115 CONTRACTING BY NEGOTIATION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
05896720
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
33
Document Creation Date:
December 28, 2022
Document Release Date:
March 20, 2017
Sequence Number:
Case Number:
F-2011-01076
Publication Date:
September 14, 2004
File:
Attachment | Size |
---|---|
![]() | 1.28 MB |
Body:
Approved for Release: 2017/03/15 C05896720
115 CONTRACTING BY NEGOTIATION
115.0 SCOPE
�
115.000 Scope of part.
(U) This part prescribes policies and procedures governing competitive and noncompetitive
negotiated acquisitions.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.1 SOURCE SELECTION PROCESSES AND TECHNIQUES
115.101 Best value continuum
(U) Agency contracting officers may utilize one or any combination of the processes identified in
FAR Subpart 15.101. Acquisition professionals must select a process and tailor it to meet the
requirements of the specific acquisition.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.101-2 Lowest price technically acceptable source selection process
(U) (b)(1) A contracting officer shall not refer determinations that a small business' past
performance is not acceptable to the Small Business Administration as required in FAR
15.101-2(b)(1).
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.2 SOLICITATION AND RECEIPT OF PROPOSALS AND INFORMATION
115.201 Exchanges with industry before receipt of proposals
(U) (a) Acquisition professionals are encouraged to participate in the exchanges discussed in
FAR 15.201. Exchanges shall be in accordance with applicable security procedures.
(U) (c) Contracting officers shall issue complete draft RFPs, which include Sections B through M
and a Statement of Work, for all competitive solicitations equal to or greater than $1,000,000
on an annual basis. Draft RFPs shall be coordinated with Security personnel. Contracting
officers should allow at least 15 business days from the date of release for offerors to respond
with comments on the draft RFP. Contracting officers are also encouraged to advise prospective
offerors of the RFP's status.
(U) (d) The Agency is not required to provide either special notices of procurement matters or
electronic notices to publicize the Government's requirement or solicit information from industry
as prescribed in FAR 5.205 (See CCM 105.0).
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
(U) (f) During the interval between the submission of the procurement request and award of a
contract, discussion of the procurement with prospective contractors and the transmission of
technical or other information shall be conducted only by the contracting officer or other
personnel specifically designated by the contracting officer for that purpose. FAR Subpart
15.306 addresses other limitations on exchanges before award.
CCM Release Number: 2005-7
Release Date: 5/19/2005
115.201-70 Other exchanges with offerors before receipt of proposals.
(U) (a) For sole source procurements, and when otherwise appropriate, contracting officers may
provide opportunities for incumbent contractors to collaborate on the development of technical
requirements and statements of work.
(U) (b) Contracting officers shall generally not advise offerors of the amount of funds
programmed for a particular requirement. However, when the contracting officer and COTR
cannot precisely define the scope of work, (for example, procurements involving basic research,
exploratory development, or studies) the contracting officer may set forth the Agency's level-
of-effort estimate and/or the amount of funds available for the procurement.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.202 Advisory multi-step process.
(U) (a) Consistent with CCM 105.0, contracting officers shall not publish presolicitation notices
in the GPE or use such notices as a method to determine a competitor's viability. Market
research is the appropriate method for developing a bidders list.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.203 Requests for proposals.
� (U) (a) Requests for Proposals (RFPs) shall be prepared by the contracting office, with
assistance from technical and other offices as required, and issued by the contracting officer.
The RFP shall contain all information necessary to enable a prospective offeror to prepare a
proposal properly, including a statement of work, specifications, and proposed contract work
breakdown structure. All information shall be set forth in full text in the solicitation document,
except for clauses, provisions, and other supporting documents that the contracting officer has
determined are appropriate for incorporation by reference. Contracting officers base their
decision to incorporate text by reference upon FAR guidance, security concerns, and general
availability.
(U) (a)(3)
of drit
When
the contracting officer plans a competitive procurement requiring submission
and pricing data, the contracting officer is encouraged to request audit
(FIN
review and comment on the RFP's Section L instructions concerni
ice
(b)(3)
If a cost reimbursable contract is contemplated, then FIN
proposal
hould
(b)(3)
preparation.
be contacted to
assure the contractor is capable of contracting on a cost reimbursement basis.
Contracting officers
may also request that FIN assist in performing a pre-award survey
(b)(3)
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
when they issue solicitations to new vendors. The pre-award survey will assure that the vendor
is financially viable and has appropriate cost accounting systems in place to perform the
prospective contract type (See CCM 109.106-1).
(U)(b) Per CCM 107.301, the procedures set forth in OMB Circular A-76 do not apply to the
Agency.
CCM Release Number: 2005-8
Release Date: 8/31/2005
115.203-70 Use of non-government advisors.
(U) (a) When appropriate, contracting officers may request approval to use non-government personnel as
advisors to assist the Agency to prepare solicitations and/or evaluate proposals. The advisors shall participate
as non-voting members. Normally, the Agency permits outside advisors to evaluate only technical/management
proposals.
(1) The contracting officer shall prepare the request to use non-government advisors'
assistance. The contracting officer submits the request to the cognizant Source Selection
Authority in sufficient time to arrange for the individual's services once the request is
approved. The contracting officer, COTR, and the Source Selection Authority shall sign
the request. The request shall include the following information:
(i) The identity of the required individual(s), by name if known.
(ii) The current employment status of such individual(s) and comment on any
potential financial or organizational conflict of interest and the competitive
relationship, if any, between the prospective prime contractors (and their
subcontractors) and the prospective non-government advisor(s).
(iii) A justification of the need for outside advisory assistance by providing
specific details of the solicitation requirements which explain the necessity to
supplement internal expertise with non-government experts.
(iv) Summarize the scope of the services the advisors will perform and provide
the following as attachments to this request:
(A) For solicitation preparation services - a copy of the Statement of Work
describing the duties and responsibilities of the non-government advisors.
(B) For proposal evaluation services - those portions of the Source
Selection Plan and the solicitation itself which describe the duties and
responsibilities of the non-government advisors.
(2) Upon approval of the use of non-government advisors, the contracting officer shall:
(i) Make all arrangements (including contracts or purchase orders, as necessary)
for acquiring the advisor's services.
(ii) Brief the non-government advisors on: non-disclosure of proprietary proposal
information, organizational conflicts of interest and potential limitation on future
contracting opportunities, and obtain completed and signed Confidentiality
Agreement and Conflict of Interest Certification and Non-Disclosure Agreement
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
forms from each non-government advisor. A blank copy of this form is in Part 109
of the CCG. Contracting officers must use the Agency standard form unless the
Source Selection Authority approves another form.
(iii) Brief the advisors on their duties and responsibilities as specified in the
Statement of Work or Source Selection Plan. Emphasize that, as proposal
evaluators, they shall not score the proposals they review but shall confine their
assistance to such activities as:
� Providing expert analyses of proposals, including the identification of strengths
and weaknesses;
� Generating clarification requests, deficiency requests, and discussion questions;
and
� Recommending which offerors should be in the competitive range.
(iv) Upon receipt of all the appropriate certifications, ensure the delivery of all
proposal materials, the Source Selection Plan, Section M of the solicitation, and
any other evaluation materials as required.
