PROJECT STATEMENT OF OBJECTIVES: GIVEAWAYS FOR ARAB AMERICAN SCHOLARSHIP DINNER

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
0005547903
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
2
Document Creation Date: 
June 24, 2015
Document Release Date: 
March 18, 2011
Sequence Number: 
Case Number: 
F-2009-01792
Publication Date: 
February 17, 2009
File: 
AttachmentSize
PDF icon DOC_0005547903.pdf54.45 KB
Body: 
(b)(3) Project Statement of Objectives: Giveaways for Arab American Scholarship Dinner As specified in Item 3.1.1 and 3.1.2 of the Tasking section of the Statement of Work (SOW) for Task Order 005, the Contractor shall provide development and production of marketing giveaways and accessories for the RRC. This Statement of Objectives (SOO) details the specific project objectives relating to the purchase of giveaways for the Arab American Scholarship Dinner to be issued as part of that task order. The services for this project will be provided on a Firm Fixed Price basis. No work shall commence on this project prior to receipt of a properly authorized Work Authorization. Any change to this SOO shall come via issuance of an addendum and modification to the original Work Authorization document. The Contractor shall accept no oral change orders. The anticipated period of performance for this project is six (6) weeks from receipt of the Work Authorization document. 3.0 TASKING 3.1 Purchase of reusable tote bags and insulated travel mugs. 3.2 The contractor shall: 3.2.1 Purchase one hundred (100) tote bags and insulated travel mugs. 3.2.2 The tote bags and the travel mugs must have The Lebanese Heritage Club Logo as well as the CIA Logo on them. 3.2.3 The giveaways should be made in the U.S.A. 4.0 DELIVERABLES 4.1 Delivery of all reusable tote bags and insulated travel mugs listed in 3.1 to a location specified by the Government by April 10, 2009. 5.0 SPECIAL CONSIDERATIONS UNCLASSIFIED APPROVED FOR RELEASE^ DATE: 01-Oct-2010 5.1 Quality Requirements: 5.1.1 The Contractor shall ensure that the design updates/changes meet the program objectives. 5.1.2 The Contractor is expected to inspect all products before finalizing delivery to the CIA. Inspection shall be performed by the Contractor on-site at manufacturer/production facilities or by random sample sent to Contractor. 5.1.3 The CIA will provide written notice of acceptance within 48 hours of receipt of products.