MODIFICATION SIX DATED 3 APRIL 2007
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
06190274
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
4
Document Creation Date:
March 8, 2023
Document Release Date:
April 10, 2019
Sequence Number:
Case Number:
F-2013-02358
Publication Date:
April 3, 2007
File:
Attachment | Size |
---|---|
![]() | 103.37 KB |
Body:
/ APR...6. 20,07 4:.,26PM
/ler (IC DECEADrIl el/fC
Approved for Release: 2019/03/26 C06190274
No.NO. 9288 P-21). �
oMa Ain* amass
i.CONTAACT ro coDS
AMENDMENT OF SOLIC1TATION/MODIFICATION OF CONTRACT
PAGE 012, FACES
1 1 2
2. pattorPMENTMODIFICAMONNO.
Modification No. Six 05)
E EFFBCFIVE DATE
3 /Medi 2007
4 EragullMotersuitcHABE REQ. NO.
N/A
s. =MR NO. (Vye/1SW
&
1.13U10 BY
1 on EY (ff ghee/1m Donal
at
I NAME AND AGDP.SIS OFCOMBAME (11% rd111 MAW JAW Mark Odd
George WAShington UnlYerSitY
2121 I Street NW .
Suite 701 .
Washington, DC 20052
14
--
IA. AMEM/15111 OFBOLIOTAIION No,
.
40 wasp rap num 10
K
DK MOGIFICATloH or MorrEACIlefianO2 NO.
10B. OATEN= Mina
01 Juno 2004
�
4-1 IFACUriCla
II, THIS ITEM ONLY APPLIES TO IiHerADMENTS OF SOLICITATIONS �
ID The shove =SST eacttolion !sounded met forth in Turn 14, Dia hew end due spziLed Gyre* of O&M le calceded, no! Ma:SC
Offen WWI aariale1e4th itealpt of INbiarOokonl mlor ate Hour and note coated in the tottobotion or al :mended by one of the fallowing methods:
(a) Ey completing hang I and IS, and :owning one (I) eopy or We amok= WI By 4110Adaled; osielpt of His orrendeeni �Oath copy of Oro samhted; or WI By feparde
leiter or cciagem MiloR Warden a Mimeo lo We aoalianon end aynandarnloaniers. FAILURE OF WHIR ACKNOWLEDGMENT TO BE RECEIVED AT THE FLACE
DEIGNED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REfficTION OF YOUR OFFER, If by Arm of des
anoOrent yam dean 10 Waage an offer already aWarnlacd, eucbGNI* may to rode by telegarn or leiter, provided MO iviern Of Mgr Man lefontee La the 1011411011011 and WY
wreadmord. and Is reeked valor to We orina Amur, data soeohled.
12. AMOUNTING emo APPH0F112ATION DATA fiferoebt0 �
N/A
13, THIS ITEM APPLIES ONLY TO MODIFICATIONS OP CONTRACM/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE �Ron u muse rue/unmet uniquiredeeel meow= SETFORTH iiiimM J4AREMADB M THE coNTRAcT oRPER NO. IN
B. TEE ABOVEMMHG= CO(THACGOGDGB IS Maim= To assuscr nes Ani.n,esTsgrws omen MA anhillun palkillqm trniVrialitx gat, tr.) SU ForrN IN
ITEM 14, PURBU AM' TO IlfHornioAITY
Te110 SUPPLEMENTAL eAREEMENTMENTIMED INTO PURSUANT TO AUTHORITY OF:
MDR41 Agreement of the parties
P. OTHER Swale om ofecolimetio Col ourfveice
13, IMPORTANT: Contractor 0 iA nog. Is required to sign this document and return copy to the issuing office.
14, GESCRIMICIN OF AMENDoismMODIRCATIONIOrteedudOr ernerifoo hopaos4 14,10411oHrIMITheAVVINVI OVUM mak rideorePeVitleJ
See Page 2.
beard stdddrNol MS,uS iorim god eopgddrp el lit thydrsr rekreard lq is 9A or 104, Ism we dhaddert rotor wand* S nM faddlunt dartd.