(v) Obtain a debriefing certificate from each advisor upon conclusion of the
evaluation process (See CCG Part 109 for a sample).
(vi) Ensure that the solicitation contains the appropriate language regarding the
use of non-government advisors as proposal evaluators (See CCM 152.215-728,
Evaluation by Consultants) and act as the sole point of contact between
prospective contractors and Agency personnel for questions concerning the
propriety of using outside advisors.
CCM Release Number: 2005-8
Release Date: 8/31/2005
115.204 Contract format.
(U) It is Agency policy that all solicitations contain a cover letter.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.204-5 Part IV - Representations and Instructions.
(U) (b) Section L shall note that a Past Performance questionnaire will be used to collect past performance
information. The solicitation shall include a past performance questionnaire in Section J, tailored to the specific
past performance evaluation factors of the acquisition, that will document information received from references.
Past performance information pertaining to a subcontractor (or teaming partner) cannot be disclosed to a
private party without the subcontractor's consent. Because a prime contractor is a private party, the
Government needs to obtain consent before disclosing the subcontractor's past performance information to the
prime contractor during exchanges with offerors after receipt of proposals. Section L shall instruct the prime
contractor to submit the consent of all subcontractors, identified in the past performance volume of the proposal,
along with the prime's proposal. The solicitation shall include a sample consent letter in Section J. An exemplar
consent letter is available in CCG Part 115, Subcontractor Consent Letter.
(U) (c) Section M, Evaluation Factors, is only required in competitive solicitations. FAR
provision 52.212-2 contains a template for commercial item evaluation factors, although the
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
same principles apply as described herein for Section M. Section M is a critical part of the
competitive solicitation since it defines the evaluation process and evaluation factors to the
offerors. The contracting officer develops Section M from the Source Selection Plan. The
Section M evaluation criteria should list the criteria in descending order of importance and must
be consistent with the Source Selection Plan.
CCM Release Number: 2007-17
Release Date: 3/30/2007
115.205 Issuing solicitations.
(U) (a) Before issuing any solicitation, the contracting officer shall ensure that the following
actions have been completed:
(1) All necessary approvals have been obtained and an Operating Official has indicated,
in a funding document or a memorandum stating availability of, the amount of funding
available for the contemplated procurement; and
(2) If the proposed procurement is competitive, a Source Selection Plan (SSP) has been
prepared and approved. Contracting officers may find detailed guidance concerning the
content and format of a SSP in the CCG Part 115 Source Selection Plan template.
(3) Legal review requirements in Section 107.7100 have been met.
(4) The security requirements in Subpart 104.4 have been met.
CCM Release Number: 2004-2
Release Date: 9/26/2005
115.207-70 Handling proposals, information, and non-disclosure agreements.
(U) (a) Non-disclosure agreements are agreements between individuals and a commercial
corporation or the government under which a party agrees not to use certain information
provided by the corporation or the government for any purpose other than that for which the
information was provided. Non-disclosure agreements would be appropriate for use, for
example, when non-government advisors assist in evaluating proposals. The non-government
advisors shall sign a non-disclosure agreement with the Agency whereby they agree not to use
any of the proposal information for any purpose other than the evaluation on behalf of the
government. Offerors submitting proposals. may also want to require a non-disclosure
agreement between the non-government advisor and the offeror. (See CCG Part 109 for the
Agency standard non-disclosure agreement that the non-government advisor must sign).
(U) (b) A commercial entity may request that Agency personnel sign non-disclosure agreements
prior to conducting business or briefings which involve proprietary information or trade secrets.
Since the use of non-disclosure agreements may subject the Agency or its employees to liability,
such non-disclosure agreements shall be coordinated with CLD/OGC before signing.
CCM Release Number: 2004-2
Release Date: 9/15/2004
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
SOLICITATION AND RECEIPT OF
PROPOSALS AND INFORMATION
115.209-70 Solicitation provisions and
contract clauses.
Date Releases: 06/22/2006
(U) (a) Except as noted below, the contracting
officer shall include the solicitation provisions and
contract clauses referenced in FAR 15.209 in
contracts and solicitations as appropriate:
(1) The contracting officer shall insert the
clause at 152.215-700, Audit and Records
- Negotiation, or Alternate II thereto, in
lieu of FAR clause 52.215-2 or Alternate II
thereto. The conditions for use are the
saine as those set forth at FAR
15.209(b)(1) and 15.209(b)(3). The
Agency specific clauses remove the
paragraph allowing access to the records
by the Comptroller General.
(2) Use clause 152.215-720, Intention to
Use Consultants, in solicitations and
contracts when the use of non-government
advisors will be required. Contracting
officers place this clause in Section H for
non-commercial contracts or in the
addenda for commercial contracts. See
CCM 115.203-70 for guidance on use of
non-government advisors.
(3) Use clause 152.215-728, Evaluation
By Consultants, in solicitations when
non-government advisors will be required
to assist with the evaluation of proposals.
Contracting officers place this provision in
Section H for solicitations. See CCM
115.203-70 for guidance on use of
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
non-government advisors.
(4) Use clause 152.215-724, Key
Personnel, in cost-reimbursement,
time-and-materials, labor-hour, or
fixed-price level-of-effort solicitations and
contracts when it is determined that it
would be in the Agency's best interests to
have the key management, technical, and
administrative personnel identified.
Contracting officers place this clause in
Section H for non-commercial contracts.
(5) Use clause 152.215-717, Timely
Notice of Litigation, in all solicitations and
contracts. This clause is to be placed in
Section I for non-commercial contracts or
is included as part of the addenda in
commercial contracts (see 112.301).
(6) Use clause 152.215-718, Testing
Related to Electronic Communication
Equipment, in all solicitations and
contracts that will require or permit testing
electronic communication equipment.
Contracting officers place this clause in
Section E.
(7) Use clause 152.215-719,
Incorporation of Section K,
Representations, Certifications, and Other
Statements of Offerors, in all
non-commercial contracts, in order to
incorporate Section K into the contract
document by reference. Contracting
officers place this clause in Section H. (For
commercial contracts, see Section
112.301.)
(8) Reserved.
(9) In lieu of FAR clause 52.215-8,
contracting officers shall use clause
152.215-721 (Order of Precedence), in all
non-commercial contracts and
solicitations. Paragraph (a) (1) through
(5) may be modified as appropriate. This
clause is to be placed in Section H.
(10) In the preparation of proposal
presentation instructions for solicitations,
contracting officers may use 152.215-723
(Proposal Preparation Instructions). This
clause provides sample language that
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
contracting officers tailor to accommodate
the circumstances of the procurement and
insert in Section L.
(11) Reserved.
(12) The contracting officer shall insert
provision 152.215-730, Basis for Contract
Award, in Section M of all competitive
solicitations. Contracting officers shall
tailor this provision to incorporate the best
value source selection decision process
that the approved Source Selection Plan
defines.
(13) (Applicable to solicitations issued on
or after 01 February 2005) The
contracting officer shall insert provision
152.215-732, Evaluation Procedures and
Factors for Award, in Section M of all
competitive solicitations, other than those
issued using midrange procedures. The
contracting officer shall insert provision
152.215-733, Evaluation Procedures and
Factors for Award (Midrange), in Section M
of all competitive solicitations using
midrange procedures. Contracting officers
shall tailor these provisions to incorporate
evaluation procedures that the approved
Source Selection Plan defines.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
115.210 Forms.
(a) It is Agency policy that competitive solicitations shall contain a Standard Form 33,
Solicitation, Offer, and Award.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.271 Agency procurement issue review program
No text.
