CZECHOSLOVAK ELBE-ODER NAVIGATION (CSPLO): CONSTRUCTION AND OVERHAULING OF VESSELS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
05224377
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
1
Document Creation Date: 
March 8, 2023
Document Release Date: 
October 4, 2019
Sequence Number: 
Case Number: 
F-2018-01373
Publication Date: 
March 21, 1955
File: 
Body: 
Approved for Release: 2019/09/26 C05224377 INFORMATION REPORT INFORMATI_ CENTRAL -NTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning of the Xspionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorised person is prohibited by law. SECT NOFORN/CONTINUED CONTROL COUNTRY Czechoslovakia REPORT NO. (b)(1) (b)(3) SUBJECT Czechoslovak Elbe-Oder Navigation DATE DISTR. 21 March 1955 (CSPLO): Construction and Over- hauling of Vessels NO. OF PAGES 1 (b)(1) DATE OF INFO. REQUIREMENT NO. RD (b)(3) REFERENCES (b)(1) (b)(3) DATE ACQUIRED SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. (b)(1)� (b)(3)- 1. Six new lighters are under construction in a wharf in Valtirov (N50-30, E14-08) with a loading capacity of 172 tons each. The ships are destined for the Hamburg CSPLO station of the Czechoslovak Elbe-Oder Navigation (CSPLO) National Enterprise. The Czech vessel DUNAJ towed the first two ready lighters to Hamburg. The ships were loaded with iron rods. 2. The Czech barges on the Oder River which were built in Usti nad Labem and Prague are in such bad condition that they had to be taken out of traffic for general overhauling. All cabins have bugs and fumigation is considered necessary. (b)(1) (b)(3) NO elD SEOET NOFORN/CONTINUED CONTROL STATE ARMY NAVY AIR FBI AEC -I (Not*: Washington distribution indicatad by "X"; Field distribution by "#"�) INFORMATION REPORT INFORMATION REN Ri Approved for Release: 2019/09/26 C05224377