CHIGO SYSTEM PACKAGE PROGRAM SECURITY SECTION XV
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
05752562
Release Decision:
RIFPUB
Original Classification:
U
Document Page Count:
8
Document Creation Date:
March 9, 2023
Document Release Date:
February 10, 2021
Sequence Number:
Case Number:
F-2011-01575
File:
Attachment | Size |
---|---|
CHIGO SYSTEM PACKAGE PROG[15858513].pdf | 202.21 KB |
Body:
Approved for Release: 2020/12/28 C05752562
CHIGO
SYSTEM PACKAGE PROGRAM
SECURITY
__SE4TIPN_)rY
TOP
Approved for Release: 2020/12/28 C05752562
Approved for Release: 2020/12/28 C05752562
TOP SECRET
The CHIGOE reconnaissance system program is classified as
. follows:
ITEM
a. Manufacturing and Model
Designation of the Airframe
b. Engineering Design Information
which is peculiar to the CHIGOE
reconnaissance system, classified
mission equipment
c. Physical characteristics including
design gross weight and the
capabilities of the airframe
d. General performance characteristics
e. Exact performance-alid-dharacteristics
data of the airframe and non-
sensitive external equipment
f. Photographs, drawings, models and
markup showing external configuration
unless it is modified to expose sensi-
tive equipment
(t Internal photographs and drawings
revealing significant capability
and/or vulnerability including,but
not restricted to sensor systems
h. Significant aircraft capability and
vulnerability pertaining to the
following:
TOP SECRET
SECURITY CLASSIFICATION
Unclassified
Secret
Unclassified
Unclassified
Unclassified
Unclassified
Top Secret
Approved for Release: 2020/12/28 C05752562
Approved for Release: 2020/12/28 C05752562
TOP SECRET
1. Armament Secret
2. Bombing Secret
3. ECM Top Secret
4. Reconnaissance Top Secret
5. Significant wind tunnel
and other test data
concerning the basic air-
frame Unclassified
6. Command and control Top Secret
7. Communications facilities
other than normal milspec
systems Unclassified
i. Project Name CHIGOE Secret
j. Contract numbers Secret
k. Contract negotiators names Secret
1. Complete list of associate contractors Secret
m. Priorities assigned to the CHIGOE
Program SEcret
n. Names of Agency personnel associated
with this project Secret
Notes:
1. The term CHIGOE, when it is related to a specific
aircraft, a number of aircraft or mission, is classified
SECRET.
2. In reference to performance capability and vulnerability,
the following applies:
TOP SECRET
Approved for Release: 2020/12/28 C05752562
Approved for Release: 2020/12/28 C05752562
TOP SECRET
Operating altitude
Operational readiness time
Equipment effectiveness
Aircraft range
Mission duration
System capacity
Signature characteristics, particularly
of sensor systems
Camera resolution
Recording capability
Computer capability and use
3. Relating to test schedules and data
applies:
Complete flight test schedules
_
Significant progression or completion
of major objectives
Objective of tests
Results and conclusions which
reveal total system performance
Results and conslusions which
reveal airframe performance
Secret
Secret
Secret
Unclassified
Unclassified
Secret
Top Secret
Secret
Secret
Secret
the following
Secret
Secret
Secret
Secret
Unclassified
4. Engineering design information which is peculiar to
the P2V-7 airframe only is unclassified. Such information
which is peculiar to classified mission equipment will be
classified secret.
6. Installed subsystem equipments
1. Forward-looking IR, accuracy
design and collection capability
Secret
TOP SECRET
Approved for Release: 2020/12/28 C05752562
Approved for Release: 2020/12/28 C05752562
TOP SECRET
� Operational objective Top Secret
� Reliability Secret
2. Low-light TV display
Capabilities, design, characteris-
tics Secret
External views of black boxes in
the system Unclassified
Internal views Secret
3. Inertial navigation system
Unless otherwise classified by
another Government agency Unclassified
Application to CHIGOE Program Secret
4. Camera system Secret
5. Crewcomplement Unclassified
6. Operational crew training with
the total reconnaissance system Secret
p. Schedules and delivery rates to
operational units Secret
Production program schedules of
GFAE deliveries to LTV Unclassified-
Marked for official
use only
Deployment and initial operational
capability dates Secret
TOP SECRET
Approved for Release: 2020/12/28 C05752562
Approved for Release: 2020/12/28 C05752562
TOP SECRET
15.0 General
classification
This section provides basic security/guidance to agency
activities, contractors and other military and government
agencies involved in the CHIGOE Program. Detailed guidance
and assessment of security aspects of this program are the
responsibility of the Security Staff, OSA.
Each document and/or item of equipment will be classified
according to its content and reference to its ultimate employment.
All classified data pertaining to the CHIGOE program will
be considered as sensitive material as set forth in automatic
time phased downgrading and declassification system. The
following areas of information will be retained in Group I
for Agency use; Subsequent military utilization of this
system or its subsystems will require a re-evaluation of security
aspects according to the assigned military mission.
a. Countermeasures information
b. Operational capability data on the total system for
sensor subsystems.
c. Technical details of the infrared sensors and the
magnetometer.
d. Operational characteristics, effectiveness and limitations.
e. Agency association with development,modification,
testing or contracting for this program.
f. The intended ultimate use of this aircraft and sensor
system.
15.1 Security Classification
TOP SECRET
Approved for Release: 2020/12/28 C05752562
Approved for Release: 2020/12/28 C05752562
TOP SECRET
15.2 Public release of information
No publicity releases by contractors or subcontractors of
the CHIGOE program are permitted without prior coordination
and approval by OSA Security Staff. Proposed releases by
military activities through the completion of the flight test
and operational test phases on the initial aircraft will be
submitted to OSA Security Staff for approval.
15.3 Facility and personnel security clearances
for
Facility security clearances require prime contract per-
formance (LTV) or for access to classified information is
SECRET. Prevision for storage and use of TOP SECRET materiel
must be provided at the prime contractor's facility (LTV).
Personnel security clearances for contractor and military/
civilian personnel will be governed by the level of access
required to accomplish their job. Access to the sensitive
aspects of this system listed in Para 15.1 above will require
a SECRET ecurity clearance except for those specific personnel
and instances in which access to technical sensor data requires
a TOP SECRET security clearance.
15.4 Controlt4A of classified information
Control of classified information will be on a strict
need-to-know basis.
TOP SECRET
Approved for Release: 2020/12/28 C05752562 �
Approved for Release: 2020/12/28 C05752562
TOP SECRET
Release of classified information to foreign nationals
and/or foreign governments is prohibited except as it may be
specfically authorized by the responsible security officials
for this project.
Requests for authorization to release classified informa-
tion on the CHIGOE Program will be submitted to OSA Security
Staff for approval.
15.5 No foreign contracting for performance of contract work
in a foreign country by a U.S. contractor is contemplated.
15.6 Test Program
When the CHIGOE aircraft is to be tested, OSA will be
notifying the appropriate U.S. military authorities and the
testing installation security activity sufficiently in ad-
vance of actual test dates so the appropriate physical security
arrangements can be made to safeguard the aircraft while
undergoing testing. Coordination with FAA for the use of
airspace in the ZI ibr system testing whenever it becomes
necessary, will be the responsibility of OSA.
\ . TOP SECRET
Approved for Release: 2020/12/28 C05752562