CENTRAL INTELLIGENCE BULLETIN - 1967/11/15
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
03009601
Release Decision:
Original Classification:
Document Page Count:
Document Creation Date:
July 27, 2018
Sequence Number:
Case Number:
File:
Attachment | Size |
---|---|
![]() | 1.41 MB |
Body:
Approved for Release: 2018/06/28 C03009601
DIRECTORATE OF
INTELLIGENCE
Central Intelligence Bulletin
3.5(c)
Approved for Release: 2018/06/28 C03009601
cret
210
15 November 1967
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601
3.5(c)
Approved for Release: 2018/06/28 C03009601
TO 'C RET
3.5(c)
15 November 1967
Central Intelligence Bulletin
CONTENTS
Vietnam: Situation report. (Page 1)
TOP CRET
Approved for Release: 2018/06/28 C03009601
3.5(c)
3.5(c)
NR
NR
Approved for Release: 2018/06/28 C03009601
LAOS PANHANDLE
4
Ton le
Kong
68656 11-67 CIA
15 Nov 67 CENTRAL INTELLIGENCE BULLETIN Map
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601
TO 'GREY
*Vietnam:
3.5(c)
North Vietnam: Long shipping delays are still oc-
curring in the Haiphong port area but essential imports
seem to be getting in.
Port congestion has eased somewhat in the last two
months. The turnaround time for ships calling at Hai-
phong averaged 19 days in October, down from about 30
days in August but still about one third longer than the
average for 1966. One factor in this decline has been a
reduction in imports from a monthly average of 128, 000
tons for the first half of the year to about 90, 000 tons in
October.
Silting problems continue to hamper entry into Hai-
phong. Some heavily laden ships have been forced to
wait ten days or longer for a high enough tide to carry
them over the sand bar into the main harbor channel.
If the problems at Haiphong become worse, the Com-
munists could begin to offload ships outside the port area.
There are many potential island anchorages nearby from
which cargo could be lightered by barge to shore. The
barges are vulnerable, however, and Hanoi would prob-
ably use them only as a last resort.
In the Laos panhandle area, it is clear that the re-
sumption of supply shipments to South Vietnam following
the rainy season is now well under way./
120 trucks moved
in a southerly direction along Route 23 just south of the
Mu Gia Pass. Stockpiling has been under way in the pass
area since September.
over 300 trucks were operating on Route 912�
e second road from North Vietnam into Laos--during
late October.
15 Nov 67
1
TOP ET
Approved for Release: 2018/06/28 C03009601
3.5(c)
3.3(h)(2)
3.3(h)(2)
3.3(h)(2)
Approved for Release: 2018/06/28 C03009601
T II AlLAN D
Tonle \
St
NORTH
VIETNAM
nkon
Demilitarized Zone
1,..OUANG TRI
Hue
'iTHUA THIEN
'll'a Nang
( QUANG NAM COR' '
-
Al----
"� QUANG TIN
PIU
AN
ANG
KI FN
PHONG
K.rN PHONG
HIN H
G'',ANG
\ VIZ,HN.
GIILF OF /It ( /clAUONG
i, THIEN/`
- SIAM !
a,
-� BAC LiEy----
XUYEN i CORP
1 i
KILN
TUONG
QUANG
NGAI
Dak To
KttNTUM
BINH �OIN
PLEIKU
DARLAC
..QUANG DUG
AIN I-I
f)LONG
HAU
SJ 61,4
Hos
PHUOC
L.0 N
TUY
HINF
UONG LONG
KHANH
PHUOC
LONG
AN
GO �ON
Vu g a
N H Capit
M DONG
BINH
TOY
BINH
HUA
Special Zone
PHU y
YEN \
II CORPS
KHAN
HOA
AM RANH
NINHL6k7
THUAN/
SOUTH VIETNAM
CO TIAL
0 �
25
"
50
7
100Miles
t.:s1.1
0 25
.
50
75
Ins Kilometers
686S5 11-67 CI
15 Nov 67 CENTRAL INTELLIGENCE BULLETIN Map
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601
1 UP 'KE'l.
3.5(c)
South Vietnam: Military action in the central high-
lands has slackened at least temporarily. Two American
facilities in the Dak To area were hit by heavy mortar as-
saults on 13 November, but only light casualties were sus-
tai ned.
15 Nov 67
TOP RET
Approved for Release: 2018/06/28 C03009601
3.5(c)
3.3(h)(2)
3.5(c)
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601
NR
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601
NR
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601
NR
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601
NR
1.t
Top cret
Approved for Release: 2018/06/28 C03009601
Approved for Release: 2018/06/28 C03009601