MANUFACTURING SPECIFICATIONS FOR PERSONNEL BALLOONS 393P AND 343P CONTRACT NO. PSC-293-UNV

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
05416088
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
4
Document Creation Date: 
December 28, 2022
Document Release Date: 
February 15, 2017
Sequence Number: 
Case Number: 
F-2008-00941
Publication Date: 
July 31, 1956
File: 
AttachmentSize
PDF icon manufacturing specificati[15008718].pdf191.97 KB
Body: 
STAND'ARD FO,R14..NO. 64 Approved for Release 2016/10/24 CO5416088 -; Office Memorandum � UNITED STATES GOVERNMENT FROM : Acting Assistant Dem, SUBJECT: for contre actuz.ng Sneesfleabane for Personnel ntrebt No. PSG-293-'0NY DATM 71 July 1956 9- -------- - 1. The specifications for :the subject balloons furnished C Procurement Division for the procurement of these items are restrictive to General Mills, Inc.:, in certain respects. This is particularly true with respect co the reference to GMI Specifications M-2994-1 and M-294.-2 which are shown on Drawing A732601-C-. In addition the specifications refer to GMI Engineering approved methods for making repairs to enable a unit to -pass tests. 2., It is obvious,of course, that these references will be meaningless to Winzen Research, :inc.) under Contract No. PSC-293 as well as to the Naval Inspector of Material. The Naval Inspector of Material will, in fact, be unable to conduct an inspection unless the specifications and the engineering methods (if appropriate to this procurement) which mre identified above by GMI numbers, are furnished: 3. Inasmuch as the development of the item and the specifica- tions was sponsored by this Agency and -funds expended for the procurement of the item with specifications, it is considered that the specifications and drawings furnished should be completely - non-restrictive by the elimination of the contractor's firm name and any other designation which is proprietary either by wording or format. L, In view of the above Sand of the possibility, of delay in inspection, it is requested that specifications identified is GMI-M-299L-3. and GMT41-2994-2 be furnished the Procurement Division for reforwardinm to Winzen Research, be,, and that the specifica- tions for making repairs identified as GMT Engineering :approved methods, also be included if appropriate for this procurement. Approved for Release: 2016/10/24 C05416088 (b)(3) fi Approved for Release: 2016/10/24 CO5416088, - W . 5. Wirean Research. Inc., letter of 10 July 1956 -with revised drawing of the Suspension Farness Details (Winzen aesearch No. W-1530-.R), is attached, for your review and consent, It a:2;ears that Winzen Research desires to substitute this drawing for draw2.ng N�m. Enclosure: Ur. of 10 July 56� Distribution: Orig. - Addressee 1 - P60-293 (Official) 1 - Chrono r8583 (31 July 1956) Approved for Release 2016/10/24 C05416088 A roved for Release: 2016/10/24 C05416088 /0 �ac!ctEjtri h: u t153.i-A e leta d of tke e.. e o contract SC-29 priot vac p believe a ncasaryrrcctvc ch�.ng:o it on t 3r.int As this Approved for Release 2016/10/24 C05416088 P�j /rt.; r 14 yro o- - Approved for Release: 2016/10/24 C05416 a0 DR. 0 * h CH. Aar SCALE 4:-7-cC-40 SATE .7 L ovvew rrs- 70 EQojtf---PL-7,1" )40 /rig C-5:92�/ 4/2'177c: czic SN A PS / W I NZEN RESEARCH INC. FLEMING FIELD SOUTH MAT. I NO. REQ. I NAME IK,v4;04/ MAT'L SPEC >tics- / 8790 /IA PRI/- 1 