115.271-1 General
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05e96720
(U) The Agency Procurement Issue Review Program provides an avenue for interested parties
to raise concerns during the preaward phase of competitive Agency acquisitions that cannot be
resolved at the contracting officer level. In order of succession, the Contract Team Chief and
Contract Group Chief will review such issues for any acquisition within their purview. Interested
parties may bring matters of concern before the appropriate Contract Team Chief once they
have made a good faith attempt to resolve the matter with the contracting officer. Matters that
cannot be resolved by the Contract Team Chief may be brought to the Contract Group Chief for
resolution.
CCM Release Number: 2007-19
Release Date: 7/6/2007 .
115.271-2 Limitations
(U) The Agency Procurement Issue Review Program does not replace the FAR protest process.
Moreover, contacting the Contract Team Chief or Contract Group Chief does not affect the time
limits for filing a protest nor entitle any offeror to a proposal deadline extension.
CCM Release Number: 2007-19
Release Date: 7/6/2007
115.271-3 Procurement issue review roles
(U) When conducting issue reviews, Contract Team Chiefs and Contract Group Chiefs shall:
(a) Serve as Agency representatives to facilitate communications between the CIA and
interested parties in the resolution of matters arising during the preaward phase of competitive
acquisitions;
(b) Listen to concerns about specific issues and work with the appropriate persons within
the Agency to resolve such concerns before any such matter escalates into a major problem;
(c) Collect all relevant facts necessary to resolve issues raised by interested parties.
Collection of source selection and proprietary information shall be coordinated with the
contracting officer; and
(d) Ensure that documentation pertaining to the resolution of issues is included in the
contract file.
CCM Release Number: 2007-19
Release Date: 7/6/2007
115.271-4 Solicitation provision
(U) The contracting officer shall insert the provision at 152.215-734, Procurement Issue Review
Program, in all competitive solicitations. For solicitations issued under FAR Part 14 Sealed
Bidding Procedures, the term "offerors".may be replaced by the term "bidders" within the
provision.
CCM Release Number: 2007-19
Release Date: 7/6/2007
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
115.3 SOURCE SELECTION
115.300 Scope of subpart.
(U) This subpart provides additional guidance to supplement the policy and procedures for
source selection in competitive negotiated acquisitions set forth in FAR Subpart 15.3.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.302 Source selection objective.
(U) (a) AgOncy contracting officers may use a variety of procedures to select the proposal that represents the
best value to the Government. Essential principles that will enable the Government to achieve this objective are:
to engage key participants in the acquisition planning, establish a requirements-based selection process,
document the process in an approved Source Selection Plan, fully inform all offerors of that process, and
completely adhere to that process. Contracting teams should take advantage of the flexibilities provided in both
the FAR and the CCM. For example, the contracting officer may choose to combine evaluation subgroups (e.g.,
cost, management, and/or technical panels); and/or limit the number of participants to qualified individuals who
provide the requisite technical and cost evaluations. The contracting team may tailor virtually any approach to
ensure adequate levels of review appropriate to the acquisition.
(U) (b) For competitive acquisitions between $100,000 and $25 million, including options,
Agency contracting officers may use the streamlined Midrange source selection procedures
outlined in 115.370. See 115.370-103 for approval requirements.
CCM Release Number: 2005-9
Release Date: 11/21/2005
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
115.303 Responsibilities.
Release Number: 2007-18
Date Releases: 05/15/2007
(U) (a) In addition to the roles and
responsibilities identified at FAR 15.303, the
following requirements apply to Agency
negotiated procurements:
(U) (b) Source Selection Authority (SSA)
(Required)
The Source Selection Authority (SSA) is the
senior contracting officer with ultimate
responsibility for the source selection and
discussion processes. The SSA shall be at a
management level above that of the signatory
contracting officer. For Agency procurements, the
SSA is normally a Contract Team Chief or Deputy
Team Chief with a delegation sufficient for the
procurement. For procurements estimated to
exceed $100 million, inclusive of all options, the
SSA shall be at the Contract Group Chief or
Deputy Group Chief level. The Source Selection
Official (SSO) (when applicable) assists the SSA
and the Source Selection Evaluation Board (SEB)
in making the decision. In addition to the
responsibilities set forth in the corresponding FAR
Subpart, the SSA shall:
(1) Make competitive range
determinations.
(2) Document his/her independent source
selection decision in a Source Selection
Decision Memorandum (SSDM). The
Source Selection Decision Memorandum
template contains guidance concerning the
content and format of a sspm. (See CCG
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
Part 115.)
(U) (c) Contracting Officer (Required)
The contracting officer is responsible for
coordinating the evaluation process and reviewing
the products submitted to the SEB and SSA (as
applicable) for approval. The contracting officer is
the link between all parties in the source selection
process, ensuring that everyone knows their
responsibilities and fulfills them. In addition to
the responsibilities identified in FAR 15.303, the
contracting officer shall:
(1) Work closely with the SEB to ensure
balanced composition of appropriately
qualified personnel on subgroups;
(2) Review and approve the Source
Selection Plan, including evaluation
criteria, before submitting it to the SSA for
final approval;
(3) Ensure evaluation personnel are
aware of their duties and responsibilities
and resolve any conflict of interest issues.
All members of evaluation boards, panels,
and teams, including the SSA, SSO, the
Cost Evaluation Team (CET), the Technical
Management Evaluation Team (TMET), and
members of the Source Evaluation Board
(SEB) must sign a Confidentiality
Agreement and Conflict of Interest
certification before evaluation begins.
Signing this certificate ensures that
members have been advised in writing of
their responsibilities not to disclose any
procurement-related information during or
following the proposal evaluation and
contract award process. In addition, to
further enhance the integrity of the
procurement process, members must
disclose any financial interest that may
influence (or give the appearance of
influencing) their ability to make an
objective decision. The contracting officer
shall place the completed forms in the RFP
file.
(4) In the event any evaluation team
member believes they may have disclosed
source selection information or has a
financial conflict, the contracting officer
determines whether the evaluation team
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
member violated the Confidentiality
Agreement and Conflict of Interest
certification and, if appropriate, terminates
the member's participation in the source
selection.
(5) Coordinate and review the initial and
final recommendations of the subgroups
and SEB for final approval/disapproval by
the SSA and SEB as appropriate, and
(6) Ensure and maintain thorough
documentation by all evaluation personnel
for the contract file.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
115.303-70 Additional responsibilities
(U) (a) Source Selection Official (SSO) (Optional)
The role of the SSO is optional, dependent upon the cognizant directorate's practices and/or the
complexity of the piocurement. If used, the SSO represents the component and is generally at
the Division Chief level or above. Contracting Teams may use the SSO in lieu of the SEB. The
SSO shall:
(1) Appoint the technical or project members of the Source Selection Evaluation Board
(SEB), if required;
(2) Establish or approve the evaluation criteria included in the solicitation;
(3) Make the final recommendations to the SSA regarding which offerors should be
considered in the competitive range;
(4) Make the final recommendation to the SSA regarding the successful offeror; and
(5) Approve by signing the initial and final recommendations of the SEB or, if he/she
disapproves, document his/her recommendation to support their position.
