TRANSFER OF FUNDS TO THE OFFICE OF NAVAL RESEARCH FOR PROJECT OXYGAS/A (DOLPHINS)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
06636844
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
2
Document Creation Date: 
September 6, 2019
Document Release Date: 
September 12, 2019
Sequence Number: 
Case Number: 
Publication Date: 
September 9, 1965
File: 
AttachmentSize
PDF icon TRANSFER OF FUNDS TO THE [15687564].pdf110.88 KB
Body: 
Approved for Release: 2019/07/30 C06636844 Ulm I 3.3(h)(2) 6.2(d) KEMORANDUM FOR: Director of Logistics SUBJECT REFERENCE 1Ptemp5 / Transfer of Funds to the Office of Naval Research for Project OKYOAB/A (Dolphins) a, ORD Requisition 851-65 dated 27 December 1964 b. Navy Contract NONR 4568(00) 1. The Office of Research and Development requests that funds in the amount of $81,000 be transferred to the Office of Naval Re- search in order that new training facility construction may be ef- fected by Navy on Project OrfOAS/A (reference a & b). 2. The new dolphin training facilities are to be constructed on the U.S. Naval Base at Key west, Florida, The attached maps and draVings provide specific details relating to the proposed con- struction. The Office of Naval Research should be instructed during the course of funds transfer that CIA does not wish to proceed with the construction of building B called for in the attached drawings. 3.� The requirement for the proposed construction of a new dolphin training facility at Key West has been influenced by the following factors: a. The dolphin training program has progressed to a point where simulated operational missions are now necessary. The security arrangements at the existing site at Brassy Key, Fla. are inadequate for this type of endeavor. b. The existing facility at Brassy Key is inadequate from an animal housing standpoint to accommodate the next phase of wort. 4. Of the $81,000 to be used for construction purposes, $66,000 is earmaiqied for basic construction, e.g., animal pens, fencing, piers, etc* $15,000 is for an animal maintenance and storage build- ing including refrigeration for food supplies for the dolphins It will be noted in the attached proposal from that the contractor originally requested $750uwu xor tne construction costs. Subsequent discussions with the contractor have resulted in agreements to have certain additional construction work done at this time which, if delayed further, would result in excessive construe tioncosts.- The proposed subcontractor for the basic construction ilr) F . ot:fi:7- F 1:64 ..:.? GEODP I Enoludad from outman: downgrading and declassificztion Approved for Release: 2019/07/30 C06636844 Approved for Release: 2019/07/30 C06636844 2 SUBJECT: Transfer of Funds to the Office of Naval Research for Project OXTGAS/A (Dolphins) work ($66,000) is , Key West, Fla. This concern was leiected not only because it submitted the lowest construction bid but also because of the high recommendations pro- vided by U.S. Navy officials at Key West, Fla. 5. Detailed coordination meetings on all phases of the planned construction have been held with the Office of Naval Research and Admiral Christopher, Commander of the Key West Naval District. Complete concurrence on these plans has been received from all Navy officials involved. 6. Dr. John Adkins, Assistant Chief Scientist, Office of Naval Research, is the cognizant official on this project. There are no recommended changes In +him nrovioust reporting, or sterility code arrangements. extension 42181 is the project officer on this contract and will monitor its execu- tion. ROBERT N., CR/PMAN Director of Research and Development Attachments 1. Letter proposal plus faellirty sketches, price quotation and :asp of Key West, Fla. 2. acquisition ORD 851-66 CONCURRENCE: 1 6 SEP 1965 Oat. Distribution: Orig. & 1 - Addressee 1 - DD/S&T 2 - DD/SIC RegistryV 1 - LO/DD/S&T LS/ORD/DD/S&T: jah/7822 Deputy Director for Science and Technology 1 - AO/ORD 2 - LS/ORD 1 - ORD Chrono (7 September 1965) Approved for Release: 2019/07/30 C06636844