1. POSSIBLE CONSTRUCTION OF AIRCRAFT CARRIERS AT NIKOLAYEV 2. SHIPS UNDERGOING REPAIR AT NIKOLAYEV
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
02705661
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
1
Document Creation Date:
July 13, 2023
Document Release Date:
May 3, 2022
Sequence Number:
Case Number:
F-2021-02351
Publication Date:
April 7, 1951
File:
Attachment | Size |
---|---|
![]() | 103.23 KB |
Body:
�
00"
Approved for Release: 2022/03/30 CO2705661
CLASSIFICAT \vtk, . VO7
ID US OFFICIALS ONLY
CEN 1 ELLIGENCE AGENCY REPORT NO.
!INFORIVIAINON REPORT .
COUNTRY USSR (Ukrainian SSR)
DATE DISTR.
7 April 1951
UklefECT 1,
Pcseible Construction of Aircraft Carriers at
Nikolayev
NO, OF PAGES
a.
2.
Ships Undergoing Repair at Nikolayev
PUCE
'1\16. OF ENCLS.
ACQUIRED
(IASTED BELOW)
(b)(1)
(b)(3)
DATE OF .
iNFO.
SUPPLEMENT TO
REPORT NO.
-sIT.TIZEMee4'Tr,.;Lee-,MkiEEEgreMYEIMEtZ,Ssee,
SCCW3Vii'Z' r.4fIVIINS dlIFORIMTION asrEcrine THE:, EIATIOUM.asrelesv
r rzr orn-Im.) o7n72.1: uncam Tnr. mamma a9 tie CZIIICNAC3 ACT Ott
Vi A'J ASTAISCCL. TCANSIIIISSICTI on THU SIMIII,ATION
' ITO CCATIr.VC /El CIT7 MAIIKTI 70 AT oritimonazo DEIZSCIA IS PSI,.
WUTZSD eV e.P.1 PEPCOCCCTION VS' MIS fS PECHISITTS,
'WEkjthggenirFS1LfftlC,AaVZVAEErtaBEE27
,SOURCE
(b)(1)
THIS IS UNEVALUATED INFORMATIO14"3)
As of mid-barch 1951, the following situation existed at the Marti (W(1)
Shipyard at Nikolayev (46N, 32-00b) Activity has been on the (b)(3)
increase, with about 24,000 workers employed. There are at the ship-
yard two large ways about 400 meters in length, eight fixed three-ton
cranes with horizontal arms on steel table bases, one 30-ton movable
crane on girder tracks, and an electric power central of three turbo-
generators with a total capacity of 27,000 kw.
One of the ways now contains the incomplete. hull of an aircraft carrier
with an estimated tonnage of 20,000. In addition to this informants
direct observation and three photographs of fair Quality, the vessel
has been so described by another informant, who added that German
technicians who worked on the Graf Zeppelin are employed on the project.
3. A second way contains another hull about 20 meters shorter than the
above-mentioned one and in a less advanced stage of construction. It
also is believed to be an aircraft carrier.
Informant had the impression that the construction program is imposing,
but the quality of the workers and the experience of the technicians
evidently are below the requiremente for work-schedules. The above-
mentioned vessels are not expected to be ready for three years, The
hull described in Para. 2 has been on the way for some time without
substantial progress.
The following ships were in Nikolayev harbor in' mid-Larch 1951:
The ex-Italian battleship Giulio Cesare was undergoing modifications
of the forward superstructure, installation of radar equipment, and
modification of anti-aircraft defenses.
b. The cruiser ex-Duca d'aosta was still in the first stages of being
refitted. It was being painted with red lead and few workers were
aboard. Anti-torpedo boat and anti-aircraft artillery had been removed.
This ship will require another SaZtof work�
CLASSIFICATI
ARMY AR x rat
L US OFFICIALS ONLY
I
I Ti
�
AZVERF44 FOR DECLASSIFICATION ACTION
Approved for Release: 2022/03/30 CO2705661