(U) (b) Source Selection Evaluation Board (SEB)
(1) The composition of the SEB must be tailored to the requirements of the acquisition.
However, it shall have no fewer than two members: a requirements officer and a
contracting officer. If the SSO is not used, the Chairman of the SEB, who is generally at
the Division Chief level or above, has the authority to appoint additional members to
achieve an appropriate mix of qualified management, technical, and procurement
personnel commensurate with the acquisition. Non-voting members may also be
appointed, but they may act only in an advisory capacity. The SEB jointly determines
the necessity and composition of any subgroup (e.g., cost, management, and/or technical
panels) participating in the evaluation process based upon the complexities of the
acquisition. Subgroups are not required in all competitive acquisitions.
(2) The SEB shall ensure that the necessary activities leading up to the final evaluation
of all proposals are carried out and report its findings to the SSO (if used) or to the SSA.
The SEB's evaluations shall be based on all available information, including proposals,
team and panel reports, discussions, reference and other appropriate checks, and the .
personal knowledge of the individual members in their areas of expertise. The SEB shall,
recommend those proposals, which it believes are in the competitive range, and may
continue to participate in the process. The SEB may not delegate any of these
responsibilities in whole or in part. The SEB must review subgroup findings and reports,
and apply its own collective judgment to arrive at evaluation conclusions to be presented
to the SSA or to the SSO (if used). When reporting their findings, each member of the
SEB shall sign all of the board's evaluations/recommendations and certify that they
followed the source selection plan.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
(U) (c) Proposal Evaluation Subgroup(s)
(1) Proposal evaluation subgroups are a fact-finding arm of the SEB. The SEB must
keep the number of subgroups and their membership to the minimum necessary to
comply with the SSP's requirements. Subgroup members must be knowledgeable and
experienced in the disciplines they will evaluate. For example, a "management
evaluation team" could include experts in the areas of organization, pricing, personnel,
labor, contracting, and facilities.
(2) Each subgroup shall evaluate and rate each proposal, or portion thereof, that the
SEB or SSO assigns to it. All subgroup members must sign their subgroup's initial and
final evaluOons/recommendation to the SEB. If there is a dissent, the dissenting
individual or individuals shall document their opinions supporting the basis for a different
recommendation. Non-voting members appointed to serve on an evaluation subgroup
may only provide advisory opinions. See CCM 115.203-70 for guidance in using
non-government personnel as advisors.
CCM Release Number: 2004-1
Release Date: 9/14/2004
�
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
115.304 Evaluation factors and significant subfactors.
(U) (c)(1) Cost or price. Cost or price must always be included as an evaluation factor for
award, but not necessarily as a significant evaluation factor. Pursuant to FAR 15.304(e), the
contracting officer shall specify whether the combination of all non-cost or price factors are
significantly more important, significantly less important, or approximately equal to cost or
price. The importance of cost or price may increase as the relative differences in technical and
management evaluation results decrease, and may become the determinative factor. See FAR
15.101.
(U) (c)(3)(i) Past Performance. All solicitations over $100,000 (with the exception of those set
forth in FAR 15.304(c)(3)(iii)) shall include past performance as an evaluation criterion. The
contracting officer shall document exceptions in the business review. When past performance is
weighted, the weight assigned must be indicative of the significance that past performance will
have on source selection. Consistent with the Source Selection Plan (SSP), evaluators may
evaluate past performance information as a separate category or as part of a subfactor under
one or more of the other categories. Offerors shall be advised that all past performance
information collected and determined to be relevant to the procurement may be used to make a
past performance assessment.
(U) (c)(4) Pursuant to CCM 119.201, the Agency does not evaluate the extent of small
disadvantaged business participation in performing contracts.
CCM Release Number: 2007-17
Release Date: 3/30/2007
115.305 Proposal evaluation.
(U) (a) Documentation by evaluation personnel is critical. This documentation serves as the
basis for exchanges such as clarifications, communications, and discussions, as well as
competitive range decisions and debriefings to unsuccessful offerors. Consistent with FAR
15.305, evaluators shall identify all strengths, deficiencies, and weaknesses. "Weakness" means
any aspect of the proposal that increases the risk of unsuccessful contract performance.
"Deficiency" means a material failure of a proposal to meet the Agency's requirement, or a
combination of significant weaknesses that increases the risk of unsuccessful contract
performance to an unacceptable level. Evaluation teams shall also identify questions addressing
weaknesses and deficiencies identified for each proposal and specify whether each question
addresses a weakness, a deficiency, or is a minor clarification. The SEB reviews these questions
and the SSA approves them.
In addition, evaluators shall advise the contracting officer of the comparative differences among
the proposals, based on the evaluation criteria. This advice is an essential element of the
selection process and must be included in the report(s) submitted to the SEB and Contracting
Officer by the evaluators.
(a)(2)(iv) In the case of an offeror without a record of relevant past performance
or for whom information on past performance is not available, the offeror should
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
not be evaluated favorably or unfavorably. In such a case, it is Agency policy to
assign a neutral rating equal to the midpoint of the evaluation point scale for past
performance. �
(a)(2)(v) Pursuant to CCM 119.201, the Agency is exempt from the requirement
to evaluate the past performance of offerors in compliance with small
disadvantaged business goals, targets, and notifications.
(U) (a)(4) Cost Information. The evaluation of both cost and technical proposals must
address the offeror's understanding of the work and its ability to perform the contract.
There is no prohibition against simultaneous review of both the cost and technical
proposals by a single technical/cost evaluation team. Generally, however, evaluators
should conduct the initial evaluation of technical proposals without having access to the
cost proposals. The contracting officer may extract data from the cost proposal and
provide it to the technical evaluators when quantitative and qualitative information in
the cost proposal (e.g., kinds and quantities of labor hours and materials) is needed to
properly evaluate the technical proposal. If possible, technical evaluators should also
participate in evaluating cost proposals since they are in the best position to evaluate the
quantitative and qualitative aspects of the cost proposals. Some or all of the technical
evaluators may join the cost proposal evaluation immediately upon completion of the
initial technical evaluation to achieve this objective.
(U) (b) The concept of "nonresponsive," as used in sealed bidding,
negotiated procurements.
(U) (c) For information on the use of support contractor personnel
in proposal evaluation, see CCM 137.203 and FAR 37.203.
CCM Release Number: 2004-1
Release Date: 9/14/2004
is not appropriate in
(non-government advisors)
115.306 Exchanges with offerors after receipt of proposals.
The SSA determines the type and extent of exchanges to be conducted with each offeror.
(U) (a)(3) Clarification and award without discussions. If the government intended to make
award without discussion and the SSA later determines that discussions are necessary (and the
solicitation allows it), the contracting officer will inform all offerors that discussions will be held;
a competitive range established; and discussions held with all offerors in the competitive range
in accordance with FAR 15.306.
