AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - NO. 10
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
06140489
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
10
Document Creation Date:
December 28, 2022
Document Release Date:
March 20, 2017
Sequence Number:
Case Number:
F-2011-01076
Publication Date:
May 18, 2009
File:
Attachment | Size |
---|---|
![]() | 355.47 KB |
Body:
JUL. I. 2 1 Ull 2 1 Fl%Pm KAY I HEUNImpicTs
Approved for Release: 2017/03/15 C06140489
PIU. JO)-
, �0E1 F. L/ I I ,
1.1-eLtu
AMENDMENT OF 50LICITATION/MODSCATTON OF CONTRACT
2. AMENDHENTIMODIPICATION NO.
Modification No. 10
1 3. EFFECTIVE DATE
7 June 2010
7
8. ISSUED ey cope
C1O/ITAS/IMS r.onfesertee
(b)(3)
Washinoton3 D.C. 20505
8. nwmgAto ADDRC-SS OF CONTRACTOR No. Mat, county, &Me eadZIP; Cods)
Raytheon
205 Van Buren Street. Suite 300
Hemdon VA 20170
CODE
(b) 3)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF S ii CITATIONS
coNTRACT ID CODE
EIEDuIsITIDN/PURCHASS !EQ. NO.
7. egumcrEFIED Err et eteelese Item 53
FACILITY COPE
PACE OP PAGES
10
PROJECT NO. (Je apsPetzelo)
CODE
9A. AMENDMENT OF SOLICITATION NO,
X
DATED (SEE arm Iv
(b)(3)
1DA- MODIFICATION OF CONTRAcNORDER NO- (b)(6)
20104'05144161�000
JOEL OATED (SE E ITEM IS)
18 Mav 2009 '
O The above numbered solicitation ;$ amended es set forth In item 14. The hour and date specified for receipt
Were must acknowledge receipt of this amendment prior to the hour and dale specified In the sellegatlen ores a
(a) By soMPleIME Itemc 8 arid 15, and npunIng pne (1) copy of The amendment; (b) By acknowledging =skit of
(e) Sy separate bettor or telegram which Includes a reference to the solicited,* and amendment numbers. -
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND
YOUR OFFER. Jr by Awe of this amendment you desire to change an offer already submitted, such change may
or fetter males reference to the solicitation and this amendment, and is received prior to the opening hour and da
12. ACCOUNTING AlsID APPROPRIATION DATA (71 rat/II/red)-
Increase the contract value from
Offers Ej Is eatendOd. is not extended.
nded, by ono of the following methods:
a amendment on each copy of the offer .5314/1111e4I or
AILLIRE OF YOUR ACKNOWLEDGMENT TO SE -
TA SPECIFIED MAY RESULT IN REJECTION op
mode by telegram Or letter. PrOvided each telegram
pacified.
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONT
IT MODIFIES TI-I CONTRACT/ORDER NO. AS DESCRIBE
ACTS/ORDERS,
IN ITEM 14.
II)
A. 'MS CHANGE ORDER IS iSSUED PURSUANT TO; (Seed27Issbesty) THE CHANCES SET FoRn1 IN ITEM 14
S IN THE CONTRACT ORDER NO. IN ITEM 104,
B. THE AEOvE NUmBERP_C CoNtrtAcTroppER is MODIFIED TO REFLECT THE ADMIMsTRATN3 CHANGES Ouch
FORTH IN ITEM 4. PuRSUANT TO THE AUTHORiTY OF FAR 43.1030).
chews It telyteg offhe. eepropehdes date, eta) SET
X
C. THIS SUFPLENENTAL AEREEMbrif IS ENTERED INTO PURsUNT TO AUTHORITY OF;
FAR 43,403(a)
OTNER Spesiry type of ircaficaticii and aulnerhY)
E. IMPORTANT: Contractor is not. X is required to sign this document and return 1
opy to the Issuing office.
