNCH SITE CAN NOW BE CONFIRMED AND IS IN A MID-STAGE NO MISSILES,.MISSILE-RELATED=EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE CAN NOW BE:CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE REMAINS IN A MID-STAGE OFCONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. LAUNCH SITE IS NOW IN A MID-STAGE OF CONSTRUCTION AND CAN BE CONFIRMED AS A CONTROL SITE. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY 43 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17-24 AUGUST 1966 TATISHCHEVO ICBM LAUNCH SITE 92. LAUNCH SITE CAN NOW BE:CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 93 UR 5211N 04513E LAUNCH SITE CAN NOW BE'CONFIRMED AND IS IN A MID-STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM LAUNCH SITE 98 UR 51.57N 045.336E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH SITE CAN NOW BE CONFIRMED AND REMAINS IN AN EARLY STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 44 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 4031, 17-24 AUGUST 1966 25X1 25X1 TATISHCHEVO ICBM LAUNCH SITE 100 UR 5158N 04544E LAUNCH SITE CAN NOW BE CONFIRMED AND REMAINS IN AN EARLY STAGE OF CONSTRUCTION. NO MISSILES, MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TATISHCHEVO ICBM COMPLEX SUPPORT FACILITY UR 514ON 04534E COMPLEX SUPPORT FACILITY INCLUDES THE ADMINISTRATIVE AND HOUSING AREA AND THE COMMUNICATION FACILITY ON THE EAST EDGE OF TATISHCHEVO IN ADDITION TO THE RAILHEAD AND STORAGE AREA NEAR THE RAIL-TO-ROAD TRANSFER POINT. CONSTRUCTION ACTIVITY CONTINUES IN ALL SECTIONS. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES,-OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ALL 4 POSITIONS APPEAR OCCUPIED. APPROXIMATELY 15 UNIDENTIFIED VEHICLES/PIECES OFEQUIPMENT OBSERVED. ONLY PART OF SITE SUPPORT FACILITY IS COVERED BY PHOTOGRAPHY. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 45 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17?24 AUGUST 1966 AN EXERCISE APPEARS TO BE IN PROGRESS ON EACH PAD ALTHOUGH NO MISSILES ARE VISIBLE. THE 4 PADS CONTAIN A TOTAL OF 4 PROBABLE ERECTORS, 7 POSSIBLE OXIDIZERS, 2 FUEL TRAILERS, AND 9 UNIDENTIFIED VEHICLES/PIECES OF EQUIPMENT. APPROXIMATELY 25 OTHER UNIDENTIFIED VEHICLES/PIECES OF EQUIPMENT ARE SCATTERED THROUGHOUT THE SITE. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NONE OF:THE 4 LAUNCH PADS ARE OCCUPIED. NUMEROUS SMALL VEHICLES/PIECES OF EQUIPMENT ARE OBSERVED AT'THE SITE. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 2 LAUNCH POSITIONS APPEAR OCCUPIED. THE OTHER 2 POSITIONS AND MOST OF THE SITE SUPPORT FACILITY ARE CLOUD COVERED. AT LEAST 5 UNIDENTIFIED VEHICLES/PIECES OF EQUIPMENT OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 46 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17-24 AUGUST 1966 - THE SOUTHEASTERN PAD CONTAINS AN ERECTOR. A POSSIBLE MISSILE ON A TRANSPORTER IS OBSERVED EXTENDING FROM A READY BUILDING. APPROXIMATELY 15 SMALL VEHICLES ARE OBSERVED WITHIN THE SITE. SEVERAL SUPPORT BUILDINGS WITHIN THE SITE ARE PAINTED IN AN APPARENT ATTEMPT AT CAMOUFLAGE. APPROXIMATELY 0.5 NM SOUTH IS AN AREA CONTAINING A SITE SUPPORT FACILITY, FACILITY. SEVERAL BUILDINGS IN THIS AREA ALSO APPEAR TO BE CAMOUFLAGED. FACILITY APPEARS UNCHANGED. AT THE COMMUNICATION FACILITY 5 HORIZONTAL DIPOLES, 2 VEE ANTENNAS, A HARDENED CONTROL BUNKER, AND A HARD SUBSURFACE COMMUNICATIONS ANTENNA ARE OBSERVED. THE LAUNCH PADS ARE NOT OCCUPIED. VERY LITTLE NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. THE SITE IS NOW ASSESSED AS CONTAINING 4 LAUNCH POSITIONS. LAUNCH RING POSITIONS ARE IDENTIFIABLE AT EACH LAUNCH CLEARING. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 47 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17-24 AUGUST 1966 KAPUSTINYAR/VLADIMIROVKA.MSL TEST CTR UR 4835N 04545E NO NEW MISSILE LAUNCH FACILITIES OBSERVED IN CENTER 10 X 40-NM:PORTION OF.THE 50-NM SEARCH AREA. ~- AT LEAST 50 VEHICLES/PIECES OF EQUIPMENT ARE OBSERVED IN AND AROUND THE HOUSING AND SUPPORT AREA AND THE WARHEAD AREAS. NO MISSILES ARE OBSERVED. ~ AT LEAST 25 VEHICLES/PIECES OF EQUIPMENT ARE NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 25X1 KAPUSTIN YAR LAUNCH COMPLEX B UR 4841N 04616E AN UNIDENTIFIED MISSILE UNIT IS ENGAGED IN TRA-MING WEST OF LAUNCH COMPLEX B. IT CONSISTS OF AT LEAST 50 VEHICLES/PIECES OF EQUIPMENT, 1 PROBABLE MISSILE CHECKOUT TENT, 14 PERSONNEL TENTS, AND 1 PROBABLE MESS TENT. INCLUDED AMONG THE VEHICLES ARE FIVE POSSIBLE MISSILE TRANSPORTERS/LAUNCHERS WITH PRIME MO V RS, ONE POSSIBLE MISSILE TRANSPORTER/LAUNCHER WITH UT R E MOVER, TWO E MISSILE TRANSPORTERS WITH PRIME MOVE , POSSIBLE MISSILE TRANSPORTER WITHOUT PRIME MOVER,ONE PROBABLE MISSILE TRANSPORTER (TRAILER COVERING REMOVED) WITH PRIME MOVER UNCOUPLED FROM TRAILER, 2 POSSIBLE MISSILE CHECKOUT VANS CONNECTED TO PROBABLE MISSILE CHECKOUT TENT WITH CABLES, AND APPROXIMATELY 40 ADDITIONAL SUPPORT VEHICLES/PIECES OF EQUIPMENT. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED 48 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 MISSION 4031, 17-24'AUGUST 1966 APPROXIMATELY 45 VEHICLES/PIECES OF EQUIPMENT L NED IN 2 ROWS, 13 PERSONNEL-TENTS, 1 PROBABLE MESS TENT, AND 1 PROBABLE MISSILE CHECKOUT TENT ARE OBSERVED IN THE BIVOUAC AND TRAINING AREA. AT LEAST 5 VEHICLES/PIECES OF EQUIPMENT ARE OBSERVED IN THE LAUNCH AND SUPPORT AREAS OF COMPLEX B. (SEE ATTACHMENT) THE COMPLEX IS ACTIVE WITH EQUIPMENT IN MANY OF.THE AREAS. EQUIPMENT REMAINS ESSENTIALLY THE SAME ON BOTH PASSES UNLESS OTHERWISE SPECIFIED. LAUNCH AREA 1C --~'~- A MISSILE EXERCISE, WITH AN ERECTED PROBABLE SS-41 IS UNDERWAY ON PAD 1C?1. THE NORMAL FUEL, OXIDIZER, AND SUPPORT VEHICLES ARE POSITIONED ON OR NEAR THE PAD. THE CYLINDRICAL OBJECT HAS BEEN REMOVED FROM ATOP THE POSSIBLE ERECTOR STRUCTURE AT 1C-3 WHICH IS PULLED BACK ON THE RAIL LINE FROM THE LAUNCH POINT. NO NEW CONSTRUCTION9 CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED AT LAUNCH PAD 1C-2. A POSSIBLE ERECTOR IS PARKED IN THE 1C FINAL.. CHECKOUT AREA. - A MISSILE EXERCISE IS IN AN EARLY STAGE AT 1C-1. A PROBABLE SS-4 IS ON A TRANSPORTER NEAR THE ERECTOR, SOME SUPPORT VEHICLES ARE ON THE PAD, AND THE FUEL AND OXIDIZER VEHICLES ARE APPROACHING THE PAD ON THE ROAD FROM 1C--3. NO CHANGE:IS NOTED IN 1C'2 OR 1C-3 SINCE LAUNCH AREA 2C -- A TOWER/CRANE AND AT LEAST 3 VEHICLES/PIECES OF EQUIPMENT REMAIN ON PAD 2C-1. NO NEW CONSTRUCTION, CHANGES IN FACILITIES9 OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LAUNCH AREA.3C -- NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 49 TOP SECRET CHESS RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 ^ Declassified in Part - Sanitized Copy Approved for Release 2012/04/27: CIA-RDP03-0014OR000100010039-9 25X1 TOP SECRET CHESS RUFF MISSION 40319 17-24.AUGUST 1966 SILO AT SITE 4C-1 IN AN APPARENT DUPLICATION OF THE MODIFICATIONS AT THE NORTHEAST SILO. EXTENSIONS OF THE SILO COVER RAILS AS WELLAS:CROSSOVER RAILS HAVE BEEN EMPLACED AND AN OPEN FRAMEWORK STRUCTURE IS UNDER CONSTRUCTION ON THE RAIL EXTENSIONS. LENGTH AND WIDTH DIMENSIONS OF THIS STRUCTURE APPEAR THE SAME AS THE 35-FT HIGH STRUCTURE OVER THE