(U) (c)(2) Competitive Range. The contracting officer may exclude a proposal from the
competitive range on the basis of adverse past performance provided the offeror has been given
the opportunity to comment during communications as defined at FAR 15.306(b)(1)(i).
(U) (d) Exchanges with offerors after establishing the competitive range. Contracting officers
are encouraged to take full advantage of the flexibility permitted by the FAR to negotiate the
best deal possible with all offerors in the competitive range. The contracting officer shall tailor
discussions to each offeror's proposal.
CCM Release Number: 2004-1
Release Date: 9/14/2004
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
115.308-70 Source selection decision.
Release Number: 2005-8
Date Releases: 08/31/2005
(U) The SSA shall document his/her award
decision in a Source Selection Decision
Memorandum (SSDM). The Source Selection
Decision Memorandum template in the CCG Part
115 contains guidance concerning the content and
format of a SSDM.
115.370 Midrange Source Selection Procedures.
No text.
115.370-0 Scope of section.
(U) This part prescribes optional policies and procedures for the competitive acquisition of
supplies and services valued between $100,000 and $25 million using Agency midrange
procedures. This part is supplemental to standard source selection procedures outlined in FAR
Subpart 15.3.
CCM Relea'se Number: 2005-9
Release Date: 11/21/2005
115370-1 General. .
No text.
115.370-101 Purpose.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
(U) This part establishes policies and procedures that implement the midrange source selection
process. The CCG provides template documents in Part 115.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.370-102 Definitions.
(U) (a) Midrange procedures means streamlined source selection procedures that may be
used for competitive acquisitions valued between $100,000 and $25 million.
CCM Release Number: 2005-9
Release Date: 11/21/2005
115.370-103 Applicability.
(U) (a) This part applies to all non-commercial acquisitions that are over $100,000 and not
more than $25 million including options, and those commercial acquisitions within those
thresholds for which the contracting officer has not elected to use FAR Subpart 13.5
procedures. Contracting officers may process acquisitions not exceeding $10 million using
midrange source selection processes at their discretion. Acquisitions that are over $10 million
require the approval of the cognizant Contracts Group Chief. In lieu of a separate
memorandum, the contracting officer may use the Acquisition Plan (see 107.103(d)(1)(ii)) to
obtain this approval.
(U) (b) When the acquisition estimate is within the threshold of paragraph (a) of this section
and the acquisition was started using these procedures but the proposed prices/costs exceed the
midrange ceiling, the acquisition may continue under midrange procedures provided that -
(1) The successful offeror accepts incorporation of required FAR and CCM clauses
applicable to larger acquisitions; and
(2) The acquisition does not exceed $35 million including options for the total
requirement.
CCM Release Number: 2005-9
Release Date: 11/21/2005
115.370-104 Policy.
(U) (a) Unless stated otherwise, acquisitions conducted using midrange Procedures shall comply
with all applicable parts of the FAR and CCM.
(U) (b) Except as noted below, contracting officers shall use SF 33, Solicitation, Offer and
Award, for the solicitation.
(1) Use SF 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair), for
construction acquisitions.
(2) Use SF 1449, Solicitation/Contract/Order for Commercial Items, for commercial item
acquisitions.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
CCM Release Number: 2005-8
Release Date: 8/31/2005
115.370-2 Planning and requirements process.
No text.
115.370-201 Using a buying team.
(U) The Agency midrange procedures use a buying team to conduct the acquisition. The buying
team shall normally consist of one technical member, one contracting member, and one security
member (if required), but may be augmented with additional members as necessary. Personnel
providing normal functional assistance to the team (e.g., legal and audit) will not be considered
a part of the team unless so designated. To function properly, the team should be given the
maximum decision authority in matters related to the procurement. When higher-level
management approvals are required, it will be incumbent upon the functional team member to
obtain such approvals.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.370-202 Organizational responsibilities.
(U) (a) Requiring component: The requiring component shall appoint the technical member of
the buying team. This individual will normally be an end user or the one most familiar with the
technical aspects of the requirement. The technical member appointed will fulfill all of the
technical responsibilities for the buying team.
(U) (b) Contract Team: The Contracting Team Chief shall appoint a contracting officer to the
buying team. The contracting officer shall be the team leader with the ultimate responsibility to
conduct the acquisition.
(U) (c) Other supporting organizations: Supporting organizations shall provide additional team
members to perform specialized functions or to assist in evaluation of offers. Supporting team
members, once designated, shall fulfill all applicable responsibilities to the team.
CCM Release Number: 2005-8
Release Date: 8/31/2005
115.370-203 Buying team responsibilities.
(U) (a) The buying team shall conduct the acquisition in a manner that best satisfies the user's
requirements and provides best value to the Government. Team members should develop open
communications, rely on decisions of other responsible functional team members, and meet
their obligations to the team. The team shall:
(1) Refine the solicitation's final specifications or statement of work;
(2) Decide the most appropriate solicitation method;
(3) Establish milestones for the acquisition;
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
(4) Finalize the evaluation criteria;
(5) Develop the RFP; and
(6) Evaluate offers and recommend the awardee.
(U) (b) The contracting member of the buying team shall lead clarifications, discussions, and
conduct debriefings.
(U) (c) The Contracting Team Chief or Deputy shall function as the Source Selection Authority
(SSA) for the acquisition.
CCM Release Number: 2005-8
Release Date: 8/31/2005
115.370-204 Source Selection Plan.
(U) The buying team is responsible for developing evaluation criteria and drafting a source
selection plan for the SSA's approval. The purpose of the source selection plan is to describe the
"what," the "how," the "who," and the "when." The lower complexity of midrange procurements
should promote development of abbreviated source selection plans. The ideal plan should
ensure that the Agency's needs are met in a timely manner, at a reasonable cost, and be as -
concise as possible. The plan shall ensure the consistent and fair application of the evaluation
factors in making the award decision. See CCG Part 115 for Source Selection Plan templates.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.370-3 Request for Proposal (RFP).
No text.
115.370-301 General.
(U) Contracting officers shall use an RFP for all midrange procurements. The RFP includes
Sections L (proposal preparation instructions) and P1 (evaluation criteria) as well as a model
contract that includes Sections A through K. The buying team's decisions determine the extent
of discussion required, the degree to which non-price factors influence the award, and the
amount of competition available. The buying team tailors the evaluation and award criteria to
the requirements. The procurement must conform to the procedures applicable to the
evaluation and award criteria established in the RFP, unless changed by formal amendment to
the RFP.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.370-302 Preparing the RFP.
(U) The RFP shall contain, at a minimum, the following:
(a) Sections A through K of a model contract (including attachments such as the
SOW). Offerors shall be notified to submit offers with a signed SF 33, SF 1442
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
or SF 1449, whichever is applicable and completed Representations and
Certifications.
(b) Section L, which shall establish proposal preparation requirements for the content
and format of the offer. Normally, proposals will be limited to 30 pages.
(c) Section M, explains the evaluation and award criteria.
(d) A notification, when applicable, that facsimile offers are authorized.
(e) Contracting officers shall use draft RFPs for competitive requirements equal to or
greater than $1,000,000 on an annual basis, pursuant to CCM 115.201(c).
CCM Release Number: 2005-8
Release Date: 8/31/2005
115.370-303 Protecting proposals.
