DOLPHIN TRAINING PROJECT (PROJECT OXYGAS)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
06639866
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
1
Document Creation Date:
September 6, 2019
Document Release Date:
September 12, 2019
Sequence Number:
Case Number:
Publication Date:
November 22, 1965
File:
Attachment | Size |
---|---|
DOLPHIN TRAINING PROJECT [15687534].pdf | 36.66 KB |
Body:
Approved for Release: 2019/07/30 C06639866
6.2(d)
MEMORANDUM FOR:
SUBJECT
22NOV
Iges
Deputy Director, Research and
Development, DD/884
Dolphin Training Project
(Project MGM)
1. The DRIP Technical Requirements Board found
the presentation of this subject which you made on 16
November 1965 valuable and interesting. We appreciate
the briefing.
2. You asked that the Clandestine Services
determine if there is a conceptual requirement which
justifies Project OXYGAS. You stated that if the prod.
ject were to be continued, a modified boat would be
needed, and, in about eight to ten months, an opera-
tionally trained Clandestine Services officer should
be assigned to the project to integrate with the
system.
3. The Technical Requirements Board considers
the effort to develop dolphins as emplacement and
retrieval vehicles for use in clandestine operations
warranted under existing conditions. It endorses
DD/S&Tee research and development efforts in this area.
Barring some unforeseen circumstance, the modified
boat and the operations officer needed to integrate
with the operational aspects of the project will be
provided by the Special Operations Division.
4
Chairman
Technical Requirements Board
1 ..................--......1
EXCIiiezi frz.n :rq:71;)
43 r r:
�..
Approved for Release: 2019/07/30 C06639866