14- DESCRIPTION OF AMENDMEV17M00IFICATION (Orgonixed AY ucF Aldo ilseertca bletudfrie aesesobnkanirecreuslee
See Page 210
Except at proxiaed herein. all lOrMe and ecridllicne of the decurnent reforoncad In Rem SA or 10A, an heretofore shunned. famine end
15A. NAME AND 111LE OF sioNER (rype or prinQ
0.0 A rd.-44S M a� A & i Cir
rrc.rreer-Tnniecrp,,,A 150. DATE SIGNED
it.
18A. NAME AND TITLE OF CO
MY whore abseils)
d In full force and effacc
CTING OFFICER (Typo et gin�
(b)(4)
(b)(3
100. DATE SIGNED
(b)(6)
2.teica
(b)(3)
(b)(6)
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 2 of 10
152.204-721 Use of Facsimile Signatures (JUN 2002)
The Contract document may be executed in counterparts, each of which shall be deemed an original, all
of which together shall constitute one and the same instrument. Facsimile signatures will be regarded as
authentic by all parties.
A. The purpose of Modification No. 10 to contract 2010*0514416*000 is:
1) Increase the contract value
2) Increase the level of effort
3) Incorporate revised Statement of Work dated'
4) Incorporate Contractor's proposal dated
and
B. As a result, the following changes are hereby made:
1. Clause B.1 152.216-748 Type of Contract and Consideration (CPAF-LOET) (JUL 2007) paragraphs (a),
(b), and (e) are revised as follows:
(a) This is a Cost-Plus-Award-Fee (CPAF) Level-of-Effort Term (CPAF-LOET) type contract as
described in FAR 16.305 in the total estimated amounts set forth below.
jII
1,0 blility:e?
Oifit-tit:4101
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
CLIN 02
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
TOTAL BASE PERIOD
G?nT�taI BASE
PLUSLORTlONS
CLIN 01
From
ECP 1
To
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
CLIN 02
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(3)
(b)(4)
UNCLASSIFIED
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 3 of 10
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
TOTAL CPAF
(BASE + OPTIONS)
The Government reserves the right to exercise the priced options shown in the table below.
The right to exercise said options shall be on or before thirty (30) calendar days prior to the
commencement of each option period of performance. These options shall be the exclusive
right of the Government and are subject to availability of funding.
7f Felitiiaiji.26 Folittiary:Z12 .. ,2'
. - _j
11-116
..r. r:-,
-if.,
CLIN 01
From
ECP 1
To
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
CLIN 02
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
TOTAL OPTION 01
'1-15tr9;Xtig:.:3 :. , , __ _ :
- FilirtarY,201'2A filEelifira .201 ''''' -....
- �
.
..:
CLIN 01
From
ECP 1
To
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
CLIN 02
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
TOTAL OPTION 02
17:Febriiari;r201316 FebiLisa 2614'
,
CLIN 01
From
ECP 1
To
Estimated Cost:
(b)(4)
(b)(3)
(b)(4)
(b)(3)
(b)(4)
(b)(3)
(b)(4)
UNCLASSIFIED
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
UI'lI.e LJ.1.J �O IF i
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 4 of 10
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
CLIN 02
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
TOTAL OPTION 03
, 7:Ebliiiiiiij2014,16 Febrild' 2
:
CLIN 01
. IITo
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
CLIN 02
Estimated Cost:
Base Fee:
Maximum Award Fee:
Total Estimated CPAF:
TOTAL OPTION 04
(b) Award fee shall be available for consideration of payment under the terms of the "Award Fee
Provisions" set forth under attachment 3 of this contract. The availability of maximum award fee
dollars, with respect to the evaluation periods, is as follows:
1
17 Feb 2010-6 August
2010 (Base)
2
7 Aug 2010-16 Feb
2011 (Base)
Total
:W40.1
Fee'
(e) Level-of-Effort for Base and Option Periods:
(1) The level-of-effort required for the base period is a minimum cI111IIIIIlabor hours and a maximum of
abor hours. The estimated composition of the total labor hours for the base period is as
follows:
B-a"-e- erio fft:PliOURS-:2/1 7/1 0;2/-1 6/1. iz
-
CLIN 1
CLIN 2
Labor Category
Hours
Labor Category
Hours
(b)(4)
(b)(3)
(b)(4)
(b)(3)
(b)(4)
(b)(4)
(b)(4)
UNCLASSIFIED
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
Ural. �LPUOJII-
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 5 of 10
IM SE1 - ENGR I
IM SE1 - ENGR 1
IM SE2 - ENGR II
IM SE 2 - ENGR II
IM SE3 - SR ENGR I
IM SE3 - SR ENGR I
IM SE4 - SR ENGR II
IM SE 4 - SR ENGR II
IM SE5 - PRN ENGR
IM SE5 - PRN ENGR
IM SE7 - DIRECTOR I
IM SE 7- DIRECTOR I
IM SN1 - NE ENTRY
IM SN 1 - NE ENTRY
IM SN4 - NE SPECIAL
IM SN 4- NE SPECIAL
R2 AE2 - ENGR II
R2 AE2 - ENGR II
R2 AE3 - SR ENGR I
R2 AE3 - SR ENGR I
SO 1E5
SV 01X - IC Clin 2
SV 01W - IC Clin 1
SV 01Y - Vaxcom
HRS
SV 0E02C - ENGR II-
C
SV 0E02C - ENGR II-
C
SV 0E02D - ENGR II-
D
SV 0E02D - ENGR II-
D
SV 0N65C - ASSC-C
SV 0N75B - ASSC
SR-B
SV 0N650 - ASSC-D
SV 0N75C - ASSC
SR-C
SV 0N758 - ASSCSR-
B
SV 0N75D - ASSC
SR-D
SV 0N75C - ASSCSR-
C
SV 0N95A - SPCST
SR
SV 0N75D - ASSCSR-
D
SV 0N95B - SPCST
SR
SV 0N85B- SPCST-B
SV 0N85C- SPCST-C
D/L Total
ECP TOTAL
Original Proposal
'-diiMb-1151,-11..
(2 -of-effort required for option period 1 is a minimum
abor hours. The estimated composition of the total labor hours or the first option period is as
o ows:
bor hours and a maximum of
OPtion H
� � to"
CLIN 1
CLIN 2
Labor Category
Hours
Labor Category
IM SE1 - ENGR I
IM SE2 - ENGR II
IM SE3 - SR ENGR I
IM SE4 - SR ENGR II
IM SE5 - PRN ENGR
IM SE7 - DIRECTOR I
IM SN1 - NE ENTRY
IM SE1 - ENGR 1
IM SE 2 - ENGR II
IM SE3 - SR ENGR I
IM SE 4 - SR ENGR II
IM SE5 - PRN ENGR
IM SE 7-DIRECTOR I
IM SN 1 - NE ENTRY
Hours
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
UNCLASSIFIED
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
UNt�LHootricu
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 6 of 10
IM SN4 - NE SPECIAL
R2 AE2 - ENGR II
R2 AE3 - SR ENGR I
SO 1E5
SV 01W - IC Clin 1
SV 0E02C - ENGR II-
C
SV 0E02D - ENGR II-
D
SV 0N65C - ASSC-C
SV 0N65D - ASSC-D
SV 0N75B - ASSCSR-
B
SV 0N75C - ASSCSR-
C
SV 0N750 - ASSCSR-
D
SV 0N85B- SPCST-B
SV 0N85C- SPCST-C
D/L Total
EC P TOTAL
Original Proposal
IM SN 4- NE SPECIAL
R2 AE2 - ENGR II
R2 AE3 - SR ENGR I
SV 01X - IC Clin 2
SV 01Y - Vaxcom
HRS
SV 0E02C - ENGR II-
SV 0E02D - ENGR II-
SV ON75B - ASSC
SR-B
SV ON75C - ASSC
SR-C
SV ON75D - ASSC
SR-D
SV 0N95A - SPCST
SR
SV ON95B - SPCST
SR
(3) The level-of-effort required for option period 2 is a minimum o labor hours and a maximum of
labor hours. The estimated composition of the total labor hours for the second option period is
as follows:
CLIN 1
1
CLIN 2 �
Labor Category
Hours
Labor Category
Hours
IM SE1 - ENGR I
IM SE1 - ENGR 1
IM SE2 - ENGR II
IM SE 2 - ENGR II
IM SE3 - SR ENGR I .