(U) When facsimile offers are authorized, a facsimile machine shall be placed in a secure
location so offers received on it can be safeguarded. All offers submitted shall be recorded,
sealed in an envelope marked with the RFP number and immediately provided to the contracting-
officer. The contracting officer should promptly make a good faith effort to inspect the
document for completeness and legibility. If there are missing or illegible pages, the contracting
officer should notify the offeror that it should resubmit the offer. The Government shall not
assume responsibility for proper transmission.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.370-4 Source selection.
No text.
115.370-401 Competitive negotiated acquisition using the lowest price technically
acceptable source selection process.
(U) (a) Policy.
(1) Award is based on the technically acceptable offer having the lowest price (if firm
fixed price) or the lowest most probable cost (if cost reimbursable), although the RFP
may permit discussing all aspects of the offer. This source selection method should
be used when qualitative factors are not material in the award decision, but it is
important to assure that technical offers and contract terms are fully compliant with
the Government's needs. This method also permits discussing the cost or price with
offerors and is particularly appropriate when different approaches can be offered to
satisfy the Government's need.
(2) The RFP should state the Government's intention to award without discussion based
on the initial offers submitted. FAR clause 52.215-1 shall be included in all RFPs for
competitive negotiated procurements except for commercial item solicitations utilizing
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
the streamlined evaluation procedures of FAR 12.602.
(3) If the contracting officer documents the file pursuant to FAR 15.304(c)(3)(iv), past
performance need not be an evaluation factor. If the contracting officer elects to
consider past performance as an evaluation factor, it shall be evaluated in accordance
with FAR 15.305; however, the comparative assessment required by FAR 15.305(a)
(2)(i) is not required.
(4) Security proposals shall be rated on a pass/fail basis.
(U) (b) Procedures.
(1) The RFP shall request offerors to submit both a technical and a cost volume by the
closing date specified.
(2) Evaluation. The buying team shall review each offer to determine if all required
information has been provided and if the offer meets the minimal standard of
technical acceptability established by the RFP. No further evaluation shall be made of
any offer that is deemed unacceptable because it does not meet the technical
requirements if the buying team believes the proposal cannot easily be improved to
an acceptable level. Offerors may be contacted to clarify certain aspects of their offer
only during the initial evaluation. Offerors that submitted unacceptable offers shall
be notified of the rejection and the basis for it. Such offers are excluded from further
consideration. Contracting officers shall document the reasons for an offer's rejection
with succinct factual statements that explain why the offer is not acceptable.
(3) Determining the competitive range.
(i) If the source selection authority determines that discussions are necessary,
the buying team shall rank the acceptable offers based on price (or most
probable cost) and exclude any whose price/most probable cost precludes any
reasonable chance of being selected for final award. Those offers remaining
constitute the competitive range. Only in exceptional cases will this number
be less than two offers. The contracting officer shall succinctly record the
basis for the decision and shall notify each offeror not'included in the
competitive range.
,
(ii) The source selection authority may elect to award the contract without
discussions and a competitive range determination if selection of an initial
offer(s) will result in the lowest price/cost to the Government and discussions
with other acceptable offerors are not anticipated to change the outcome of
the initial evaluation regarding the evaluated price/cost. Discussions are not
required if there are sufficient acceptable offers to ensure adequate price
competition; and if the additional time, effort and delay required to make the
other proposals acceptable (and thereby increase competition), would not be in
the Government's interest.
(4) Discussions. If the contracting officer determines that discussions are required,
discussions shall be conducted with each offeror in the competitive range. The
discussions are intended to assist the buying team in fully understanding each offer
and to assure that all offerors in the competitive range are competing equally on the
basis intended: Contracting officers must be careful to ensure these discussions
adhere to the guidelines set forth in FAR 15.306. After completing discussions, each
offeror shall be given an opportunity to revise its offer to clarify or document
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
understandings reached during discussions. A common and reasonable cut-off date
(normally less than 5 working days) will be established for submitting all revisions.
(5) Selection. The Contracting Team Chief or Deputy shall be the source selection
authority. The source selection decision memorandum will not ordinarily exceed one
page. It shall succinctly summarize the basis for selection and reference the informal
worksheets used in the evaluation process to further supplement the decision. These
informal worksheets shall be included in the contract file.
(6) Notification. Within three days of contract award, the contracting officer shall provide
written notification to each offeror who was in the competitive range, but not selected for award
in accordance with FAR 15.503(b)(1).
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.370-402 Competitive negotiated acquisition using best value (tradeoff) source
selection process.
(U) (a) Policy.
(1) Midrange acquisitions shall normally use Best Value Tradeoffs Source Selection
method when it is desirable to base evaluation and award on a combination of price
and non-price qualitative criteria.
(2) The best value tradeoff approach in a midrange source selection predefines the
evaluation factors that will serve as the discriminators among offers. It eliminates
the use of area evaluation factors and highly structured scoring used in traditional
best value tradeoff competitions.
(3) The tIFP should reserve the right to award without discussions based on the initial
offers submitted. FAR 52.215-1 shall be included in all RFPs for competitive
negotiated acquisitions using qualitative criteria except for commercial item
solicitations.
(4) In complex procurements, the traditional source selection method may be more
appropriate than the midrange best value tradeoff approach when:
(i) Complex interrelationships of the acquisition must be evaluated;
(ii) A number of evaluators are required to address the disciplines that will be
involved in the offers; or
(iii) The acquisition may impact broader mission requirements or future
acquisitions.
(5) See FAR 15.304 and 15.305(a)(2) regarding the evaluation of past performance.
(U) (b) Procedures.
(1) Evaluation Criteria.
(i) The requiring organization shall provide, along with the Statement of Work
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
and/or specifications, a list of evaluation factors against which the offers will
be judged. Although there is no limit to the number or the type of factors
that requiring organizations may specify, the following standard factors
should generally be used: corporate experience, technical expertise or
technical approach, past performance, security, and cost/price. Factors may
include sub-factors such as improved reliability, speed of service,
demonstrated delivery performance, higher speeds, user-friendliness,
personnel qualifications, solving operational problems, level of service
provided on previous similar contracts, or any other characteristics that may
be important to the Government in satisfying its needs.
(ii) Security shall be rated on a pass/fail basis.
(iii) Past performance may be included within another evaluation factor or
considered as a separate factor. Section M shall define the relative
importance of past performance in relation to cost and the other factors
when considered as a separate criterion.
(iv) Cost factors may be considered approximately equal to, significantly less
important than, or significantly more important than all other qualitative
factors combined.
(2) Proposal Submission. The RFP may solicit both an interim and final proposal
submission. The interim proposal submission shall be due approximately 15 days
after release of the REP and should consist of a corporate experience matrix, technical
expertise matrix, proposed staff matrix (including education, security clearance,
general, and specialized experience), brief descriptions of the technical approach and
security qualifications, and past performance assessments. The final proposal
submission shall be due 30 days after release of the REP and shall include the signed
model contract, cost/price proposal, any revisions to the staff and corporate
experience matrices, resumes for key personnel, and any narratives required.