UALNAME ANDY= OF SWIM am. ortnil
ttaroldN. Gollos, Managing Director,
. Research Support & Analysis
ISE. CO VOFFEROR
NSN 7S40.tii.1514070
PREvIGGSEDMON UNLISAELE
ISC. DATE SIGNED
Ithie*
lax NAME AND null DF CONTRACTING OFRCER (f)fle erwlaa
03. UN/TED S7ATBS OF AMERICA
raid:Was ddr GT
lac. nAra MOM
Isms STANDARD FORM 30 (REV. 10-83)
Conon Maenad � Priceofted CLHA
FAR OM CHU 53.241
ft..N/0
(b)(3,
(b)(3;
(b)(3)
(b)(3)
(b)(6)
Approved for Release: 2019/03/26 C06190274
Approved for Release 2019/03/26.006190274
� E-;
George Washington University
Contract No:;
Modification No. 6
Page 2 of 2
This Contract may be executed in counterparts, each of which shall be deemed an original, all of which together
shall constitute one and the same instrument. Facsimile signatures will be regarded as authentic by all parties.
A. The purpose of Modification Six (6) iS to accomplish the changes as follows:
1. Decrease LOE hours from 5,916 by 522 to 5,394 and shift funding associated with the LOE reduction
($15,211) to document acquisition.
B. Remove and substitute pages indicated below, attached hereto and a part of hereof:
Remove Page Insert Page
2 2
C. Except as indicated above, all other terms and conditions remain unchanged and in full force and effect.
(b)(6)
UNCLASSIFIED
Approved for Release: 2019/03/26 C06190274
Approved for Release: 2019/03/26 C06190274
UNCLASSIFIED
B.1
George Washington University
Contract Number
Page 2 of 29
A.1
SECTION A - SOLICITATION/CONTRACT FORM
Use of Facsimile Signatures (JUN 2002)
This Contract document may be executed in counterparts, each of which shall be deemed an original, all
of which together shall constitute one and the same instrument. Facsimile signatures will be regarded as
authentic by all parties.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
Type of Contract and Consideration (FFP-LOET) (OCT 2003)
a) This is a Firm Fixed Price Level-of-Effort Term Contract as identified in FAR 16.207. The total price
or full performance hereunder is $257,577
From
By Mod 6 (Option Yr 2)
Total
FFP/LOE
$298,514 257,577
$ (10,937)0
$257,577 I
Hours
6,786 5,916
1870)1522)
6,846 5,394
POP
01 June 2004- 31 May 2007
01 June 2006� Si May 2007
01 June 2004 � 31 May 2007
Note: The current year's LOE hours are being reduced by 522 hours and funds associated with
those LOE hours are being allocated to document acquisition.
(b) The Contractor shall expend its best effort towards accomplishing the work outlined in the clause
entitled "Scope of Contract". The level-of-effort required for total performance under this contract is a
minimum of labor hours and a maximum of labor hours as stated below.
+/- 3% Swing
From
By Mod 6
Total
Minimum
6,662 5,738
46444 (5061
5,738 5,232
Target
6,786 5.916
(870).15221
5,9445,394
Maximum
6,890 6,094Ali4641538)
6,094 5,556
�
(c) The estimated composition of the total labor-hours under this contract is as follows:
Labor Category
Base Year
Option Year 1
Option Year 2
Cataloguer (Chinese Language)
2,088
1,740
24E41,566
Total
2,088
1,740
2,088 1,566
(d) The Contractor shall continually evaluate the total level-of-effort required and recommend to the
Govemment changes thereto which are considered beneficial in attaining the overall objectives of this
contract. In controlling the utilization of labor-hours, the Contractor shall promptly notify the Contracting
Officer, in writing, when there is an indication that premature exhaustion of the total labor-hours is
predicted.
1
(b)(6)
(b)(6)
(b)(6)
UNCLASSIFIED
This page last modified by Modification.4 MOD 6 to Contract
Approved for Release: 2019/03/26 C06190274
(b)(6)
Approved for Release: 2019/03/26 C06190274
Approved for Release: 2019/03/26 C06190274 