IM SE3 - SR ENGR I
IM SE4 - SR ENGR II
IM SE 4 - SR ENGR II
IM SE5 - PRN ENGR
IM SE5 - PRN ENGR
IM SE7 - DIRECTOR I
IM SE 7- DIRECTOR I
IM SN1 - NE ENTRY
IM SN 1 - NE ENTRY
IM SN4 - NE SPECIAL
IM SN 4- NE SPECIAL
R2 AE2 - ENGR II
R2 AE2 - ENGR II
R2 AE3 - SR ENGR I
R2 AE3 SR ENGR I
SO 1E5
SV 01X - IC Clin 2
SV 01W - IC Clin 1
SV 01Y - Vaxcom
HRS
SV 0E02C - ENGR II-
C
SV 0E02C - ENGR II-
C
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(h)(41
(b)(4)
UNCLASSIFIED
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
1.11`4%.� 1.41�Jul ILE Imf
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 7 of 10
SV 0E02D - ENGR II-
D
SV 0E02D - ENGR II-
D
SV 0N65C - ASSC-C
SV 0N75B - ASSC
SR-B
SV 0N650 - ASSC-D
SV 0N75C - ASSC
SR-C
SV 0N75B - ASSGSR-
B
SV 0N75D - ASSC
SR-D
SV 0N75C - ASSCSR-
C
SV 0N95A - SPCST
SR
SV ON75D - ASSCSR-
D
SV ON95B - SPCST
SR
SV 0N85B- SPCST-B
SV 0N85C- SPCST-C
D/L Total
EC P TOTAL
Original Proposal
he level-of-effort required for option period 3 is a minimum o abor hours and a maximum of
bor hours. The estimated composition of the total labor hours for the third option period is as
tit& -dtrik-S72/11/4Slitit
,
CLIN 1
CLIN 2
Labor Category
Hours
Labor Category
Hours
IM SE1 - ENGR I
IM SE1 - ENGR 1
IM SE2 - ENGR II
IM SE 2- ENGR II
IM SE3 - SR ENGR I
IM SE3 - SR ENGR I
IM SE4 - SR ENGR II
IM SE 4 - SR ENGR II
IM SE5 - PRN ENGR
IM SE5 - PRN ENGR
IM SE7 - DIRECTOR I
IM SE 7- DIRECTOR I
IM SN1 - NE ENTRY
IM SN 1 - NE ENTRY
IM SN4 - NE SPECIAL
IM SN 4 - NE SPECIAL
R2 AE2 - ENGR II
R2 AE2 - ENGR II
R2 AE3 - SR ENGR I
R2 AE3 - SR ENGR I
SO 1E5
SV 01X - IC Clin 2
SV 01W - IC Clin 1
SV 01Y - Vaxcom
HRS
SV 0E02C - ENGR II-
SV 0E02C - ENGR II-
C
SV 0E02D - ENGR II-
SV 0E02D - ENGR II-
SV 0N65C - ASSC-C
SV ON75B - ASSC
SR-B
SV 0N65D - ASSC-D
SV 0N75C - ASSC
SR-C
SV 0N75B ASSCSR-
SV 0N75D - ASSC
B
SR-D
SV 0N75C - ASSCSR-
SV ON95A - SPCST
(b)(4)
(b)(4)
(b)(4)
UNCLASSIFIED
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
UNCLASSIFIED
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 8 of 10
SV 0N75D - ASSCSR-
D
SV 0N85B- SPCST-B
SV 0N85C- SPCST-C
D/L Total
ECP TOTAL
Original Proposal
SR
SV ON95B - SPCST
SR
(5) vel-of-effort required for option period 4 is a minimum of bor hours and a maximum of
abor hours. The estimated composition of the total labor hours for the fourth option period is
as follows:
.. , �
.4:01156,44�14-011W2/1.7/14742/f:'E. -,.� ''"
,-:4.�:�vt..,-,-,,,,�,,,,,,..�:��,,,,--A,;:�4�..,447.�,,::.::,,.