(3) Evaluation. All interim proposals will be evaluated against the requirement and
the evaluation factors. The buying team shall provide interim evaluation
documentation, which will be compiled by the contracting officer as part of the record
of source selection proceedings. The documentation shall consist of complete
evaluation scoring sheets and supporting notes and shall address all qualitative
evaluation factors. Upon receipt of final proposals, the evaluators shall review their
earlier assessments against additional material submitted and adjust their evaluations
accordingly. After the final evaluation, team members shall meet to discuss
recommendations, resolve any remaining issues and prepare a summary report of the
technical and cost evaluation results with the minimum amount of documentation.
The summary report should recommend either selecting an offeror; or if discussions
are required, identify those most highly rater offerors recommended for inclusion in
the competitive range, pursuant to FAR 15.306(c)(1).
(4) Determining the need for discussions and the competitive range.
(i) The SSA shall establish the competitive range if the contracting officer will
conduct discussions. The competitive range documentation shall succinctly
describe how the evaluation characteristics in the REP and cost/price
considerations were evaluated. Generally, the competitive range will include
those offers having the best price or lowest most probable cost; the offer
having the highest qualitative merit; and those offers determined to have the
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
best combination of price and merit. The contracting officer shall exclude
offers not in the competitive range from further evaluation.
(ii) The source selection official may elect to award in lieu of determining a
competitive range, provided it can be clearly demonstrated that: (1) selecting
an initial offer(s) will result in the best value for the Government, considering
both price and non-price qualitative criteria; (2) discussions with other
acceptable offerors are not anticipated to change the outcome of the initial
evaluation relative to the best value offer(s); and (3) the solicitation contains
a provision permitting award without discussions.
(5) Discussions. The contracting officer shall lead discussions with each offeror
included in the competitive range. Care must be exercised to ensure these
discussions adhere to the guidelines set forth in FAR 15.306. Discussions shall be
conducted on an informal basis with each offeror. After completion of discussions,
each offeror shall be provided an opportunity to revise its offer to clarify and
document understandings reached during discussions. The contracting officer shall
establish a common and reasonable cut-off date (normally within 5 working days) for
submission of all revisions.
(6) Selection. The Contracting Team Chief or Deputy shall be the source selection
authority. The best value tradeoffs source selection permits tradeoffs among cost or
price and non-cost factors and allows the Government to accept other than the lowest
priced proposal.
(7) Source Selection Documentation. The contracting officer records the rationale for
selection of the successful offeror in a source selection memorandum that succinctly
records the characteristics upon which the SSA made the selection. The statement
need not and should not reveal details of the successful offer that are proprietary or
business sensitive. The memorandum shall address the rationale used to evaluate
cost and qualitative merit. Little or no additional analysis is required if the selected
offeror possesses the highest merit and lowest price. When a tradeoff is made
between qualitative factors and cost or price, specific rationale should be provided to
the extent possible. The memorandum will not ordinarily exceed one page. When
there is close competition, it would be prudent to expand on the rationale provided in
the memorandum.
(8) Notification. Within three days of contract award, the contracting officer shall provide
written notification to each offeror who was in the competitive range, but not selected for award
in accordance with FAR 15.503(b)(1).Competitive negotiated acquisition using best value
(tradeoff) source selection process.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.370-5 Award.
No text.
115.370-501 Representations and certifications.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
other evaluation factors combined).
(U) (c)(4) Waivers. The cognizant Group Chief may, in exceptional cases, waive (or partially
waive) the requirement for submission of certified cost or pricing data. The authorization for a
waiver and the reason for granting it shall be in a "Determination and Findings" format. See
CCG, Part 115, "Determination and Findings Format - Authority to Waive Submission of Cost
and Pricing Data."
CCM Release Number: 2004-2
Release, Date: 9/15/2004
115.404-1 Proposal analysis techniques.
(U) (a) Upon receipt of the audit report and,the COTR's technical evaluation report (see CCG
Part 115 for a sample Technical Evaluation Report), the contracting officer is responsible for
developing a government pricing objective before negotiation. In addition, the contracting
officer may seek the advice of other specialists. This advice may include cost and price analysis,
historical cost or pricing data, independent government cost estimates, and economic analyses.
Comments or recommendations from other specialists should be in writing.
(a)(5) Occasionally, differences of opinion will exist not only as to the reasonableness of
cost projections, but also on the accounting techniques on which they are based. In
addition, it may not be possible to negotiate a price that is in strict accord with all of the
pricing specialist's opinions, or even with the government's pricing objective. Reasonable
compromises are an essential part of the negotiation process. Therefore, contracting
officers must consider audit reports or pricing recommendations by others as advisory.
The contracting officer is responsible for exercising the requisite judgments and is solely
responsible for the final pricing decision. However, when the contracting officer does not
adopt the recommendations of auditors or other specialists, the contracting officer must
document rationale in the record of the negotiation.
(U) (b) Price analysis. When contracting officers conduct price comparisons, they must make
appropriate allowances for differences in such factors as date of prior acquisitions, specifications,
quantities ordered, time for delivery, government-furnished materials, and current trends in
production efficiency.
(U) (e)(1) A contracting officer may consider the recommendations of technical personnel as
part of the cost analysis. The technical analysis report is an essential record supporting the
procurement action and shall become a part of the official contract file.
CCM Release Number: 2005-7
Release Date: 5/19/2005
115.404-2 Information to support proposal analysis.
(U) (c) When cost or pricing data are required, contracting officers shall request an audit report
from FIN before negotiating any contract or modification resulting from a proposal in
excess of $1 million unless information available to the contracting officer is considered
adequate to determine the reasonableness of the proposed cost or price. The contracting officer
may request an audit for proposals under $1 million. The contracting officer shall tailor all audit
requests to the amount and complexity of the procurement. When contracting officers consider
available data adequate for a reasonableness determination, they shall document the Business
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
Review (BR) to reflect the basis of the determination. See 101.704 for Business Review content
requirements.
CCM Release Number: 2005-8
Release Date: 8/31/2005
115.404-3 Subcontract pricing considerations.
(U) (a) The Agency's policies for cost-reimbursement subcontracts requires contracting officers
to ensure that fees under such subcontracts do not exceed the fee limitation identified in FAR
15.404-4(c)(4).
(U) (b) When the contracting officer must award a definitive contract before determining final
subcontract prices, the contracting officer may include clause 152.215-721, or one substantially
the same in Section H.
(U) (c)(1) The prime contractor may submit a subcontractor's request for an exemption from
the requirement to submit cost or pricing data pursuant to FAR 15.403-1.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.404-370 Subcontracting price revisions.
(U) (a) When subcontracts have been awarded on a price redeterminable or ceiling priced basis,
it may be necessary for the contracting officer to negotiate a final prime contract price, even
though the contractor has not yet established final subcontract prices. In this situation, the
contracting officer may require the contractor to advise the contractor officer in writing of the
final subcontract price and negotiate a downward equitable adjustment to the contract price
reflecting the subcontract price revision. The contracting officer may include clause
152.215-726, or one substantially the same in section H if this approach is desired.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.404-4 Profit.
(U) (b)(1)(i) Contracting officers shall follow the Agency's Structured Fee Calculation Approach
when developing a pre-negotiation profit or fee objective. This applies to all negotiated contract
actions that require cost analysis in accordance with FAR 15.403, Obtaining cost or pricing data.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.404-470 Agency Structured Fee Calculation Approach.