...
CLIN 1
CLIN 2
Labor Category
Hours
Labor Category
Hours
IM SE1 - ENGR I
IM SE1 - ENGR 1
.IM SE2 - ENGR II
I IM SE 2 - ENGR II
IM SE3 - SR ENGR I
IM SE3 - SR ENGR I
IM SE4 - SR ENGR II
IM SE 4 - SR ENGR II
IM SE5 - PRN ENGR
IM SE5 - PRN ENGR
IM SE7 - DIRECTOR I
IM SE 7- DIRECTOR I
IM SN1 - NE ENTRY
IM SN 1 - NE ENTRY
IM SN4 - NE SPECIAL
IM SN 4- NE SPECIAL
R2 AE2 - ENGR II
R2 AE2 - ENGR II
R2 AE3 - SR ENGR I
R2 AE3 - SR ENGR I
SO 1E5
SV 01X - IC Clin 2
SV 01W - IC Clin 1
SV OlY - VaXcom
HRS :
SV 0E02C - ENGR II-C
SV 0E02C - ENGR II-
C .
SV 0E02D - ENGR II-D
SV 0E02D - ENGR H-
D
SV 0N65C - ASSC-C
SV ON75B - ASSC
SR-B
SV 0N65D - ASSC-D
SV 0N75C - ASSC
SR-C
SV 0N753 - ASSCSR-B
SV 0N75D - ASSC
SR-D
SV 0N75C - ASSCSR-C
SV 0N95A - SPCST
SR
SV 0N75D = ASSCSR-D
SV 0N95B - SPCST
SR
SV 0N856- SPCST-B
SV 0N85C- SPCST-C
D/L Total
1
ECP TOTAL
(b)(4)
kiwt)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
UNCLASSIFIED
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
� UNCLASSIFIED
" Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 9 of 10
Original Proposal
(6) The summary of level-of-effort required for the Base plus all option periods is a minimum of
labor hours and a maximum of labor hours. The estimated composition of the total labor
hours for the entire contract is as o ows:
A3-gint19;z161,10K
Minimum (-3%):
Target 1
Maximum (+3%)
,iti-0/1'.i.':-''''' ,-
-"--4
ECP
.,.... ,7..
Minimum (-3%)
Target
Maximum (+3%)
rOlitiViis0-221.1111.2r.--
L.,2/101
zhirxt..,,,,,,-4. -- ..,--, .a.,
,...-k- --,,,
,-1.4-,..,�24---i
Minimum (-3%)
Target
Maximum (+3%)
=2/1-7/1:4'.'�'-' , ''' '-!
' ' ni 1:
.- -,-e -
:,,,...
Minimum (-3%)
(-3%)
Target
Maximum (+3%)
79131rarri-94L2117114-4-' '
' irr. - -
E
,
_2/16/15 ' .'
-,
,_
Minimum (-3%)
Target
Maximum (+3%)
cdRe#I9E:(10filltE '
7Pliiiir.:'�'
--, -4...
_.,...-.: -. .
4:1
Minimum (-3%)
Target
Maximum (+3%)
2. Clause C.1 152.211-701 Statement of Work (OCT 2003) is hereby revised and read as follows:
The Sponsors Statement of Work entitled Statement of Work for Support to Information
Review and Release (SIRR), dated 07 March 2008, updated 01 July 200, revised 09 July 2009,
revised 02 December 2009, revised 26 February 2010, revised 07 April 2010 which is
incorporated by reference or attached hereto, is made a part of this contract.
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
(b)(4)
11Alt9 Accipirn
Approved for Release: 2017/03/15 C06140489
Approved for Release: 2017/03/15 C06140489
UNCLASSIFIED
Raytheon
Contract No.: 2010*0514416*000
Modification No. 10
Page 10 of 10
3. Section J List of Attachments is hereby revised to include:
1) Statement of Work revised 07 April 2010,
2) Contractor's proposal dated 12 April 2010.
C. All other terms and conditions of the contract remain unchanged and in full force and effect.
Approved for Release: 2017/03/15 C06140489