(U) (a) Provides a vehicle for performing the analysis necessary to develop a profit objective by
giving due consideration to all appropriate cost elements and factors influencing profit/fee
determinations.
(U) (b) Provides a format for contract negotiation documentation. For the Business Review's
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
documentation requirements for profit, see CCG, Part 101, "Business Review - Required Format
& Content".
(U) (c) Serves as a basis for determining an appropriate profit/fee objective. It does not
mandate a specific fee or profit objective in terms of either dollars or percentages. Contracting
officers have the latitude to negotiate above or below the Agency Structured Fee Calculation
Approach computed amounts, consistent with the circumstances surrounding the particular
negotiation.
(U) (d) Provides an automated spreadsheet which aids in calculating a profit/fee objective and
is available electronically in the CCG. For information on how to compute the profit/fee
objectives using the automated form, see CCG, Part 115, "The Agency's Profit Policy Instruction
Guide & Spreadsheet".
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.406 Documentation.
No text.
115.406-170 Prenegotiation objectives.
(U) (a) Requirements for briefing, documentation, and approval of prenegotiation objectives
shall be at the discretion of the Contracting Team Chief. Team Chiefs shall consider both the �
amount and complexity of the requirement, and the experience level of the contracting officer
when establishing such requirements.
(U) (b) While the Team Chief establishes pre-negotiation briefing requirements, the following
information in Table 15-4 should be addressed, as appropriate.
General
_
- Top level summary of the contract, including identification of
contractor, type of contract, value, period of performance and obligated
funds.
- Summary of acquisition events to date.
Technical
- General summary of the technical requirements of the action.
- Technical analysis comments and the proposed treatment of such
advice/comments.
Cost
- Cost/price spreadsheet showing the elements of the offeror's proposal,
audit recommendations, and the negotiator's pricing objectives.
- Discussion of technical and/or' cost differences between proposals and
the Government's objective.
- Discussion of how previous contract actions impact the pricing
objectives of the current contract action.
- Extent of subcontracting and justification for subcontract price(s)
provided by the prime contractor.
- Discussion of whether the CO will base negotiations on actual costs.
- Discussion of how the CO established the profit objective, including a
copy of the weighted guideline analysis, and discussion of the award fee
structure, if applicable.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
- Discussion of incentive arrangements, if applicable (e.g. share ratios,
ceiling price, etc.)
- Summary statement addressing audit or specialist recommendations.
Other
Considerations
- Unique or peculiar features of the contract (e.g. cost sharing, options,
etc.)
- Proposed special provisions and rationale for use.
- Any specific approvals, deviations, or delegations required.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.406-3 Documenting the negotiation.
(U) (a) The Agency calls its price negotiation memorandum a "Business Review" (BR). (See
CCG, Part 101, "Business Reviews - Required Format and Content" for specific documentation
and format requirements).
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.408-70 Solicitation provisions and contract clauses.
(U) Clause 152.215-727, Pricing Adjustment, shall be included in all solicitations and contracts
which include FAR clauses: 52.215-11, Price Reduction for Defective Cost or Pricing Data -
Modifications; 52.215-12, Subcontractor Cost or Pricing Data; or 52.215-13, Subcontractor Cost
or Pricing Data - Modifications.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.5 PREAWARD, AWARD, AND POSTAWARD NOTIFICATIONS, PROTESTS, AND
MISTAKES
115.505 Preaward debriefing of offerors.
(U) (d) The contracting officer should chair any debriefing held, with the support and active
participation of the technical personnel familiar with the rationale for the source selection
decision. The written narrative evaluation report prepared during the technical evaluation shall
be the primary source of information. The contracting officer should coordinate debriefing
materials with CLD/OGC. See CCG Part 115 for a debriefing template.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.506 Postaward debriefing of offerors.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
(U) (c) The contracting officer should chair any debriefing held, with the support and active
participation of the technical personnel familiar with the rationale for the selection decision.
The written narrative evaluation report prepared during the technical evaluation shall be the
primary source of information. The contracting officer should coordinate debriefing materials
with CLD/OGC. See CCG Part 115 for a debriefing template.
CCM Release Number: 2004-2
Release Date: 9/15/2004
115.6 UNSOLICITED PROPOSALS
115.606 Agency procedures.
(U) (a)(1) When an unsolicited proposal is received, it must be promptly acknowledged by the
cognizant contracting team. The acknowledgment shall advise the offeror that the Agency is
considering its proposal. The contracting team shall then place the cover sheet required by FAR
15.609, Unsolicited Proposal - Use of Data Limited, on the proposal and forward the proposal to
the appropriate technical component for evaluation.
(U) (2) Contracting officers shall ensure that FAR 15.608, Prohibitions, is closely followed.
(U) (3) When the technical component completes its evaluation, it shall notify the contracting
team of its conclusions and recommendations. If the evaluators conclude that the technical
office is not interested, the technical office will return the proposal to the contracting team and,
if appropriate, recommend other technical offices that might be interested. If it is determined
that there is no Agency interest, the contracting team shall return the proposal to the
contractor, or destroy it at the contractor's discretion.
(U) (4) A favorable comprehensive evaluation of an unsolicited proposal does not, in itself,
justify awarding a contract without following the Agency's competition procedures. The
contracting officer may commence negotiations on a sole source basis only when the unsolicited
proposal is favorably evaluated, a Justification for Other than Full and Open Competition
approval has been obtained, and the technical office sponsoring the contract has furnished the
necessary funds.
CCM Release Number: 2004-1
Release Date: 9/14/2004
115.70 ALPHA CONTRACTING
115.7000 Definition.
(U) Alpha Contracting is a technique that uses a team approach to prepare, evaluate, and
award efforts in substantially less time than the traditional approach. Alpha Contracting takes
the contracting process and converts it from a consecutive (and often iterative) process into a
concurrent process in which the government and contractor teams work side by side. From
solicitation development, through proposal preparation, to evaluation, negotiation, and award,
Alpha Contracting relies on a team approach to concurrently develop a scope of work, price that
scope, and prepare to execute that scope.
Approved for Release: 2017/03/15 C05896720
Approved for Release: 2017/03/15 C05896720
,and
CeMleage'Nurober;:,2005-7
ORelease 1:::!ate,571197-2665
41115170geperal.,
Alpha Codrittattivraiq.,0'4irrtaV,sple source environment to thoSeAeowisitions
ism high payliff.- Alpha Contracting is b,egS,tored4oftethnitallyt,tdmjilex4tiigh'--
dollar efforts; R&D wherevereffortS,-6.r;---thec-dntradtiii�"offiCer. determines it to be beneficial
, .. ---,-t, - 1.r. ,:--,,,,a,;e,,,,,..
AlIriha e,ontraeting Is 0 ppoyelioapl5rdaeWtO redUcirigadmigistotity;eitre d,1-tithelw.recr,IL:ey-rosts,
thenegotiated agreement and probability of success of a rgiliti 414, rt.
bY Atirlitiorral
Caontradting
information on Alpha Contracting is four')
GeM Release Number: 20,945!,<
Release Date,' 5/g9/12005
in the CCG Part 11-
Alphiya'
im Komi 'bdt
Approved for Release: 2017/03/15 C05896720